Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance NA | ₹3.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M.P.Thufail L1 |
|---|---|---|---|---|
| 1.00WELL FOR CENTRE NO:73 ANGANAWADI | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 19.51 | cum | 350 ₹6,828.85 Lowest |
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 48.36 | cum | 350 ₹16,926 Lowest |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 16.12 | cum | 400 ₹6,448 Lowest |
| 1.00 | OD432538/2025-2026:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil 3.00m to 4.50m | 16.12 | cum | 400 ₹6,448 Lowest |
| 1.00 | OD432537/2025-2026:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (4.5m to 6.00m) | 16.12 | cum | 450 ₹7,254 Lowest |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 56 | hour | 400 ₹22,400 Lowest |
| 1.01 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.33 | cum | 9,600 ₹51,148.8 Lowest |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 50.94 | sqm | 500 ₹25,468 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 606.5 | kilogram | 105 ₹63,682.5 Lowest |
Tender Value
₹3.6 L
EMD Value
₹9,073
Closing Date
22 Aug 2026, 10:00 amClosed
ASSISTANT ENGINEER
Office of the Assistant Engineer,LID EW Section Ayancheri Grama Panchayath
Annual Plan AYANCHERI GP 2025-26 PRO NO 248 25 26 OPEN WELL FOR ANGANAVADIES CENTRE NUMBER 71 73 78 81 83 General Civil Work naveekaranam Ward 11 General Civil Work
2026_LSGD_864304_5
01/AE/LIDEW/AGP/2026-27
Open Tender
Civil Works - Roads
Item Rate
180 days
AYANCHERI GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹800
Yes
₹9,073
Yes
24 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WELL FOR CENTRE NO:73 ANGANAWADI | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.002 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 1 | cum | - | - |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | - | cum | - | - |
| 1.004 | OD432538/2025-2026:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil 3.00m to 4.50m | - | cum | - | - |
| 1.005 | OD432537/2025-2026:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil (4.5m to 6.00m) | - | cum | - | - |
| 1.006 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.007 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 1.008 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | - | sqm | - | - |
| 1.009 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1462711.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.82 MB
preliminaryagreement.pdf
Tender Documents • 0.20 MB
ipact.pdf
Tender Documents • 0.23 MB
formoftender.pdf
Tender Documents • 0.17 MB
epay.pdf
Tender Documents • 0.23 MB
affidavit.pdf
Tender Documents • 0.08 MB
nobid.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .