Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 CrAccepted-AOC SCF 126 OPP SUKHRAJ CINEMA ROSE GARDEN COMPLEX G T ROAD BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | ₹11.0 Cr | L1 | Accepted-AOC Awarded being L1 bidder |
| 2 | L2₹12.5 CrRejected-Finance | ₹12.5 Cr | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹13.8 CrRejected-Finance | ₹13.8 Cr | L3 | Rejected-Finance Rejected being L3 |
| 4 | L4₹15.0 CrRejected-Finance | ₹15.0 Cr | L4 | Rejected-Finance Rejected being L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per recommendations of TEC |
Tender Value
₹11.5 Cr
EMD Value
₹9.0 L
Closing Date
17 Jun 2024, 12:00 pmClosed
Chief Engineer Project Swastik
O/O Chief Engineer Project Swastik C/o 99 APO Pin 931717 BRO Burtuk Sikkim
DESIGN AND CONSTRUCTION OF 85.00 M SPAN MAJOR PMT STEEL SUPER STRUCTURE BRIDGE THROUGH TYPE ON OPEN FOUNDATION OVER QUIKHOLA AT KM 34.50 INCLUDING SSI ON ROAD RISHI-RONGLI-KUPUP UNDER 130 RCC/764 BRTF /PROJECT SWASTIK IN THE STATE OF SIKKIM JOB NO 30
2024_BRO_654952_1
80582
Open Tender
Civil Works
911 days
AT KM 34.50 ON ROAD RISHI-RONGLI-KUPUP UNDER 130 R
As per tender documents
8 documents required · 8 mandatory
₹0
₹9.0 L
Yes
O/O Chief Engineer Project Swastik
20 Sept 2024
20 May 2024
18 Jun 2024
20 May 2024
17 Jun 2024
25 May 2024
20 May 2024 - 25 May 2024
25 May 2024
Amount
DESIGN AND CONSTRUCTION OF 85.00 M SPAN MAJOR PMT BRIDGE STEEL SUPER STRUCTURE (THROUGH TYPE) ON OPEN FOUNDATION OVER QUIKHOLA AT KM 34.50 INCLUDING SSI ON ROAD RISHI-RONGLI-KUPUP UNDER 130 RCC/764 BRTF /PROJECT SWASTIK IN THE STATE OF SIKKIM JOB NO 309/293: TENDER NO NO CE (P) SWTK/10/2024-25
DESIGN AND CONSTRUCTION OF 85.00 M SPAN MAJOR PMT BRIDGE STEEL SUPER STRUCTURE (THROUGH TYPE) ON OPEN FOUNDATION OVER QUIKHOLA AT KM 34.50 INCLUDING SSI ON ROAD RISHI-RONGLI-KUPUP UNDER 130 RCC as per NIT drawing and based on hydraulic data, sub soil data, ground data, special conditions, particular specifications of the tender documents including proof checking of drawings as directed by the Department, Plate Load Test of foundation, Load Testing of superstructure as specified, all preparatory works, Foundations, Abutments, Return Walls, POT & POT cum PTFE bearings, including design, launching/erection of staging works as required, Decking, Wearing coat having non skid surface, strip seal expansion joints,Steel railings, Kerbs, RCC Crash Barrier, Guard Posts, Drainage arrangement over Carriage way and Footpath,Service arrangement for utilities, Painting with non-corrosive paint to all exposed steel works, kerbs, Protective works, temporary river training works, diversions and all other itmes of works required and necessary for complete construction of bridge including curing and RCC approach slab of 3.50 M on both sides and as per direction of Engineer-In-Charge
SUN SHINE OVERSEAS PVT.LTD. (BID ID -3029464)
AMARDEEP CONSTRUCTIONS (BID ID -3016072)
Ms Poddar Infratech Private Limited (BID ID -3023155)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid