Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
7 Aug 2026, 6:00 pmClosed
The Chief Officer, Karjan Municipality, Karjan
Comprehensive Operation and maintenance of works for 5.2 MLD Sequencing Batch Reactor (SBR) based sewage treatment plant at Karjan , Gujarat for Karjan Nagarpalika for 2 (Two) years.
327615
1 of 2026-2027
Open
Miscellaneous Works
Fixed-rate
Vadodara
1 document required · 1 mandatory
₹5,000
CHIEF OFFICER, KARJAN NAGARPALIKA, KARJAN
₹1.7 L
24 Jul 2026
24 Jul 2026
24 Jul 2026
7 Aug 2026
24 Jul 2026
Technical Bid Document Opening Date
Price bid opening Date 19/08/202612.05hrs.onwards
Officer Inviting Bids: Chief Officer Karjan Nagarpalika.
Bid Opening Authority: Chief Officer Karjan Nagarpalika.
Address: Chief Officer Karjan Nagarpalika.
Contact Details: +91
Tender Terms and Conditions
(A) Details of Tender item:
Sr. Name o fWork Estimated EMD Tende Perio
No. Tender r fee d of
Value (Rs) (Rs.) In Rs. compl
1. Operation and maintenance of works for 1,68,55,940/- 5000.00
5.2 MLD Sequencing Batch Reactor 1,68,560/
(SBR) based sewage treatment plant at Months
Karjan , Gujarat for Karjan Nagarpalika
fortwo (02) years(Extendable depends
(B) Eligibility(if any):-B-Class & Above (Electrical & Mechanical)
(i) Site Visit(If any) Site Visit Certificate is must duly sign by
Authorized person of Nagarpalika.
(ii) Submission of EMD Tender fee F.D.R. for E.M.D. & D.D. for Tender fee Shall be
Submitted in electronic format only through online
and other Documents during
(by Scanning) While uploading the bid This
office hours by RPAD. submission shall mean that E.M.D. and tender fee
are received for purpose of opening the bid
Accordingly offer of those shall be opened whose
E.M.D. and tender fee is received electronically.
However, for the purpose of realization of bidder
Shall send the Tender Document, F.D.R. and D.D. in
original to chief officer Karjan Nagarpalika
Karjan to send through R.P.A.D / Speed post so as
to reach to Chief officer Karjan Nagarpalika
Karjan . Till Dt.17/08/2026 to 18.00 Hrs.
Penaltative action for not submitting D.D. and
F.D.R. in original to Chief officer by bidder shall be
initiated. Exemption Certificate is not allowed.
Bidder shall have to be submitted both the F.D.R.
and D.D. electronically through online. Any
documents in supporting of tender bid shall be
submitted in electronic format only through online
(by scanning etc) and also hard copy will accepted
• Bidders can download the tender document free of cost from the website.
• Bidders have to submit Tender in Electronic format only on above mentioned website
till the Date & time shown above.
• Offers in physical form will not be accepted in any case.
Bidders who wish to participate in online tenders will have to procure / should have
legally valid Digital Certificate (Class-III) as per Information Technology Act-2000 using
which they can sign
theirelectronicbids.BidderscanprocurethesamefromanyofthelicensecertifyingAuthorityof
All bids should be digitally signed for details regarding digital signature certificate and related
training involved the below mentioned address should be contacted:
KARJAN Nagarpalika
Dist:- Vadodara.
KARJAN- 391240(Gujarat)
r can contact Karjan Nagarpalika.
KARJAN NAGARPALIKA
Name of work :- Comprehensive Operation and maintenance of civil,
mechanical, electrical and instrumentation work for 5.2 mld SBR
based sewage treatment plant at KARJAN , Gujrat for KARJAN
nagarpalika for 2(Two) years.
TENDER DOCUMENT
Milestone Dates
Downloading of tender documents start From date :- 24/07/2026, 15:00 Hrs.
& end date Up to date :- 07/08/2026 till 18:00 Hrs.
Online submission of bid date Up to date :- 07/08/2026 till 18:00 Hrs.
Date & time of physical submission of Submission of EMD, Tender fee and other
document date supporting documents in physical form
during office hours on 17/08/2026 till
17:00 Hrs. in office of the Chief Officer,
Karjan nagarpalika, Dist. Vadodara by
R.P.A.D. Post / speed post only
Online opening of the technical bid date On date :- 19/08/2026 & 12:00 Hrs.
Venue : Office Of the Chief Officer Karjan
nagarpalika, Karjkan. Dist. Vadodara.
Karjan Nagarpalika
KARJAN NAGARPALIKA
(ONLINETENDERNOTICE2026-2027)
Online tender (E-Tendering) for below stated works are invited by Chief Officer KARJAN
Nagarpalika, KARJAN pin 391240 from experienced & approved in appropriate class contractors
registered in state road and building department Narmada water and Kalpasar department or
Sr. Name OfWork Estimated Earnest Tender Fee in Time Limit for
No. Cost Rs. Money Rs.(Non Completion of Work &
Deposit Refindable) Class
1 Comprehensive 1,68,55,940/- 1,68,560/- 5,000/- 24 Months (B Class
Operation and & above) (Electrical)
maintenance of civil,
mechanical electrical
and instrumentation
work for 5.2 mld SBR
treatment plant at
KARJAN ,Gujrat for
KARJAN nagarpalika
for2 (Two) years.
(2) SCHEDULEOFE-TENDERING
(I) Bid Document Downloading start Date From Dt.24/07/2026
(ii) Bid Document Downloading End Date Dt. 07/08/2026 Up to 18:00Hrs.
(iii) Bid Document Opening Date Dt.19/08/2026 At 18:00Hrs. KARJAN Nagarpalika
(iv) Physical Submission of EMD tender fee From Dt.17/08/2026 to on or before Dt.17/08/2026
and other documents by R.P.A.D./ Up to 18:00 Hrs.
speed Post to Chief Officer, KARJAN
Nagarpalika, KARJAN - 391240 Dist.
Vadodra. (DD of Tender Fee and FDR of
EMD in Original Shall be sealed in one
envelope and other documents in
An other envelope which are both
Enclosed in main big envelop).
Chief Officer President
KARJAN Nagarpalika KARJAN Nagarpalika
Technical Bid Details & Qualifications Criteria
1.0 Eligibility: As per details given in this tender.
2.0 Downloading Tender Document:
Bid documents will be available on website up to Date shown above.
Bidders wishes to participate in this tender will have to register on website
https://nagarpalika.nprocure.com
3.0 Digital Certificate:
Bidders who wish to participate in online tenders will have to procure / should have legally valid
Digital Certificate (Class III) as per Information Technology Act-2000 using which they can sign
their electronic bids. Bidders can procure the same from any of the license certifying authority of
India or can contact (n) code solutions – a division of GNFC Ltd, who are licensed Certifying
Authority by Govt. of India.
4.0 All bids should be digitally signed, for details regarding digital signature certificate and
related training involved the below mentioned address should be contacted:
Karjan Nagarpalika
Nava Bazar, Ta:-
Karjan - 391240 (Gujarat)
Bidders who already have a valid Digital certificate need not procure a new Digital certificate.
4.0 Pre-Bid Conference:-
5.0 Online Submission of Tech-Bid & Price-Bid.
Bidders can prepare and edit their offers number of times before tender submission date and
time. After tender submission date and time, bidder can not edit their submitted offer in any
case. No written or on-line request in this regard shall be granted.
Tendered shall submit their offer i.e. Technical Bid as well as price bid in electronic format on
above mentioned web site and date shown above after Digitally Signing the same
Offers submitted without Digitally signature will not be accepted.
Offers in physical form will not be accepted in any case.
6.0 Submission of Tender Fees, Bid Security and qualification criteria and other
F.D.R. for E.M.D.& D.D. for Tender fee Shall be Submitted in electronic form at only through
online (by Scanning) While uploading the bid. This submission shall mean that E.M.D. & tender
fee are received for purpose of opening the bid. Accordingly offer of those shall be opened
whose E.M.D. & tender fee is received electronically. However, for the purpose of realization of.
bidder Shall send the F.D.R. & D.D. in original to chief officer Karjan Nagar palika, Nava Bazar,
Karjan pin – 391240. to send through R.P.A.D/Speed post so as to reach to Chief officer Karjan
Nagar palika . up to date 17/08/2026 up to 18.00 Hrs. Penetrative action for not submitting
D.D. & F.D.R. in original to Chief officer by bidder shall be initiated. Exemption Certificate is
not allowed. Bidder shall have to be submitted both the F.D.R.&D.D. electronically through
online. Any documents in supporting of tender bid shell be Submitted in electronic form at only
through online ( by scanning etc.) & hard copy will not be accepted separately
Tender Fee: Rs.5000/- (Rupees Five Hundred Only) by Demand Draft in favour of "Chief Officer,
Karjan Nagarpalika, Karjan ",payable at Karjan . From any Nationalized / Scheduled Bank except
Co-operative Bank. Demand Draft issued after the last date of submission of Bids will not be
considered or accepted.
Bid Security i.e. EMD: Rs.1,68,886.00 (: Rupees: One Lakh Sixty Eight Thousand Eight hundred
Eighty six rupees Only) in the form of FDR in favour of “Chief Officer Karjan NagarPalika Karjan
” from any Nationalized /Scheduled Bank /Co-operative Bank. FDR shall be valid up to 180 Days.
FDR issued after the last date of submission of tender will not be considered as valid or will not
accepted in any case.
Other Documents required to be submitted through on line in electronic format through scanning.
(a) copy of minimum B - Class & Above in Electrical / Mechanical Reg. Certificate
From state R&B or any other government department.
(b) Solvency Certificate of 20% Amount of tender Estimated cost of current financial
(c)Experience certificates with 3-A certificate showing successful completion of Similar work
of “O & M” Of STP or WTP or Comprehensive “O & M” work of Drainage Pumping Stations of
for Minimum Two Year in single contract in municipal corporation or
(d) In case of limited Company Registration Certificate as per Indian Companies Act
and Article of Association and Memorandum of Association with details of Board
Or Directors etc.
(e) Valid power of attorney. (if necessary)
(f) F.D R / Demand Draft as shown in above para.
(h) Balance sheet of last three financial years, i.e. years 2023-24,2024-25 & 2025-26,
with turn over certificate from C.A. of minimum annual average turn over per year should
not be less than (30% of tender amount ) Rs 50,66,580/- in last three above financial
(I)work order & 3-A certificate copies of similar work experience during last seven years
(last day of month previous to the in which applications are invited) for the similar work
completed experience of comprehensive operation and maintenance contract of STP /
WTP / Sewage water pumping stations in nagarpalikas, Municipal Corporation and other
Government / semi Government / Govt. Board or other Government Departments as
The bidder(s) should have three similar work completed which costing not less than
the amount equal to 40% of the tender estimated of the amount put to this tender during last
seven years, or
The bidder(s) should have two similar work completed which costing not less than the amount
equal to 50% of the tender estimated of the amount put to this tender during last seven years,
The bidder(s) should have one similar work completed which costing not less than the
amount equal to 80% of the tender estimated of the amount put to this tender during last
seven years. Put completion certificate in form - (3A) copies.
(j) GST Reg. Certificate must be attached.
(k) Joint venture is not allowed.
(l) The Bidder should not have been blacklisted / Terminated / banned by Government of India
/ Government of Gujarat of any state Board / Corporation as on the date of bidding. A
Declaration / Affidavit in this regard on Rs300/- Stamp Paper, as per format given, duly
Notarized Shall Have to be Submitted by bidder along with the tender.
(m) Bidder’s Technical Staff Details with employment letter copy.
(n) E.P. Fand ESIC last six month payments receipt of minimum 15 labour must be attached.
(o) Site visit certificate dully sign by chief officer./ engineer in charge of nagarpalika.
(p) Valid registered partnership Deed certificate copy (if applicable).
(q) Valid Electrical supervisor or contractor license copy
(r) income tax return certificated of last 3 financial years i.e. 2023-24, 2024-25 & 2025-26.
(s) Details of firm’s workshop with different necessary tools and tackles.
(t) Any other Supporting Documents.
Bidder has to submit the documents as said in above and no other condition in any form shall be
considered at all, at the time of evaluation of the tender i.e. the bidder shall have to submit
unconditional offer without differing from any of the tender condition.
7.0 Opening of Tender:
Opening of Technical & price bid documents will be held on Date & time shown in the tender notice at
the office of Chief Officer, Karjan Nagarpalika, Karjan -391240.
Intending bidders or their representative who wish to remain present at Nagarpalika premises at the
time of tender opening can do so.
8.0 Contacting Officer:
In case bidder needs any clarification / assistance or if training required for participating in
online tender, they can contact at Karjan Nagarpalika office.
9.0 SPECIFICINSTRUCTIONTOAPPLICANTS:
The Contract will be per months rupees rate contract. The Bidders have to quote rate should be
including applicable GST & all other taxes & duties.
The language for submission of prequalification documents along with the tender documents
shall be ENGLISH. If information is provided in another language, it shall be accompanied by a
translation of its pertinent parts into ENGLISH. This translation will govern and be used for
interpreting the information.
The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or Engineer-in-
The blank tender form could be down loaded free of cost by the interested bidder, however the
following documents duly have certified along with application & tender fee shall have to
furnish to The Chief Officer, Karjan NagarPalika, Nava Bazar, Karjan - 391240 during
scheduled date and time fixed for the purpose.
The enclosed schedules should be filled in completely and, if any particular quarry is not
relevant, it should be stated as ‘Not applicable’ Financial data, project cost value of works etc.
should be given in equivalent Indian Rupees only. Failure to provide information which is
essential to evaluate the Applicant’s qualifications or to provide timely clarification or
supplementation of the information supplied may result in disqualification of Applicant.
The fees for online tender document will not be refunded under any
circumstances. E M Din the form specified in tender document only shall be
Tenders without Tender document fees, Earnest Money Deposit (EMD) and which do not full fill
all or any of the condition or submitted incomplete in any respect will be rejected.
Conditional tender shall not be accepted.
The tender notice shall from apart of tender document.
The tenderers are advised to read carefully the “Instruction for Tenderer” and “Eligibility
Criteria” contained in the tender documents.
The Internet site address for E-Tender is https://nagarpalika.nprocure.com and that of
corporate web site is www.nprocure.com
The Karjan Nagarpalika, Karjan reserves the rights to accept or reject any or all tenders
without assigning any reasons thereof.
Chief Officer Karjan Nagarpalika
KARJAN NAGARPALIKA
Name of Work : Comprehensive Operation and maintenance of civil, mechanical, electrical and
instrumentation work for 5.2 mld SBR based sewage treatment plant at Kadi, Gujrat for
KARJAN nagarpalika for 2 (Two) years.
SPECIAL CONDITIONS OF CONTRACT
The following Special Conditions of Contract shall supplement the General Condition of
Contract. Whenever there is a conflict, the provisions herein shall prevail those in the
General Conditions of Contract. The corresponding clause number of t h e G e n e r a l
Conditions of Contracts is indicated in bracket.
The Employer is KARJAN NAGARPALIKA
3. PERFORMANCE SECUTIRY
The Performance Security shall be in form of Bank guarantee for the amount equals to 5% of
the Contract price.
Contractor shall carry sufficient inventories to assure ex-stock supply of consumable spares
such as Bearing gaskets, plugs, washers, bolts, etc. Other spare parts and components
shall be provided by contractor as promptly as possible but in no case later than one week. The
contractor has to provide the material of standard make.
5.1 Payment shall be made by the NAGARPALIKA within 30 days subsequent to the
submission of such invoice(s)/claim(s) by the Contractor and approval of the
monthly O & M report, if possible. Payment for the bill submitted by contractor for
any month shall not be released, unless the monthly (O & M) report is submitted by
the contractor.
5.2 The Contractor shall have to submit the following documents along with the bills :-
1) Maintenance / Repairing work carried out in the machineries.
2) Third Party report of inlet and Outlet sample of Sewage for respective month from
Govt./GPCB approved laboratory for following parameters pH, TSS, TDS, BOD, COD,
Total Phosphorous, Total Nitrogen, Res. Chlorine, Fecal coliform.
3) Day-to Day report of treated water quantity and quality, energy Consumption power
factor and sludge generation in kg.
4) Staff attendance sheet.
5.3 The NAGARPALIKA Shall deduct from the amount payable to the Contractor, any
amount paid by NAGARPALIKA on behalf of the Contractor.
6.1 Prices/charges by the Contractor for the performance of the obligations and
services under the Contract shall be firm and shall not be paid any escalation
whatsoever for the entire period of the Contract.
7. LIQUIDATED DAMAGES
7.1 If the Contractor does not recruit/deploy the 'Key Personnel' identified as per
the schedule, penalty Shall be as per clause no. 3.7 of Operation and Maintenance
7.2 The plant or any unit should not be shut down condition for more than 24 hours
for minor Fault and 3 Days for Major Fault for any reason or any technical fault. If
the fault is not rectified for more than above mentioned periods then penalty at
the following rates Shall be charged.
For total shut down (excluding MGVCL power failure) of plant- Rs, 1000/- per hour
For any Elect/Mech/Instrument Equipment excluding Air Blower in non- working condition (1)
up to 5 days – 700 Rs. Per day per equipment (2) More than 5 days –1000 Rs. Per day per
equipment’s up to no limit.
For Air Blower (1) up to 5 days – 1500 Rs. Per day (2) More than 5 days – 2000Rs. Per
day up to no limit.
Average power factor in MGVCL bill must be greater than 0.9 and if any penalty/charge levied
due to low power factor, then it Shall be recovered from the contractor without any reasons.
In case or any reason the staff of contractor refuses to work or goes on strike, Penalty of Rs.
25,000/- per incidence Shall be charged & during contract period 3 (three) no. of cases of strike
shall be sufficient cause to terminate the contract and to proceed for the blacklist of the
contractor for 2 (Two) years in KARJAN NAGARPALIKA for any work
7.3 If outlet standards are not achieved as per norms, the liquidated damages shall be
charged as per following. (For nonperformance in meeting the Output Standards for
Treated Sewage set as per GPCB Norms)
Event During the O & M Period Liquidated Damages
triggering the recoverable on
recovery of Termination as a
Liquidated percentage of the
Damages immediately preceding
year's Fixed & Variable
Liquidated Damages Frequency
conformance with For every
BOD 10000 liters
standards as per for every day
GPCB Norms Rs. 2.00 of non 5%
conformance 10000 liters
with COD for every day
standards as of non-
per GPCB Rs. 2.00 conformance 5%
conformance 10000 liters
with TSS for every day
standards as per of non-
GPCB Rs. 2.00 conformance 5%
7.4 If housekeeping and lighting is not maintained as per standard level, penalty of Rs.100
per day Shall be charged
8. RESOLUTION OF DISPUTE
8.1 In the case of a dispute between the Employer and Contractor, the dispute shall be
referred to adjudication / arbitration in accordance with the Indian laws. The area of
jurisdiction shall be KARJAN.
OPERATION & MAINTENANCE ASPECT & Other Terms and Details
2 Laboratory Details
3 Comprehensive Operation and Maintenance
4 Operation & Maintenance Specification
Operation and maintenance of the treatment plant is very much essential for
sustainability of the treatment plant and to achieve discharge standards. The
operational aspects include regular checking of the performance of the units including
the electrical and mechanical equipment’s, to identify any non-functionality of the units to
evolve the strategic measures to be taken to make the plant fully functional to meet the
stipulated standards. Plant shall be operated as per design criteria. Variance in input value of
design criteria should record.
The Plant Manger and the Plant Engineer are the bridge in between the plant management staff
and the plant, and are responsible for the operation and maintenance of the treatment plant.
So experienced persons should be posted. (For detailed descriptions of the duties please refer
job descriptions in the subsequent heading). All the activities of the treatment plant are to
be scheduled and coordinated by the Plant Manager. The Plant Manager Shall also be
responsible and capable for taking decisions like shutting down the treatment plant or to
by- pass the wastewater etc. in case of emergencies, after having proper deliberations
with the management and the operational staff. The Contractor should take every necessary
steps to carry out the Operation & Maintenance of the Plant, so as to achieve the desired results as
per G.P.C.B norms & as per tender.
2. LABORATORY CONTROL OF THE PLANT OPERTION
The contractor shall maintain sufficient operating staff as in this document and at any given
point of time. The discharge the treated effluent should be as per the stipulated discharge
standards. In order to ensure this, regular sampling and analysis shall be done by the central
laboratory of KARJAN NAGARPALIKA. Besides it Shall be the responsibility of the contractor
that, every month he Shall have to get the samples of the influent and effluent get analyzed by
the third party laboratory approved by the Govt./GPCB at his own costs and submit the same
to the “Authority”. The sample collected shall Govt./GPCB be sent to KARJAN NAGARPALIKA lab
also for analysis (if required) at the same time.
3. Comprehensive Operation and Maintenance
1.0 The contract includes o p e r a t i o n and maintenance of entire Sewage Treatment Plant
including up gradation of Plant on round the clock basis for a period of 24 Calendar
Months (Two Years).
1.1 Contract period :-
This contract is for Two years (24 months). If contractor’s work found satisfactorily, Nagarpalika,
KARJAN may extend this O&M contract or additional 02 years as per mutually consent of each party.
2.0 The Sewage Treatment Plant set up on turnkey basis shall be operated and maintained by
The contractor including all works. contractor has to incur all the costs, taxes, vat, duties,
transportation, labour, machining, welding, repairing, replacing and making good any and
all parts/plant equipment, consumables, motors, pumps, gear unit, capacitor, HT/LT
switchgear, PLC panel, lighting system, cables, battery charger, battery, instruments, meters,
chemicals for laboratory etc.
2.1 Average power factor in MGVCL bill must be greater than 0.9 and if any penalty/charge levied
due to low power factor, then it Shall be recovered from the contractor without any reasons.
All the capacitor panel must be kept in working condition to keep GEB power factor more
than 0.9 by the contractor. Any spares required to keep capacitor panel in working condition
is in the scope of the contractor. The spares required for LT capacitor panel must be procured
and replaced immediately, if required. No spares for capacitor panel & LT capacitor panel in
any circumstances Shall be provided by KARJAN NAGARPALIKA. Penalty on account of poor
power factor (i.e. less than 0.9) as explained elsewhere Shall be recovered from the contractor
from his monthly O&M bill.
The Contractor Shall be held responsible for O & M and satisfactory performance of the
STP. Major components and works shall include the following but not limited to:
a. Operate the plant efficiently for Two year (24 hours/day & 365 days/year), including all
consumables, parts or components, labour transportation and other charges, except for cost
of power and supply of raw sewage. Power cost would be borne by Employer. Raw sewage
shall be supplied by employer.
b. Operate and maintain all units and equipments of the Sewage Treatment Plant as per the
requirement of the process to meet continuously and consistently desired treated sewage
characteristics in conformity with specifications and GPCB guidelines; maintain all equipment
in good working condition.
c. Attend breakdown of civil, mechanical, electrical, piping and instrumentation works and
maintain the plant and equipment throughout the Contract Period.
d. The operation and maintenance service provided by the Contractor for the period
specified in the Contract shall ensure the continuous operation of the Plant and that the
breakdown or deterioration in performance, under normal operating conditions, of any items of
Plant and equipment and component parts thereof is kept to a minimum. The contractor shall
determine operating parameters, select settings (chemical dosages etc.) and generally
optimize the process, and working of the treatment plant.
Excessive chemical dozing i.e. doze more than / less than normal should be avoided
f. The Contractor shall adhere to the manufacturers’ recommendations with respect to
equipment maintenance, consumables, the types and grades of lubricants to be used,
frequency of lubrication, adjustments to be made regularly and recommended spares to be held
g. The spares, tools and tackles supplied by contractor as specified herein as a part of this
tender obligation are property of employer and employer has no obligation to supply the same
to contractor for carrying out any rectification work. Contractor for the purpose of O&M shall
have required spares in stock at site and maintain a record of the same. In case if employer
hands over any spare for carrying out rectification in emergency situation, the same shall be
handed over back by contractor to KARJAN NAGARPALIKA within reasonable period of time
and not exceeding a maximum of 4 weeks duration in any case. Failing to do so, KARJAN
NAGARPALIKA reserves the right to deduct the price of same from O&M bill/Security
Deposit of contractor. Arranging necessary tools and tackles for effective and efficient O&M of
the plant is responsibility of contractor.
h. The contractor shall provide timely planning and regular procurement of all required
spares and consumable including chemicals, chlorine tonners, grease, lubricating oil,
cleaning agents, laboratory reagents etc. Contractor shall arrange for the requirement well
i. Maintaining Logbooks / Records of the work carried out to keep them in good working
condition. He shall obtain approval of the format of logbooks and records from Employer.
j. The Contractor shall prepare and implement an effective plant maintenance program in
consultation with the Employer. It is absolutely the Contractor’s responsibilities to look after all
sorts of maintenance whether routine, preventive or break down or any other type of
maintenance. The Contractor Shall be responsible to carry out day to day as well as periodic
maintenance necessary to ensure smooth and efficient performance/running of all equipment.
k. Submission of daily and monthly O & M report.
l. Carry out regular and frequent sampling, analysis and result recording of raw and treated
sewage as per the procedures laid out by the Owner and in conformity with standard methods;
and complying with the GPCB norms and attend GPCB during the monitoring/sampling and
obtaining approval.
m. Employ appropriate and skilled manpower, provide all tools, tackles, equipment,
Laboratory instruments, glassware and chemicals, reagents etc. Required for effective
implementation of the Services detailed above. Any type of accidents in this premises agency is
responsible for it.so agency have to maintain factory laws and must be follow labour laws also.
n. The contractor shall keep records of presence of staff. Maintain register (for physical
presence of deployed staff)
o. Area lighting – The premises of various works are provided with metal halide / sodium vapor
lamps, fluorescent tubes and also ceiling fans/exhaust fans inside the various structures. Daily
on/off operation and routine cleaning of all type of electric fixtures. Replacement of lamps /
Tubes / Fans in case of failure at contractor’s cost.
p. Maintenance of garden – Normally watering the trees once a day or more if
Grass cutting, removal of shrubs, weeds, around tree to be done as directed. Remarking the
ponds around the tree after loosening with soil with supply of additional earth, if required.
Cutting of branches, if required for straight growth of tree/plant and development of garden.
q. All buildings, bathroom, toilet to be kept swept, cleaned and washed daily. Consumable
requirement for cleaning such as acid, harpic, phenyl, air freshner, washing powder,
brooms, wire brushes, duster, bamboos, toilet shop, lotion waste, kharata (broom) shall be
provided and used as required. All ventilators, windows/doors to be cleaned and to keep in
good aesthetic condition.
r. To keep watch on overflowing of sump. If such overflow takes place the agency shall have to
bear the damages caused to surrounding properties.
s. Maintaining laboratory and its all equipments. All materials, equipment and labour shall have to
be employed by the agency to maintain the same.
t. Contractor shall ensure that the sewage entering the plant is not bypassed for more than half an
hour, which is again subject to obtaining prior permission / approval of the employer. In
adverse circumstances of heavy rainfall, contractor may use the plant bypass for the
purpose of attending detritor for a period of maximum one hour. Generally major repair
encountered in SBR Tank etc. shall be attended as quicker as possible. Contractor shall ensure
that the raw sewage undergoes the primary treatment (i.e. after PST to remove BOD of at least
30% and SS of at least 60%) during maintenance of units downstream to aeration tank. In case it
is not possible. The reason for the same to be informed to the Employer within 2 hours.
u. Contractor shall submit one copies of the O & M Manual for approval of Employer, which
may be modified, if required by Employer.
v. The contractor shall monitor the performance of the Sewage Treatment Plant; conduct the
analysis of the influent as well as effluent quality after treatment as per table given below.
Contractor shall initiate and take adequate actions to ensure smooth and satisfactory
performance/ running of the plants on a 24 hours/ round the clock basis.
No. Sample point Freq. of Parameters to be tested at
samplin NAGARPALIKA
1 Raw Sewage at Once in a pH, TSS, BOD, COD
Inlet Chamber day
2 Treated sewage Once in a pH, TSS, BOD, COD, chlorine
3 SBR Once in a DO, MLSS/ MLVSS, SVI
w) For the smooth running of the plant all the required equipment, machineries, accessories, major
and minor spares, consumables including chemicals, greases, lubricants, all cleaning agents,
packing, rubber sheet, laboratory reagents, all hardware, required quantity of white wash, oil
paint colour, all types of epoxy paint, material required for house- keeping and cleaning etc. are to
be brought by the contractor. The quality of all consumable and spare etc. i.e. technical
requirements as per manufacture recommendation shall remain unchanged.
x) To remove/suitably collect dewatered sludge from mechanized dewatering system (belt
filter press), screenings and grit from grit detritor etc. and loading the same into vehicle and
conveying and unloading the same at Low lying area as suggested by KARJAN NAGARPALIKA. The
grit and sludge from the plant is to be transported away from the plant and disposed safely
meeting the GPCB / other statutory authority norms. The disposal shall be done at a site as
indicated by KARJAN NAGARPALIKA. If the contractor fails to remove silt / sludge in the
treatment plant for any reason and beyond the notice period issued by the employer, the same
shall be removed by employer by engaging other agencies and the cost shall be recovered from the
y) The contractor shall carryout cement paint/ enamel paint/ white wash for exterior finish of
civil units once after the end of second year of O & M of the plant and shall also carry out
painting on mechanical equipments/ above ground pipe lines/ hand railing before the end
of second year of O & M of the plant.
z) The contractor shall hand over the plant back to KARJAN NAGARPALIKA on expiry of his
contract in fully working condition satisfying the requirement of treated sewage. All the
electrical, mechanical and instrumentation including standby shall be in perfect working
4.0 The Contractor shall procure, keep at site and use necessary tools, tackles and safety equipments
for day to day routine maintenance, preventive maintenance and break down maintenance.
Also minor and major repairs to the equipment involved in the plant have to be carried out
by the contractor during the O&M period. Contractor shall submit report, discuss and finalize
with the Employer on the major repairs required to be carried out and how these repairs
Shall be undertaken, to the satisfaction of the Employer and obtain written approval from the
Employer before carrying out any major repair.
4.1 The scope also includes cleaning of units, sludge drying beds, clarifier, removing of
foreign materials like debris, sand, fish, frogs or any other dead or live animals and also cleaning
of strainers of each pump quarterly so that required quantity of sewage is treated properly.
4.2 The disposal of the foreign particles like sand, dead or alive animals etc. from all the units
of the plant to suitable place as shown by KARJAN NAGARPALIKA is in the scope of contractor.
The scope of work of contractor includes operation & maintenance of 11 KV MGVCL incoming
line, Lighting Arrestors, D.O. fuse, earthing works, or any other maintenance required on
two/four pole D P structure.
5.0 Contractor to ensure that the sewage entering the plant is not retained for more than half an
hour. In case it is not possible, the reason for the same to be informed to the Employer
5.1 Scope of KARJAN NAGARPALIKA Shall be only to the extent of supplying raw sewage
(at Plant Inlet Chamber) and bear the energy ( Electric Bill ) charges to be paid to MGVCL. In
case of non-availability of sewage due to break-down in SPS or any other reason stipulations in
other parts of the tender shall be referred to.
4.0 OPERATION AND MAINTENANCE SPECIFICATION
1.0 SUFFICIENCY OF TENDER
be deemed to cover all the Contractor's obligations under the Contract and all matters and
things necessary for the operation and maintenance of the Plant. Particular requirements set
forth in the Specification are given without prejudice to the aforementioned general obligations
of the Contractor.
2.0 DOCUMENTS / INSTRUCTION FURNISHED BY THE EMPLOYER
2.1 The Employer may issue at such times as he may think proper during the contract period
instructions as may appear to him to be necessary for the guidance of the Contractor in the
operation and maintenance of the Plant. The Contractor shall be bound by the same, obey and
2.2 The Contractor shall acknowledge the receipt of such instructions in writing or by fax.
The Contractor shall carefully check all such instructions before commencing any Works.
The Contractor shall inform the Employer in writing, within 3 (three) days from the receipt
of the same, of any errors or omissions discovered, or of the difficulty to execute any works or
part thereof in compliance with the written instructions received from the Employer. Failing
to do so contractor shall be liable to execute at their own cost the necessary alterations to any
works resulting from these errors or omissions.
2.3 The Contractor Shall also be furnished with two copies of all instructions as may be
issued by the Employer. One copy of all such O & M manuals and instructions issued to the
Contractor shall be kept in his office at the site. The O & M manuals or instruction shall be
considered valid only if the Employer has signed it.
3.0 CONTRACTOR'S ORGANISATION & ADMINISTRATION OF THE
3.1 The Contractor shall provide experienced administrative, managerial, technical, supervisory,
non-technical personnel and labour necessary to operate and maintain the plant properly, safely
and efficiently on a continuous 24 hours basis for the full term of the O & M Contract Period.
During O & M period if any expert / technically knowledgeable / special persons or manpower
needed, he shall have to arrange & bear / pay any and all cost, charges, fare, allowances etc. for
the same. The employer Shall not pay any cost / charges for the same.
3.2 The qualifications and capability of the Contractor’s personnel shall be appropriate for the
task they are assigned to perform. The staff provided shall be fully trained in the operation of
the various units of the Treatment Plant before being given responsibility for operating any
part of the Plant. If in the opinion of the Employer, any member of the Contractors staff is
considered to be insufficiently skilled or otherwise inappropriate or not doing the work
properly he is required to perform, he shall be replaced by the Contractor with a person
with the appropriate skills and experience for the task, to the satisfaction of the Employer. The
Contractor Shall be required to submit to the Employer the Schedule of ‘Manpower’ and
‘Organization Chart’. The contractor shall keep all the details, bio-data, photograph, references,
application, and all such records with him even after he is removed or resigned from work
of this site. Guilty person or in disciplined person shall not be employed by the Contractor.
3.3 The CV/Resumes of the Contractors personnel shall be submitted to the Employer for
acceptance at least 7 days before the anticipated commencement of the O & M period. Any
change of personnel shall be promptly informed to the Employer within a day’s time. Normal
time duty hours for the contractors’ operation & maintenance personnel may be modified as
necessary and agreed by the Employer. A rotating shift schedule shall be established by the
Contractor and agreed by the Employer which Shall ensure that an adequate number of the
Contractor’s staff, fluent in Hindi as well as Gujarati is on duty at Plants 24 hours per day, 7 days
per Week, including all holidays. The contractor shall have to issue identity cards with photographs
to all the state employed for O & M.
3.4 The Contractor shall submit with his tender a diagram showing the structure of the
organization for his administration of the Contract. The structure shall include a Project
Team consisting of Project Manager. The Project Manager shall have authority and powers to
take decisions on the spot and/or incur expenditure(s) in the interest of the work whenever
required by the Employer.
3.5 All correspondence and communication between the Employer and the Contractor including
the Contractor's sub-contractors shall be directed through the Project Manager.
3.6 The sub-contractors proposed by the Contractor shall be subject to the approval of the
3.7 Contractor shall provide manpower as per qualification and experience
mentioned below:
S Designat ion Qualification Experience No. of Penalt
1 Plant in- B.E. / Diploma Min. 1-2 Years experience of 01 1000/D
charge / (Mech/Ele/Civil) related Work. a
Project or B.E.(Environment)or y
Manager Diploma in
BE/Diploma(Chemical)
2 Lab B.S.C, Chemistry Min. 1-2 Years experience of 01 600/Da
Technicia n Or Microbiology related Work. y
3 Mechanic I.T.I (instrumentation, Well Experienced Person 01 700/Da
/Shift In- Fitter Mechanic) or Having y
charge Skilled/experienced Person Relevant Knowledge of
Having 1 years of related instrumentation for O&M,
work experienced
4 Electricia n ITI (Elect. 1 year experience of relevant 02 500/Day
Trade)/ Wireman or electrical equipment for O &
Elect. Supervisory M
Certificate Holder Having
Experience of HT
Installation of 1 years
5 Plant ITI (Elect. 1 year experience of relevant 03 500/Day
Operator Trade)/ Wireman / ITI electrical equipment for O &
cum COPA or Elect. M
Supervis or Supervisory Certificate
Holder Having Experience
of HT Installation of
6 Helper 8th Standard knowledge of Gujarati; 03 500/Day
7 Security Stout body 1 year experience 03 500/Day
physique unskilled
3.8 Minimum manpower required in various shifts is as follows:
Sr.No. Designation Duty Nos Gen Ist IInd IIIrd
1 Project Manager General 1
2 Lab Chemist General 1
3 Mechenic/Shift in-charge General 1
4 Electrician Shift 2 1
5 Plant Operator cum Shift 3 1 1
6 Helper cum Sweeper Shift 3 1 1
7 Security Shift 3 1 1
3.9 Relaxation in qualification and number of staff shall not be allowed. The above staff
shall be distributed in three shifts. General shift shall be considered as 09:00 Hrs to
18:00 Hr various personnel shall attend the plant during general shift as tabulated above.
Preferable timing of shift shall be 06:00 Hrs to 14:00 Hrs, 14:00 Hrs to 22:00 Hrs and
22:00 Hrs to 06:00 Hrs. The arrangement of reliever for weekly off / all holidays etc. shall be
made by the Contractor over and above the required persons mentioned in 3.8 above except
general shift. As per agreement, the No. of staff in each shift should always remain present;
otherwise penalty towards absence of any staff shall be levied and recovered from the
contractor. If a man on the duty remains absent and there Shall not be any replacement in
his place the contractor Shall be penalised as per clause no. 3.7 at the rate of mentioned
against designation up to no limit. The arrangement of reliever for weekly
off/holiday/leave(Except general shift staff) etc. shall be made by the contractor. Absence on any
ground like weekly off or holiday shall not be considered (Except general shift staff). The
presence of staff in each shift should be marked in register to be maintained at office of
Engineer of the Client at Sewage Treatment Plant; which shall be considered as final. The
contractor’s staff must mark their presence in this register. The contractor may maintain a
separate register for his own purpose.
3.10 The staff of Contractor Shall always remain in contact with Employer and follow his instructions.
The Contractor shall have to issue identity cards with photograph to all the staff employed for
operation and maintenance; otherwise they Shall not be allowed to enter the plant premises.
3.11 The Contractor shall employ all the required staff (and in no case less than the number specified in
the tender which is mandatory) within 7 days of award of the Contract, otherwise full payment
Shall not be made. In such case, the commencement of the Contract Period and payment
thereof shall be reckoned only from the date of employment of full numbers of staff. If at
any stage it is felt necessary that additional manpower over and above the specified minimum
manpower is required for the proper operation of the treatment plant, contractor shall employ
necessary additional manpower at no extra cost within 7 days from the date of issue of notice by
engineer-in-charge.
3.12 The Contractor Shall comply with all safety rules and regulations and all inter-disciplinary
measures as followed by the Employer. The Employer Shall not be responsible for any accident /
injury to the staff or any person of the Contractor or loss or damage to any property. Further, the
Employer Shall not provide any insurance or free medical facility to the staff of Contractor.
Providing necessary security arrangement for safety of the plant and contractor’s personnel Shall
be the responsibility of contractor.
3.13 All Central / State Government / Semi-Government / Local Body’s rules and regulation pertaining
to this contract, all legal formalities pertaining to provident fund, factory act, all legal
formalities shall be followed and observed by the Contractor without any extra cost to the
Employer. Please note that failure in complying so, all liabilities arising as per laws Shall be to
the Contractor’s account.
3.14 No accommodation / guesthouse / transportation facility Shall be provided by the
Employer/ Employer to the Contractor. No staff or any person shall reside in the plant
premises and any such person found shall be driven out immediately.
3.15 Due to strike by the Contractor's employees, the operation and maintenance of plant must
not be affected and the property of KARJAN NAGARPALIKA should not be damaged. In such
case any dispute / discrepancy occurs, the decision of “ A u t h o r i t y ” Shall be final
and shall be binding to the contractor. Also if any expense shall be made by KARJAN
NAGARPALIKA, it shall be deducted from Contractor's bill/ SD.
3.16 The duration of contract shall be three years from the date of issue of completion
certificate / taking over certificate.
3.17 The contractor shall provide necessary chemicals for polyelectrolyte tank mixture, lubricating oil,
grease in their stone room. Stacking and day to day preparation of solution shall be
arranged by the contractor. Similarly, chlorine tonner / cylinder shall also be provided by the
contractor at the door – step of the chlorination plant. Disconnecting and removal of empty
tonners and reconnection of filled tonners shall be carried-out by the contractor. The minor
spares required for disconnection/reconnection i.e. clamp/’O’ rings/washers shall also be
arranged by the contractor.
3.18 Plant shall be handed over on “as is where is basis” to contractor on the award of
contract. Thus, the contractor has to take over the plants for said contract without any insistence
for any change in the plants. The all installations, equipments, civil structures and all other
components will be get in working conditions as per previous tender terms & conditions from
preceding contractor by nagarpalika before heanded over the new contractor.
3.19 The scope of work also includes regular cleaning of complete plant area including floor,
railing, door, windows, light fixtures and ceiling etc. similarly, minimum 5 mts. from the
construction boundary on the outside of the plant area shall also be cleaned and maintained by the
3.20 This work is inclusive of but not limited to operation, maintenance, housekeeping, cleaning,
removing sludge by its own carrier arrangement, painting, white colour washing,
preparing data, recording, correspondence work to the client and Government
Departments, etc. All this work should be done as per standard practices and by following labour,
factory, electrical, GPCB, and all other old and new law and order, Indian standards etc. as applied
of Local, State and Central Govt. of India.
3.21 Nothing is to be provided by the client excluding electricity and sewage flow. All the formalities to
all government authorities for factory, electrical, GPCB, etc. for having NOC, water consent,
Hazard waste concern, approval etc. shall be done by the contractor. However, necessary
legal fees to all government authorities shall be borne by the client.
3.22 Monitoring shall be done as per guidelines given by Engineer-in-charge. Contractor has to
maintain all the parameters of treated effluent within the stipulated limits or he Shall be penalised
for not maintaining the parameters given by GPCB and client. All expenditure incurred for the
same like, suite, fee, court fee, case fee, or the penalty as decided by “Authority” and penalty
charged by GPCB shall be deducted from his pending bills or Security Deposit.
The Contractor shall have to test the sewage samples of the influent and
effluent twice in a day through the laboratory provided at the plant; as per the schedule fixed by
the Engineer in charge. The same have to be verified and checked by the Client once a week by
taking parallel sample from the same point and at the same time and analysing the same at
the clients laboratory. Proper register/record shall have to be maintained by the contractor
and any modification
/rectification, on the basis of analytical results of samples if required, in performance of each
unit shall be carried out immediately. The daily analysis report along with steps for the
rectification / modification taken, if any, shall also be reported to the client with the daily
report. The weekly report shall also be submitted to the In-charge Engineer of the Client, with
remarks and the steps taken for modification, if any, taken during the period of report.
3.24 No equipment shall remain idle or unrepaired or damaged or unutilized for the period
exceeding 5 days. If any equipment is not repaired, rectified and or replaced within 5 days, the
contractor shall be penalised as per special condition of contract clause no 7.2 of the chapter
Operation & Maintenance aspect.
3.25 If a man on the duty remains absent and there Shall not be any replacement in his place, the
contractor Shall be penalised at the rate mentioned in the clause-3.7 above per man per day up
3.26 The quoted rate shall remain firm and valid for throughout O&M contract period.
3.27 The other terms and conditions described in this tender documents, wherever applicable,
shall remain unchanged.
3.28 However, during O&M period, the contractor has to supply all the spares, at his
cost during major-minor breakdown and also maintenance works.
3 . 29 MANURE (DRY SLUDGE)
Manure shall be the property of the KARJAN NAGARPALIKA. Contractor shall be responsible for
generating sludge from the plant as per the design of the plant and incoming quality of sewage.
Contractor is responsible for arranging sludge storage area near the centrifuge and
schedule the disposal in such a way that final product contains min. moisture content of 18-
20%. To maintain this moisture content drying of sludge shall be arranged in the plant by the
contractor. After attaining required moisture content Contractor need to load the sludge in the
trolley and supplied to the location as per Nagarpalika’s instructions. For this work, required
staffs must be provided at the site by the contractor. All rights to sell Manure (Dry Sludge) shall
be with the Nagarpalika.
4.0 MAINTENANCE
4.1 The maintenance service provided by the Contractor for the period specified in the
Contract shall ensure the continuous operation of the Plant and that the breakdown or
deterioration in performance, under normal operating conditions, of any items of Plant and
equipment and component parts thereof is kept to a minimum.
4.2 The Contractor shall carry out the Maintenance of the plant installations in accordance with
the requirements of the O & M Manual and also to the approved Maintenance Plan as mutually
4.3 The Contractor shall adhere to the manufacturers’ recommendations with respect to
equipment maintenance, the types and grades of lubricants to be used, frequency of
lubrication, adjustments to be made regularly and keep in safe custody recommended
spares, which may be required for smooth & trouble-free operation of the plant on day to
4.4 The Contractor to operate and maintain all equipment as recommended in the O & M
manual and maintain logs and records of the work carried out to keep them in good working
condition. The Employer shall approve the format of logs and records.
4.5 The Contractor shall prepare and implement an effective plant maintenance programme in
consultation with the Employer. It is absolutely the Contractor’s responsibilities to look after
all sorts of maintenance whether routine, preventive or break down or any other type of
maintenance. The Contractor Shall be responsible to carry out day to day as well as periodic
maintenance necessary to ensure smooth and efficient performance / running of all equipment.
4.6 The contractor shall along with the O & M Manual submit a write-up covering vision, mission,
plan for smooth & trouble-free operation & maintenance of the Plant. It shall include all
activities, their duration and planned deployment of manpower and resources.
4.7 Contractor shall set-up and maintain laboratory at plant site complete with all equipment,
testing instruments, glassware, weigh scale, chemicals, reagents, consumables and carry out
necessary service from time to time to conduct tests as stipulated in 5.3 below and any
other test required to check some of the basic parameters, not specifically mentioned.
5.0 DOCUMENTATION / REPORTS.
5.1 The Contractor Shall be furnished with two copies of O & M manuals (prepared by him)
approved by Employer. The Contractor Shall also be furnished with two copies of all
instructions as may be issued by the Employer. One copy of all such O & M manuals and
instructions issued to the Contractor shall be kept in his office at the site. The O & M manuals
or instruction shall be considered valid only if the Employer has signed it. The Contractor
Shall be responsible for keeping & updating record of documents including History Card for
equipment and maintaining every day logbook. The Contractor shall maintain and update
logbook and details of operational parameters like pumping hours, aerator operation hours,
Amperes, Flow meter reading, H.T. Voltage, Power Factor, energy meter reading, pressure and
other reading required are recorded in every shift at regular interval
e.g. hourly or as agreed mutually (by KARJAN NAGARPALIKA).
5.2 Printing of log sheets, registers and all necessary stationery required for maintaining records
of operations and maintenances has to be arranged by the Contractor at his cost, duly
approved by Employer. Format of log sheets, registers Shall be made available to the
contractor by the KARJAN NAGARPALI K A . Monthly statements for electricity consumed,
total hours of pump operation, total qty. of pumping in MLD, average power factor,
monthly consumable and repair maintenance during the month shall be furnished by the
5.3 The Contractor shall submit following reports to the Employer with every O & M bill
a) Sampling of raw & treated sewage analysis highlighting all important parameters as per
Chapter Operation & Maintenance Aspect - Clause No. 3 (v)
b) Qty. of sludge cake removed per day and gross (If Sludge generation is possible)
c) Elect-Mech-Instrument fault register.
d) Daily Chlorine consumption report.
h) Daily energy consumption report.
i) Plant input-output total MLD flow/day.
j) Attendance register.
6.0 TELEPHONE FACILITY
6.1 The Contractor shall have to arrange mobile telephone to two personnel of Key Staff.
Any cost to the repair to the telephones and the telephone bills Shall be borne by the
7.0 SAFETY, HEALTH AND ENVIRONMENT
7.1 The Contractor shall be responsible for safety on Site during the O & M of the Works by the
Contractor. Health of workers shall be protected against infectious and contagious diseases.
Medical check-up at every six months shall be done. Environmental protection shall also be
given priority so as to conserve the environment.
7.2 The Contractor’s duties with respect to Safety shall include the following:
(a) Utilize safety awareness procedures in every element of operation and
(b) Give emphasis to safety including:
i. Safe working and safety procedures as per rules and regulations of Department of Explosives,
factory inspector, electrical inspector regarding use of protective clothing, gloves, boots and
ii. Cleanliness of the Plant as a whole
iii. Awareness of hazardous conditions and accident reporting and necessary
iv. Safe practice in Treatment Plant
7.3 The Contractor shall be responsible for all safety measures and those procedures adopted shall
comply with the Indian regulations pertaining to such work and localsafety codes currently
in force. Where such codes do not adequately cover the Plant then the Contractor shall
ensure that proper safety procedures are followed. Those given below are minimum standards
and the works shall not be limited to these, if higher standards prevails. The Contractor Shall
comply with all safety rules and regulations and all interdisciplinary measures as followed by
the Employer. The Employer Shall not be responsible for any accident/ injury to the staff of
the Contractor. Further, the Employer Shall not provide any insurance or free medical facility to
the staff of Contractor.
7.4 If the work in the vicinity of electrical equipment has to be carried out after connection has
been made to the electricity supply the Contractor shall comply with any "Permit to Work"
system approved by the Employer.
7.5 Suitable scaffolds shall be provided for workmen for all work that cannot safely be done from
the ground, or from solid construction except such short period work as can be done safely
from ladders. When a ladder is used an extra man shall be engaged for holding the ladder
and if the ladder is used for carrying materials as well, suitable footholds and hand holes
shall be provided on the ladder.
7.6 All necessary safety equipment as considered adequate by the Employer shall be
available for use of persons employed on the Site and maintained in a condition suitable for
immediate use. The Contractor shall take adequate steps to ensure proper use of the equipment
by those concerned, in the following manner:
(a) Those engaged in handling any material which is injurious to eye shall be provided with
protective goggles.
(b) Those engaged in welding shall be provided with welder's protective eye-shields.
(c) Those involved in works in areas where there is a risk of drowning shall be provided with life
(d) Electrician, wiremen and helper shall be provided with shock-proof shoes.
7.7 Adequate provision shall be made for prompt first aid treatment of all injuries likely to be
sustained during the course of the work. When work is done near any place where there is risk
of drowning, all necessary equipment shall be provided and kept ready for use and all
necessary steps taken for the prompt rescue of any person in danger. Only after arranging
such equipment, tools/ tackles etc. at site work shall be started.
7.8 To ensure effective enforcement of the rules and regulations relating to safety
precautions, arrangements made by the Contractor shall be open to inspection by the Employer
or his Representative and the inspecting officers
7.9 Notwithstanding the provisions made above the Contractor is not exempted from the
operation of any Act or rule in force.
8.0 TOOLS AND TEST EQUIPMENT
8.1 A complete set of necessary tools and test equipment required for operation &
maintenance of the plant shall be available with the Contractor. This shall enable
erection, dismantling, repairing, replacing or testing to be carried out on any part of the Plant
whether of an electrical, mechanical or other nature, during the contract period. All tools and
test equipment shall be procured, kept at site in good condition and used properly by the
Contractor at his expense. The contractor shall prepare and implement an effective plant
maintenance program in consultation with the Employer. It is absolutely the contractor's
responsibilities to look after all sorts of maintenance whether routine, preventive or
break down or any other type of maintenance. The Contractor Shall be responsible to
carryout day to day as well as periodic maintenance necessary to ensure smooth and efficient
performance/ running of all equipment.
9.0 INSURANCE CERTIFICATES
9.1 Within 14 days of the acceptance of this tender the Contractor shall produce to the
Employer a certificate or certificates signed by the Contractor's insurers or their duly
authorized agents covering all the persons with accidental policy of sufficient amount as per
their grade (30 times monthly salary) with disability benefit provision for them stating that
insurance’s complying with the requirements of the contract have been effected. No such
certificate shall relieve the Contractor of his obligations under the Conditions of Contract to
produce to the Employer if required by him the insurance policies and the receipts for payment
10.0 ASSISTANCE FOR THE EMPLOYER'S STAFF
10.1 The Contractor shall provide all necessary assistance to the Employer and his staff in carrying
out their duties of checking setting out, inspecting and measuring the Works. The Contractor
shall provide staff, office attendants, labors and other help as may be needed from time to
time by the Employer.
10.2 The Contractor shall provide for the Employer and his staff such protective clothing, safety
helmets and rubber boots of suitable sizes, 440 volts series hand lamps and the like as may
reasonably be required by them. These articles shall remain the property of the Contractor.
11.0 FIRST AID BOX
11.1 The Contractor shall at his own cost provide and maintain at the Site of Works standard first
aid boxes at minimum Three locations as directed and approved by the Employer for the use
of his own as well as the Employer's staff on Site as stipulated by local regulations.
Contractor shall arrange to train all their staff in first aid treatment within 3 months.
12.0 NOTICE BOARDS / DISPLAY BOARDS
12.1 The Contractor shall provide a Notice Boards/Display Boards at appropriate locations detailing
precautions to be taken by operation and maintenance personnel in work in conformity with
Industries and Labour Regulations and Department of Explosives.
13.0 APPLICATION
13.1 These general conditions of the contract shall apply to the extent that they are not superseded
by provision in other parts of the contract
14.0 GENERAL ROUTINE MAINTENANCE
To operate and maintain the sewage treatment plant and equipment in accordance with the
aim and purpose of treatment. The plant and equipment covered under the above contract Shall
be promptly attended by the contractor including any "Trouble shooting" to ensure smooth and
trouble free operation. The contractor Shall be responsible for smooth and satisfactory
operation and maintenance of the Sewage Treatment Plant on the round the clock basis for
(Two) years period from the work order. A Technical expert of the contractor shall visit the
plant on every fortnight and Shall suggest if required, to improve the efficiency and
working of the plant. The visit must be recorded at Employer's document and outcome of
the visit/ minutes of meeting should be got signed by Employer's authorized representative
without which the visit shall not be considered. The employer shall check the operation of the
plant or designate an organization of his choice to carryout inspections. The employer or the
organization appointed by him shall check that the Contractor is performing the tasks for
which he is responsible with due diligence.
14.1(1) Regular cleaning of screens in all shifts depending upon load.
(2) Cleaning of screens by high pressure water jet (preferably between 1100 hrs to
1200 hrs) on daily basis.
(3) Cleaning of belt conveyor.
(4) Checking Alignment, tightening of fasteners, and lubrication of gear and other moving
parts of screens, conveyor belt, detritor, classifier units, PST/SST bridge & scrapper, scum
removal system, rail alignment etc.
(5) Checking and inflating tyres of all trolleys.
(6) Checking of all aerators for their submergence and making necessary
adjustments if found necessary, based on the DO analysis.
(7) Checking of all pumps, motors, gears etc. for its proper
(8) Checking of gas mixing system, gas holder unit for its proper
(9) Observing/monitoring sludge level in digester unit.
(10) Setting SV & Telescopic valve on sludge withdrawal line of PST/SST to suit with
the sludge consistency by sample analysis.
(11) Checking all the pipelines for preventing choking, water tightness etc.
(12) Monitoring BOD and DO level in treated effluent.
(13) Checking development of foam in Aeration tank and diminish it by water
(14) Safe disposal of screening, grit generated on daily basis at a site indicated by employer
within 10 km radius of the treatment plant (STP)
(15) Sludge generated on daily basis must be disposed at SITE RECOMMEND BY
NAGARPALIKA. Contractor has to supply daily generated sludge from the plant with
min.18-20% moisture at a site.
(15) Avoid strictly the accumulated sludge decomposing in the settling tanks and buoyed
to the surface. Septic condition should not arise in the tanks.
(16) Watering of plants and trees.
14.2 General routine maintenance schedule for various plant units shall be adopted from
O&M Manual. However, the general routine maintenance to be carried out by the
Contractor’s personnel Shall include but not limited to the following:
a) If it is observed that power consumption per MLD of sewage treated is increased, the
contractor has to trace out the fault and rectify the same to bring to the standard Value.
b) De-weeding and cleaning of the Transformer yard and other places.
c) Checking and refilling of silica-gel in the breather of the transformer and checking
temperature gauge, vent pipe, voltage tap changing switch
d) Regular watering in the earth-pits.
e) Check for any oil leak in the transformer and intimating and repairing of the same.
f) Opening of end cover & cleaning of dust by Air blowing of induction motors, PMCC
and other panel & PCC
g) Checking and replacement of bulbs, tubes, chokes, starters, switches, control etc.
throughout the plant and including outdoor lights and streetlight poles installation.
h) Replacement of LT panel fuse base, links, fuse, relay, contactor kit (main and
auxiliary) and timer.
i) Replacement of HT panel C/T or PT whenever required.
j) Check for any loose connection in electrical equipment and rectification of the same.
k) Monitoring power factor, take corrective steps and ensure optimum
power consumption.
l) Replacement of gland packing for the pump, sluice valves etc. whenever required.
m) Greasing of bearings and lubricating all moving parts as per the schedule
n) Tightening of all loose nut-bolts and other fasteners
o) Cleaning of sump tanks
p) Lubricating and test operation of the valves
q) General cleaning of all equipment and building
r) Replacement of pump rubber bush, gland packing, sleeve, bearing, oil seal, shaft, liquid ring
s) Replacement of motor bearings and terminal plate and rewinding of motor when
t) Replacement of non-return valve T bolt, hinge pin, flap/ gate.
15.0 PREVENTIVE MAINTENANCE CHECKS
15.1 The Contractor shall adopt a preventive maintenance check’s schedule as agreed
mutually between the Contractor and the Employer.
15.2 The following checks as a minimum to be performed daily by the
Contractor’s personnel
a) Whether there is a change in the sound of a running pump, abrupt changes in bearing
temperature and seal leakage?
b) The pump capacity, pressure, power consumption and vibration level to check if
outage is required to address deterioration of specified performance values.
c) Rise in temperature of bearings in motor, in moving parts and other units, etc. d)
Working of gauges, sensors and other flow measuring devices
e) Average power factor, kVARH, kWH consumed.
15.3 The following checks as a minimum to be performed weekly by the
Contractor’s personnel
a) Pipeline and valve leakage
b) Functioning of non-return valve
c) Tightness of all electrical connections of PMCC, APFC, PLC panel etc.
d) Tightness all cable connections
e) Temperature rise due to loose connections f)
Operation of valves and sluice gates.
g) Current and voltages in all electrical equipment
h) Average power factor, kVARH, kWH consumed.
15.4 The following checks as a minimum to be performed monthly by the Contractor’s personnel
a) Battery voltage, battery charger, topping of distilled water, tightness of
terminations etc.
b) Gland packing
c) Wear and tear of moving parts
d) Adoption of Electrical energy conservation methods and energy consumption
e) Electrical contacts
g) Meggering of electrical equipment
i) Watering of earthing pits.
15.5 The following checks as a minimum to be performed quarterly by the Contractor’s personnel
a) Relay testing and calibration if possible of meters, gauges, instruments
) Speed of motors
c) Level gauges and flow meters signals
d) Cleaning, checking/tightening of L.T. Circuit/Panel e)
Tightening of PMCC components
f) Auxiliary DB, Capacitor bank
g) Battery and Battery charger
112.8The following checks as a minimum to be performed bi-annually by the Contractor’s
a) Free movement of stuffing box glands, gland bolts to be cleaned & lubricated and packing to
be inspected to determine whether it requires replacement.
b) Pump and motor alignment should be checked and corrected if necessary.
c) Grease lubricated bearings should be checked to see that the
contain the correct amount of grease and that it is still of suitable consistency.
15.7 The following checks as a minimum to be performed annually by the Contractor’s
a) Vibration should be reviewed. If the pump is tending towards unacceptable
vibration levels:
i. The bearing should be removed, cleaned and examined for flaws and wear. ii.
The bearing housing should be carefully cleaned.
iii. Rolling element bearings should be examined for scratches and wear.
iv. Immediately after cleaning, rolling element bearings that are considered
acceptable for reinstallation should be coated with grease. If the bearings are damaged it shall
be replaced with new bearing of the correct size and type as per O&M manual.
b) Shaft sleeve and shaft should be examined for wear.
c) When coupling halves are disconnected for an alignment check, the vertical shaft
movement of a pump with sleeve (journal) bearing should be checked at both ends with
packing or seals removed. Any movement exceeding the original design clearance should
be investigated to determine the cause. Endplay allowed by bearings should also be checked. If
it exceeds that recommended by the manufacturer, the cause should be determined and
d) Stuffing boxes should be repacked and the pump & motor should be realigned and reconnected
e) Overhauling requirement of all equipment
f) Improvement required if any in operation of plant
g) Testing of all instruments
h) Transformer cleaning, checking silica gel, oil checking filtering/replacing.
15.8 This work is also inclusive of painting of plants as per following schedule and paint shall be of
the same specification as described in respective unit/ mechanism as per original specification of
the executed work.
Sr. Item Duration
1. Civil work Once in a contract
2. Doors and windows ---do----
3. Shutters, grills, collapsible gate etc ---do----
4. All H.T./ L.T. panels ---do----
5. All process equipment with its ---do---
accessories and GI railings etc.
6. Street / flood light pole ---do----
7. Pump sets, valves, C.I. fittings, ---do----
sluice gate, etc.
Note: However, if any unit mechanism Shall found to have some defect in paint work at
anytime, the Contractor has to repaint the same under the instruction of Employer.
16.0 MINOR REPAIR GENERALLY ENCOUNTERED IN THE PLANT
16.1 The minor repairs which have been most often encountered are as given below: Electrical
a) For H.T. Installations
i) Replacement of jumpers
ii) Replacement of insulator (Porcelain)
iii) Replacement of Air-Break Switch b)
For Both H.T. & L.T. Installations
i) Replacement of no-volt coil for VCB
ii) Replacement of Cable lugs including terminations
iii) Replacement of burnt out HRC fuses
iv) Replacement of moving and fixed contacts or contractors
v) Repairs to isolators and switch fuse units and replacement of it and fuse base units.
Pump sets Replacement of coupling bolt and nuts including rubber bushes b)
Replacement of worn out impeller nut
c) Replacement of spindle nut in the sluice valve. d)
Replacement of terminal plate in the motor
e) Replacement of faulty/dead spares in the battery charger and battery control panel.
f) Replacement of gland packing, graphite packing from the pump sets.
17.0 ADDITIONAL SCOPE OF WORK
17.1 For other incidental additional work, if any, the Contractor on authorisation in writing from the
Employer shall execute which is not specifically mentioned in the scope at present.
18.0 ELECTRIC POWER AND WATER
18.1 KARJAN Nagarpalika shall directly pay all the power bills but the Contractor Shall be required to
furnish Electricity Consumption in the Schedules provided. If the average power factor in the electric
supply company BILL IS LESS THAN 0.9, the PENALTY
/CHARGE FOR THE SAME SHALL BE RECOVERED FROM CONTRACTOR/THEIR BILL.
18.2 Contractor Shall have to make his own arrangements for supply of clear potable water in the
plant. Contractor shall bear cost towards distribution of water within premises.
19.0 PLANT INSPECTION AND VISITS
19.1 The Employer shall check the operation of the plant or designate an organisation of his choice to
carry out inspections. The Employer or the organisation appointed by him shall check that the
Contractor is performing the tasks for which he is responsible with due diligence. The Contractor shall
at his cost provide all the assistance required by the Employer to complete these inspections.
19.2 Before any inspection, the Employer shall give prior notice of three days to the Contractor, indicating
the name(s) of the person(s) empowered to carry out such inspection in the name of the Employer. In
case of surprise visit, vigilance or other checks, such notice shall not be given.
19.3 At the end of each quarter period, or at the initiative of the Employer, a JOINT VISIT shall be
organised so that both parties can check the condition of the installation at the plant.
19.4 A report shall be drawn up to record the suggestions and opinions of both parties. The Employer
reserves the right to call in equipment manufacturers or specialised technicians for these visits.
19.5 These visits shall provide an opportunity for examining maintenance programs and operating
procedures and improvements requiring therein..
19.6 In addition to the above, the Employer reserves the right to arrange the visits of. VIP’s
dignitaries and other persons of Social or Political repute, as and when necessary, at the
Treatment Plant. The Contractor shall offer full cooperation to the Employer on the occasions of
20.0 MEASUREMENT AND ANALYSIS
20.1 The Employer has the right to perform any analysis or inspection he deems necessary.
20.2 The Contractor shall be responsible for the security and protection of flow meters at the
designed point. If there is any malfunctioning of the meters, action Shall be initiated
21.0 SEWAGE TREATMENT PLANT PROCESS PERFORMNACE INDICATOR
Description Influent Effluent Actual Design Deviation
Efficiency(A) Efficiency(B) (A-B)
MLVSS/MLSS 75 %
*Actual efficiency must be at least 85 % of design efficiency.
Lab Report Format : once in a day (During Peak Flow) Time:
Type: Grab/Composite
No. Inlet Chamber Treated Sewage Before Discharge
For SBR Tank : Twice in a week (During Peak Flow):
Sr. No. Parameter Value
1 Dissolved Oxygen
Affidavit / Confirmation Regarding
Non Banned – Non Debarred – Non Black Listed – No Litigation & Other Details
(On Non-Judicial Stamp Paper Of Rs 300/- Duly Attested By First Class Magistrate/
l/we, age year residing at
in capacity of M/s
hereby solemnly affirm that
1. All general instructions, general terms and conditions, as well as special terms &
conditions laid down on all the pages of the tender form, have been read carefully
and understood properly by me which are completely acceptable to me and I agree to
abide by the same.
2. I/We have submitted following certificates /document for T.E as required as per
general terms& conditions as well as special terms & conditions of the tender.
Sr. No Name of the Document
3. All the certificates /permissions /Document / Permits /Affidavits are valid and
current as on date and have not been withdrawn/ cancelled by the issuing authority.
4. It is clearly and distinctly understood by me that the tender is liable to be rejected if
on scrutiny at any time, any of the required certificates / permissions /Document/
permits/ affidavits is /are found to be invalid/wrong
/incorrect/ misleading /fabricated/expired or having any defect.
5. I/We further undertake to produce on demand the original
certificate/permission/Document/permits for verification at any stage during the
processing of the tender as well as at any time asked to produce.
6. I/We also understand that failure to produce the Documents in “prescribed
Performa” (wherever applicable) as well as failure to give requisite information in
the prescribed Performa may result in to rejection of the tender.
7. My /our firm has not been banned/ debarred/ black listed at least for three years
(excluding the current financial year) by any government department / state
government/ government of India / Board / corporation/ municipal corporation /
metro city / government financial institution within India in context to purchase
procedure or work through tender.
8. I/We conform that I/We have meticulously filled in, checked and verified the
enclosed Documents/certificates/ permission/permits/ affidavits /information etc.
from every aspect and the same are enclosed on order(i.e. in chronology) in which
they are supposed to be enclosed. Page numbers are given each submitted
Document. Important information in each Document is “highlighted” with the help of
“marker pen” as required.
9. The above certificates/documents are enclosed separately and not on the Performa
printed from tender document.
10. l /We say and submit that the permanent account Number (PAN) given by the
income tax Department is
Which is issued on the name of [Kindly mention
here either name of the proprietor (in case of proprietor Firm) or name of the
tendering firm, Whichever is applicable].
11. l / We understand that giving Wrong information on oath amounts to forgery and
perjury, and l/We am/are aware of the consequences thereof, in case any
information provided by us are found to be false or incorrect, you have right to reject
our bid at any stage including forfeiture of our EMD/PBG/cancel the award of
contract, in this event, this office reserves the right to take legal action on me/us.
12. I/We have physically signed & stamped all the above Documents along with copy of
tender Documents (page no. to ).
13. I/We hereby confirm that all our quoted items meet or exceed the requirement
and are absolutely compliment with specification mentioned in the bid Document .
14. My /our company has not filed any writ petition, court matter and there is no court
matter filed by state government and its Board corporation, is pending against our
15. I/We hereby commit that we have paid all outstanding amounts of dues/taxes/ cess
/charges/fees with interest and penalty.
16. In case of breach of any tender terms and conditions or deviation from bid
specification other than already specified as mentioned above, the decision of tender
committee for disqualification will be accepted by us.
Whatever stated above is true and correct to the best of my knowledge and belief.
Date: Stamp & Sign of the Tenderer
Place: (signature and seal of the notary)
(Upload Scan Copy And To Be Submitted Physically in Original)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Documents.pdf
Karjan Price shedule-B.pdf
Corrigendum-01.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .