| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr Quoted ₹18.9 Cr | L1 | Accepted-AOC AWARD LETTER AGAINST FDR SUBMITTED BY THE CONTRACTOR |
| 2 | L2₹1.9 Cr−₹17.0 Cr (89.8%)Rejected-Finance | ₹1.9 Cr−₹17.0 Cr (89.8%) | L2 | Rejected-Finance HIGHEST AMOUNT |
| 3 | L3₹2.3 Cr−₹16.6 Cr (87.8%)Rejected-Finance | ₹2.3 Cr−₹16.6 Cr (87.8%) | L3 | Rejected-Finance HIGHEST AMOUNT |
| 4 | L4₹2.4 Cr−₹16.5 Cr (87.1%)Rejected-Finance | ₹2.4 Cr−₹16.5 Cr (87.1%) | L4 | Rejected-Finance HIGHEST AMOUNT |
| 5 | Rejected-Technical | - | - | Rejected-Technical no similar work ,work done as sub contractor only |
Tender Value
₹2.7 Cr
EMD Value
₹5.8 L
Closing Date
21 Apr 2026, 11:00 amClosed
CHIEF ENGINEER DHARMSHALA HPPWD DHARAMSHALA
CHIEF ENGINEER DHARMSHALA HPPWD DHARAMSHALA
CONSTRUCTION OF GOVT SCHOOL CHANOUR TO KAHANDA BASTI KM 0.0 T0 2.500
2026_CEHP_147205_3
TENDER NOTICE NO PW(KZ)CELL/NIT/PMGSY -IV (BATCH -1 ) DISTT KANGRA 2025-26 -2437-80 DATED 31.3.2026
Open Tender
CIVIL
Percentage
365 days
DEHRA GOPIPUR
Please refer Tender documents.
13 documents required · 13 mandatory
₹5,000
EXECUITVE ENGINEER DEHRA DIVISION HPPWD DEHRA
₹5.8 L
7 Jul 2026
6 Apr 2026
21 Apr 2026
6 Apr 2026
21 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load and animal transport and mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. The land for dumping sites shall be arranged by the Contractor himself and nothing extra shall be paid on this account. Any loss to the public, private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The removal of slips during the construction period shall be responsibility of the contractor. The rate is including octroi, royality, Malkana, toll tax or any other taxes imposed by the Government but excluding GST. The rates for excavation item worked out after deduction of recovery of useful stone as per DPR | - | Per Cubic metre | - | - |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement including setting out, true to the lines, grades, width and side slopes in accordance with drawing including spreading the embankment material with motor grader in successive layer of in layer 200mm (two hundred millimetre) uniforms thickness and compacting with vibratory roller 8-10 ( eight to ten) tonne static weight to meet requirement of Tables 300.1 and 300.2 as per MORD Technical Specification section 300 & 1600 and as per direction of Engineer-in-charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per cubic metre | - | - |
| 3 | Loosening of the ground upto a level of 300 mm (three hundred millimetre) below the subgrade level, watered, graded with motor grader and compacted in layers to meet requirement of Tables 300.1 and 300.2 with three wheel 80-100 (eighty to one hundred) Kn static roller for subgrade construction as per MORD Technical Specification section 300. as per direction of Engieer-in-Charge including carriage of material within all leads, lifts and other incidential. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic metre | - | - |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with in all lifts and leads, transporting to site, spreading, grading by mechanical means to required slope and compacted with three wheel 80-100 (eighty - hundred) kN static roller to meet requirement of Table 300.2 complete as per MORD technical Specification section 400 and as per direction of Engineer-in-charge including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per cubic metre | - | - |
| 5 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drain and Parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiseling /wedging out rocks (Where blasting is prohibited) as per drawings and M.O.R.D. technical specification section 300 and 1600 and as per direction of the Engineer- In – Charge including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and lift including dressing of sides, bottom and back filling in trenches with excavated suitable approved material to the original surface in layer not executing 150 mm (one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water ) upto any depth any quantam of water including cleaning of slush which may arise out during dewatering complete as per direction of Engineer-in-Charge. Including carriage of materials within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic metre | - | - |
| 6 | Back filling with granular material behind abutments, wing walls, return walls and retaining walls complete as per drawing and M.O.R.D. technical specifications section 1200 and 1600 and as per direction of Engineer – in- Charge including carriage of materials within all leads, lifts and other incidental . The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic metre | - | - |
| 7 | Construction of 1st (first) layer Bio enzyme based soil stablised layer (accredited by IRC) to a required thickness as per manufacturer design with local soil material/gravel/murram, having CBR greater than Equal to 5% (five percent) and treating it with Bio Enzyme in the ratio 1L (one litre) for 12.5 cum (twelve decimal five cubic metre) soil , spreading in uniform layer with motor grader on prepared surface. mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density complete as per technical specification including all labour, materials, like soil and metal, equipments etcetra, complete, including Supervision (Supervisor shall be provided by Bio Enzyme Vendor) as per the directions of the Engineer incharge of the work . Bio Enzyme Supervisor accomodation, food and local transport will be in scope of Contractor.The soil will have clay % (percent) by hydrometry between 8% (eight percent) to 30% (thirty percent) as per the entire satisfaction and directions of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic metre | - | - |
| 8 | Construction of 2nd (second) layer Bio enzyme based soil stablised layer (accredited by IRC) to a required thickness as per manufacturer design with local soil material/gravel/murram, having CBR greater than Equal to 6% (six percent) and treating it with Bio Enzyme in the ratio 1L (one litre) for 15.0 cum (fifteen cubic metre) soil with 25% (twenty five percent) 40mm (forty millimetre) crusher broken metal(of compacted thickness) in desing mix, spreading in uniform layer with motor grader on prepared surface. mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density complete as per technical specification including all labour, materials, like soil and metal, equipments etcetra, complete, including Supervision (Supervisor shall be provided by Bio Enzyme Vendor) as per the directions of the Engineer incharge of the work . Bio Enzyme Supervisor accomodation, food and local transport will be in scope of Contractor.The soil will have clay % (percent) by hydrometry between 8% (eight percent) to 30% (thirty percent) as per the entire satisfaction and directions of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic metre | - | - |
| 9 | Applying of curing material TerraCure after the application of Bio Enzyme layer for by mixing TerraCure with water in the ratio of 1:200 (one ration two hundred) and then appyling the mixed solution @ 3 (at the rate of three) Litres for 1 sq.mt (one square metre) as per the entire satisfaction and directions of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Square metre | - | - |
| 10 | Construction of granular sub-base by providing well graded materials, as per table 401spreading in uniform layers with tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three Wheel 80-100 (Eighty-hundred) kN static roller to achieve the desired density, complete as per MORD Technical Specification section 400 for grading-I Material, as per the entire satisfaction and directions of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. The rate is including octroi, royality, Malkana, toll tax, and any other taxes imposed by the Government but excluding GST. | - | Per Cubic metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.51 MB
SBD3.rar
Tender Documents • 5.36 MB
O1.pdf
Additional Documents • 0.41 MB
02.pdf
Additional Documents • 0.63 MB
BOQ_229149.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .