Loading…
Loading…
Tender Value
₹14.3 L
EMD Value
₹28,700
Closing Date
31 Aug 2026, 4:00 pm2d left
EXECUTIVE ENGINEER RNB DIVISION AWANTIPORA
EXECUTIVE ENGINEER RNB DIVISION AWANTIPORA
FORSS2627100236-Construction of Watch tower at Gulshanpora, Tral, Range Awantipora..
2026_PWDJK_321654_1
99/EEA/RNB of 2026-27/5071-81 dated 20-08-2026
Open Tender
Civil Works
Percentage
60 days
AWANTIPORA
AS PER NIT
5 documents required · 5 mandatory
₹600
JK Bank Account Bearing No 0470010200000099
₹28,700
20 Aug 2026
20 Aug 2026
1 Sept 2026
20 Aug 2026
31 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:Rate for a lead upto meter from
cutting edge All kinds of soil : | - | Cum | 1 | - |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | cum | 1 | ₹1 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | - | - |
| 5 | Reinforcement for RCC work incld straightning, cutting, bending, placing in position & binding all completeThermo-Mechanically Treated bars of grade Fe-500D or more | 1 | Kgs | 1 | ₹1 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 1 | sqm | - | - |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 1 | cum | 1 | ₹1 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | - | Kgs | 1 | - |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 1 | Kgs | 1 | ₹1 |
| 10 | Structural steel work in single section, fixed with or without connecting
plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | Kgs | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1075041.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].