Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.5 LAccepted-AOC A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | 1 | Accepted-AOC L1 | |
| 2 | 2₹18.0 L+₹1.1 L (6.45%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹22 L+₹5.1 L (30.2%)Rejected-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | 3 | Rejected-Finance L3 |
Tender Value
₹15.9 L
EMD Value
₹31,400
Closing Date
23 Aug 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Kutehla, Tanbol Zagatkhana in Tehsil Sh. Naina Devi Ji District Bilaspur (SH Operation for pumping machinery and distribution system for one year)
2024_HPIPH_91743_1
BLP-BLP-00736 NIT No. 6186-6285 dated 09/08/2024
Open Tender
Civil Works
Item Rate
365 days
Sub Division Swarghat Section Swarghat
Please refer Tender documents.
8 documents required · 8 mandatory
₹400
Yes
EE JSV Bilaspur
₹31,400
Yes
21 Sept 2024
13 Aug 2024
23 Aug 2024
13 Aug 2024
23 Aug 2024
13 Aug 2024
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Kutehla, Tanbol Zagatkana whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 3 Nos pump house, 1 No Jack well, 11 Nos storage tanks. Rising main: 7800 Rmt Booster stage, 1st stage & 2nd stage=150mm dia. Distribution system:13 Rmt Pumping machinery:LWSS Kutehla Tanbol Zagatkhana: Booster stage:1x10=20HP, (2x20=40HP),1st stage 2x150=300 HP and 2nd stage 2x150=300 HP. No of storage tanks: 11 Nos, 22 Nos habitations, Total working hours 71: through , 13 Nos persons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: Litr). Pumping hours per day ( ) and energy consumptoin per day Unit.
vishal thakur govt contractor
Pawan Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .