| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC | ₹1.1 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.6 Cr+₹48.0 L (43.5%)Rejected-Finance 5C OXFORD BUSINESS CENTER SREEKANDATH ROAD RAVIPURAM ERNAKULAM KERALA 682016 | ERNAKULAM | KERALA | 682016 | ₹1.6 Cr+₹48.0 L (43.5%) | 2 | Rejected-Finance Work awarded to L1 bidder |
| 3 | 3₹1.8 Cr+₹67.6 L (61.3%)Rejected-Finance 201 202 LALA 1 LANDMARK MG ROAD HYDERABAD HYDERABAD | ₹1.8 Cr+₹67.6 L (61.3%) | 3 | Rejected-Finance Work awarded to L1 bidder |
| 4 | 4₹1.9 Cr+₹78.9 L (71.5%)Rejected-Finance 2ND ROSHAN TOWER S B SHOP BISTUPUR AREA EAST SINGHBHUM JHARKHAND | BISTUPUR | EAST SINGHBHUM | JHARKHAND | 831001 | ₹1.9 Cr+₹78.9 L (71.5%) | 4 | Rejected-Finance Work awarded to L1 bidder |
| 5 | Rejected-Technical 203 GURU CHAMBERS 2501 8 BEADONPURA KAROL BAGH DELHI DELHI 110005 | CENTRAL DELHI | DELHI | 110005 | - | - | Rejected-Technical The OEM/MAF undertaking for the Bollard, Boom Barrier and UPS System is not as per CIAL format. |
Tender Value
₹1 Cr
EMD Value
₹5 L
Closing Date
15 Jul 2024, 3:00 pmClosed
Managing Director
Cochin International Airport Ltd. Kochi Airport P.O. Ernakulam - 683111 Kerala India
SITC of Bollards and Boom Barriers at Cochin International Airport Limited.
2024_CIAL_675759_1
CIAL/COMMN/VACS/01/2024
Open Tender
Miscellaneous Works
Item Rate
120 days
CIAL
As per Tender
7 documents required · 7 mandatory
₹2,500
₹5 L
27 Nov 2024
13 Jun 2024
16 Jul 2024
13 Jun 2024
15 Jul 2024
27 Jun 2024
13 Jun 2024 - 20 Jun 2024
Supply of Bollards (4 nos per gate operating as a set) as per the technical specification including all accessories
Installation, Testing & Commissioning of Bollards (4 nos per gate operating as a set) as per the technical specification including all accessories
Supply of Boom Barriers (2 no per gates, right handed and left handed, operating as a set) as per the technical specification including all accessories
Installation, Testing & Commissioning of Boom Barriers ( 2 no per gates, right handed and left handed, operating as a set) as per the technical specification including all accessories
Supply of 6 KVA or higher UPS System as per the technical specification including Isolation Transformer, Network Interface Card, Battery Stand and all accessories required for the completion of the work.
Installation, Testing & Commissioning of UPS System as per the technical specification with including all accessories
Supply of Battery Bank for UPS System as per the technical specification including all accessories
Installation, Testing & Commissioning of Battery Bank for UPS System as per the technical specification including all accessories required for the completion of the work
Miscellaneous Items
Buyback of Bollard and Boom Barrier (will be deducted from the Total Amount)
Buyback of Bollard and Boom Barrier
Manpower and Maintenance Cost for 7 Years (5 years Warranty Period + 2 year AMC Period).
1st Year Manpower Cost
2nd Year Manpower Cost
3rd Year Manpower Cost
4th Year Manpower Cost
5th Year Manpower Cost
6th Year Manpower Cost
7th Year Manpower Cost
Maintenance Cost after 1st Year Warranty
Maintenance Cost after 2nd Year Warranty
Maintenance Cost after 3rd Year Warranty
Maintenance Cost after 4th Year Warranty
Maintenance Cost after 5th Year Warranty
Maintenance Cost after 6th Year AMC
Maintenance Cost after 7th Year AMC
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .