Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
18 May 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TELECOM
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. Meaning of Similar nature of work : Any work related to excavation, trenching/HDD, laying, splicing/jointing of underground OFC cable or OFC & Quad cable. or Any work related to comprehensive AMC/ARC of OFC cable for at least one year period with satisfactory performance.
39 conditions · 34 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. Meaning of Similar nature of work : Any work related to excavation, trenching/HDD, laying, splicing/jointing of underground OFC cable or OFC & Quad cable. or Any work related to comprehensive AMC/ARC of OFC cable for at least one year period with satisfactory performance.
Provision of Sectional OFC maintenance Work in Various Sections over Jodhpur Division for Period of One Year
SNT-JU-03-2026-27
SNT-JU-03-2026-27
Open
Works - General
12 Months
Jodhpur, Rajasthan
₹0
₹2.8 L
18 May 2026
23 Apr 2026
4 May 2026
17 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,37,60,021.22 | ||
| — | 174.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in MTD-DNA- FL,MKN-PBC sections of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 174 KMs= 174 KMs). Inspection by Consignee. | — | — | — | 14,75,196.36 | |
| — | 152.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in DNA-RTGH section of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 152 KMs = 152 KMs). Inspection by Consignee. | — | — | — | 12,88,677.28 | |
| — | 243.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in MTD-JU-PLCJ, PPR-BARA sections of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 243 KMs = 243 KMs). Inspection by Consignee. | — | — | — | 20,60,188.02 | |
| — | 243.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in PLCJ-JSM, PLCJ-PLCC sections of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 243 KMs= 243 KMs ) Inspection by Consignee. | — | — | — | 20,60,188.02 | |
| — | 188.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in MTD-BKN, MTD-MEC sections of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 188 KMs = 188 KMs). Inspection by Consignee. | — | — | — | 15,93,890.32 | |
| — | 185.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in JU-MJ, LUNI- SMR-BLT sections of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 185 KMs = 185 KMs ). Inspection by Consignee. | — | — | — | 15,68,455.9 | |
| — | 215.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in BLT-BME-MBF section of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 215 KMs= 215 KMs . Inspection by Consignee. | — | — | — | 18,22,800.1 | |
| — | 223.00 | — | — | ||
| Sectional Maintenance Contract of OFC cable (2/4/6/12/24/48 fibres) in SMR-BLDI section of Jodhpur division with deployment of One Maintenance Teams (as per Tender Document) in section for 01 Year (12 Months). (This includes Maintenance of all types of Fibre cables i.e. 2/4/6/12/24/48 fibres of both UP & DN side. Note- Qty for one Year for 1 Team- 1 X 223 KMs =223 KMs ). Inspection by Consignee. | — | — | — | 18,90,625.22 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Correction slip 2
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril-
ATTACHMENT
SNT-JU-03-2026-27StandardTenderDocumentupdatedasperACS-11_2.pdf
ATTACHMENT
Telecom_Circular07-20242.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_8ACS-8.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_9ACS-9.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_10ACS.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
AdvancecorrectionsliptoGCC2022.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_6ACS-6.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_11ACS.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_4ACS-4.pdf
ATTACHMENT
AdvanceCorrectionSlipNo_5ACS-5.pdf
ATTACHMENT
2022_12_13RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril2022ACSNo_2.pdf
ATTACHMENT
2023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-311.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .