Loading…
Loading…
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
23 Oct 2026, 2:00 pm
SE, PWD
O/o The S.E., PWD, Jorhat Building Circle, Jorhat
Construction of Skill Development Centre for Tea Garden people Erabasti (Adhalkatia Revenue Village)
2026_PWBNH_54241_1
SE(B)/JHT/C/S/S-05/2026-27/541
Open Tender
Civil Works - Building
Item Rate
180 days
Titabor
Please refer Tender documents.
4 documents required · 4 mandatory
₹700
₹70,000
Yes
O/o The S.E., PWD, Jorhat Building Circle, Jorhat
1 Oct 2026
1 Oct 2026
23 Oct 2026
1 Oct 2026
23 Oct 2026
1 Oct 2026
8 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Earth work in excavation by mechanical means (Hydraulic excavator) /
manual means in foundation trenches or drains (not exceeding 1.5 m in
width or 10 sqm on plan), including dressing of sides and ramming of
bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 60.81 | cum | 305.01 | ₹18,547.51 |
| 2 | filling available excavated earth (excluding rock)in trenches,plinth sides of foundation etc in layers not exceeding 20 cm in depth ,consolidating each deposited layer by ramming and watering ,lead upto 50 m and lift upto 1.5 m | 51.13 | cum | 270.03 | ₹13,806.38 |
| 3 | brick soling | 134.71 | sqm | 641.46 | ₹86,410.67 |
| 4 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from
natural sources : 6 graded stone aggregate 20 mm
nominal size derived from natural sources) | 2.86 | cum | 7,265.95 | ₹20,795.16 |
| 5 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from natural sources) | 5.68 | sqm | 394.32 | ₹2,239.76 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,997.62 | kg | 95.32 | ₹1,90,422.82 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 6,029.93 | kg | 95.32 | ₹5,74,802.14 |
| 8 | Centering and shuttering including strutting, propping etc. and removal
of form for
Foundations, footings, bases of columns, etc. for mass
concrete | 38.25 | sqm | 327.44 | ₹12,524.7 |
| 9 | Centering and shuttering including strutting, propping etc. and removal
of form for
Columns, Pillars, Piers, Abutments, Posts and Struts | 56.42 | sqm | 855.16 | ₹48,243.8 |
| 10 | Centering and shuttering including strutting, propping etc. and removal
of form for
Lintels, beams, plinth beams, girders, bressumers and
cantilevers | 64.59 | sqm | 646.86 | ₹41,781.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
SBD.pdf
Tender Documents • 4.17 MB
BOQ_85161.xls
BOQ • 10.77 MB
FOB.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .