Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.2 Cr
EMD Value
₹10 L
Closing Date
27 Oct 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer/W.H.C.1/P.W.(R)D.
Office of the Superintending Engineer, Western Highway Circle No.-I, Purta Bhavan 1st Floor, Burdwan, Purba Bardhaman. 713103.
Kedar Roy Road from 0.000 kmp to 8.300 km. Strengthening (5.5 m C. way) Work under Birbhum Highway Division No. I, P.W.(Roads) Directorate in the District of Birbhum during the year 2026-27.
2026_WBPWD_5076722_1
WBPW(R)D/NIT- 04 of SE/WHC-I/2026-2027
Open Tender
CIVIL WORKS
Percentage
240 days
Burdwan
Please refer Tender documents.
4 documents required · 4 mandatory
₹10 L
Yes
Off of the S.E./W.H.C.1/P.W.(R)D.
30 Sept 2026
30 Sept 2026
29 Oct 2026
30 Sept 2026
27 Oct 2026
7 Oct 2026
7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PAVEMENT WORKS : | |||||
| 1.01 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301).
(Rate is including 1% cess). | 3,765.18 | cum | 85.55 | ₹3,22,111.15 |
| 1.02 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (Land arranged/owned by the agency) with all lifts and leads (Up to 5Km) , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
(Rate is including 1% cess). | 9,412.96 | cum | 220.72 | ₹20,77,628.53 |
| 1.03 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (Earth is available from Govt. Land) with all lifts and leads (Upto 5km), transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
(Rate is including 1% cess). | 9,412.96 | cum | 168.17 | ₹15,82,977.48 |
| 1.04 | Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Mechanical Means
Bituminous course
(Rate is including 1% cess). | 671.4 | cum | 312.86 | ₹2,10,054.2 |
| 1.05 | Cold Milling
Cold Milling of Bituminous Pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under lying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of Engineer-in-Charge.
For depth upto 100mm
(Rate is including 1% cess). | 36,689.4 | sqm | 42.02 | ₹15,41,688.59 |
| 1.06 | Providing and laying bituminous macadam with 100-120 TPH hot mix plant using crushed aggregates of specified grading premixed with approved bituminous binder @ 3.4% (min) for Grading -2 by weight of total mix , transported to site, laid over a previously prepared base with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (Reference to MORT&H's specification clause 504).
for Grading II (19 mm nominal maximum aggregate size) Layer Thickness 50-75mm
Using Bulk Bitumen VG-40 Grade
(Rate is including 1% cess). | 493.68 | cum | 10,791.43 | ₹53,27,513.16 |
| 1.07 | Dense Graded Bituminous Macadam :
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder of approved grade @4.5% (min) for Grading -2 by weight of total mix and filler(Cement /hydrated lime / Rock dust ) as per table 500-10 and mix design done as per table 500- 11and job mix formula as per clause 505.3.3 transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory tandem roller and with pneumatic tyre roller of 12 to 15 tonne weight with a pressure at least 0.56 MPa as directed by E-I-C, and to achieve the desired compaction as per MORT&H specification clause No. 505.3.5 complete in all respects (Reference to MORT&H's specification clause 505).
For Grading 2. (26.5 mm nominal maximum aggregate size )
Compacted Thickness 50-75 mm
Using Batch Type HMP of minimum capacity 100-120 TPH.
Using Bulk Bitumen VG-40 Grade
(Rate is including 1% cess). | 2,672.94 | cum | 14,339.04 | ₹3,83,27,393.58 |
| 1.08 | Bituminous Concrete :
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of approved grade@ 5.4% (min) for Gr.-2 , as per table 500-17, and mix design done as per table 500-10 and job mix formula as per cl. 505.3.3 and filler(Cement /hydrated lime / Rock dust ), transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory tandem roller and with pneumatic tyre roller of 12 to 15 tonne weight with a pressure at least 0.56 MPa as directed by E-I-C to achieve the desired compaction as per clause no 507.3.5 complete in all respects ref. to MORTH specification clause No.507.
For Grading 2
(13.2 mm nominal maximum aggregate size),
Compacted thickness: 30 mm.
Using Batch Type HMP of minimum capacity 100-120 TPH.
Using Bulk Bitumen VG-40 Grade
(Rate is including 1% cess). | 1,129.9 | cum | 16,448.72 | ₹1,85,85,408.73 |
| 1.09 | Mastic Asphalt
Providing and laying 25 mm thick mastic asphalt wearing course with approved grade bitumen meeting the requirements given in table 500 39, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine-grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 100°C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516 (Reference to MORT&H's specification clause 516 along with IRC:107).
Compacted thickness: 25 mm.
Using Industrial grade bitumen (Packed - 85/25 grade) and bitumen (Bulk VG-40 grade) .
(Rate is including 1% cess). | 9,424.8 | sqm | 914 | ₹86,14,267.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
Tendernotice_2.pdf
PDF • 0.55 MB
BOQ_5171044.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .