Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
25 May 2026, 6:00 pmClosed
Dy.City Engineer
Retrofitting and strendhning work at Dariyapur Gymnasium in Dariyapur ward.
306536
CENTRAL ZONE E-Tender Notice No.01/2026-2027 Tender No.08
Open
Civil Works - Others
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹10,000
19 May 2026
19 May 2026
19 May 2026
25 May 2026
19 May 2026
Name of work: bægÍtul œrhgtvwh Jtuzobtk ytJuj œrhgtvwh Bgw.SBlurNgbbtk Mjuclwk hux[tuVekxekd <&t
Mx[uL&lekd fhJtlt ftb ctc<.
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of Add.city.engineer. invites
percentage rate sealed tenders from interested contractors for the following work at different
locations within the limit of A.M.C.
1 Name of work bægÍtul œrhgtvwh Jtuzobtk ytJuj œrhgtvwh Bgw.SBlurNgbbtk Mjuclwk
hux[tuVekxekd <&t Mx[uL&lekd fhJtlt ftb ctc<.
2 Estimated Tender Amount Rs.
3 Tender fee Rs.900.00
(Non refundable) (Demand Draft in favour of Municipal Commissioner, Ahmedabad)
4 Time Limit 03 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be down
Documents loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “E-2” class having in Road Works in PWD in Govt. R&B /
CPWD / AMC or equivalent register with any other state Govt. or
7 Earnest Money Deposit Rs. 10,000/- (Demand Draft / pay order / Bank Guarantee in favour of
(Bid security) Municipal Commissioner, Ahmedabad is to be submitted as prescribed
(1 % of Estimate put to as below. Demand Draft/Bank Guarantee shall be from approved list of
AMC of banks and the issuing branch of bank guarantee shall be of
Ahmedabad city only and it should be valid for for 180 days. ( As
Per AMC finance Dept . Circular No. 5 Dt. 5/5/2007 & F.D.
Circular No. 29 Dt. 7/8/2010 & attched ANNEXURE - 1 finance
dept.circular No-40 Dt.05/11/2020. E.M.D. shall be submitted
physically along with the Physical Submission when applicable.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with tender
Tender Fees documents as described in the invitation of tender should be
submitted to Assistant Manager- Central Zone, 3rd Floor, B – Wing,
Sardar Patel Bhavan, Danapith, Ahmedabad-380001.
Bid submitted without bid security & tender fee shall be treated as
non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on www.nprocure.com
website as per Schedule mentioned in Notice inviting
• Tender Fee, EMD, technical bid and other relevant PQ Documents
as per check list given in tender shall be submitted physically in
two copies (Original & duplicate) in sealed envelope as per
Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.
Tenders. The tenders received after latest schedule date and time will not
be entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall fill Item
rate in BOQ online only until specified.
Price Bid shall be submitted physically duly signed & seal without
mentioning quoted rated, else it shall be considered as rejected.
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 3 % of Contract Value to be submitted in the form of (Demand Draft /
pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular.
and the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by Government.
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
• All the circulars which were published by Authorities of AMC time by time will be
applicable on said Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves
the rights to reject any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory.
In case authorized signatory holding Power of Attorney and Digital Signatory are not
the same, the bid shall be considered non-responsive.
Seal and Signature of the Bidder Add.city.engineer
Date: Ahmedabad Municipal
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Dy.City Engineer
Ahmedabad Municipal Corporation,
Name of Work bægÍtul œrhgtvwh Jtuzobtk ytJuj œrhgtvwh Bgw.SBlurNgbbtk Mjuclwk hux[tuVekxekd <&t
Mx[uL&lekd fhJtlt ftb ctc<.
I/We the undersigned have carefully gone through and clearly understood the Tender
documents of above mentioned project comprising of Notice Inviting tenders, Articles of
Agreement, Scope of work, Definition of terms, notes Instructions/Information to Bidder,
Condition of Contract, special condition of contract, Appendices, Specifications, Bill of
Quantities, furnished by AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time
specified all in accordance with the specification, designs, drawing and instruction in writing
referred to in the said document and with such materials as mentioned for, at the respective
rates which I/we have quoted in the Price Bid or at such other rates as may be fixed under the
provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and
when required, execute the contract, according to your form 1 of agreement as or in default
where of I/we bound myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as
decided by AMC from the date of receipt of letter of acceptance, you will forfeit the earnest
money paid by me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit",
for the sum as mentioned in NIT, the full value of which is to be absolutely forfeited to the
Employer If I/We fail to commence the work specified. Otherwise the Employer shall retain the
said sum, as on account of such Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in
accordance with conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or
any tender, which are received. I / We also understand & agree that Municipal Commissioner
Reserves the right to allot number of tenders to successful bidders at his sole discretion in case
if I / We am/are lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from
the date of opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters
mentioned in the tender terms and conditions. I am also bound to submit all supporting
Genuine Original documents as and when asked and if any discrepancy found in such
documents as well as in the executed Work with respect to Quality/Quantity at any stage of
work or even after completion of work, it will be solely my Responsibility. I am bound to prove
originality of all documents submitted by me and if any Documents found false/fake then
Municipal Commissioner/AMC has right to take any action/penalty/punishment against me.
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
I am also bound that if I/we, indulged into any malpractice and/or used any inferior
quality and/or the construction of road is found to be of an inferior quality under this contract
than in such case Municipal Commissioner/AMC has right to debar/ blacklist permanently.
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal
Corporation (referred to as Employer in these documents) invites sealed bids for the
construction of works (as defined in these documents and referred to as “the work”)
detailed in the table given in the Invitation for Bid (hereinafter called as IFB.) from
competent bidder. The bidders may submit bids for the works detailed in the table
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as
defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the
Clause-14. An agency that has been engaged by the Employer to provide consulting
services for the preparation or supervision of the works, and any of its affiliates, shall
not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the
firms those are blacklisted/ debarred for specified period by AMC, Governement of
Gujarat, Government of India or any other entity controlled by it, would not be eligible
to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register as per Notice Inviting Tender having in Road Works in
PWD in Govt. R&B / CPWD / AMC or equivalent register with any other state Govt. or
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are subject
to be disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and
attachments submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing
the contract, inordinate delays in completion, litigation history, or financial failures
etc. or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for
the purpose of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and
other advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his
commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
• The envelope does not show on the outside the reference of bid and thus gets
opened before the due date of opening.
• The E.M.D. is not deposited in full and in the manner as specified in the clause
of Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the
bidder(s) for their misleading or false representations in the forms statements
etc. for the period to be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his
Bid. Employer will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and
familiarize himself with the site of Works and its surroundings including source of earth,
water, road aggregates etc. and obtain all information that may be necessary for
preparing the Bid and entering into a contract for construction of the Works. The costs
of visiting the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in case of,
• If the quantity stipulated in the tender items varies or the scope of work changes and
thereby total amount of work increases / decreases up to any extent.
thereby total amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision
• If the items stipulated in the tender shall not be executed as per site condition/
requirements. No claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle
and no claim shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
• The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, forms, Annexes in the bid
document. Failure to comply with the requirements of bid documents shall be at the
bidder’s own risk. Bids which are not substantially responsive to the requirements of
the bid documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed
on website www.nprocure.com The prospective bidder shall refer to website to check
any addendum before 24 hours of opening of bids. AMC will not give any
advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his desecration, extend as
necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so
than also the changes made through such addendum shall be applicable & bound to
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents
along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with
these Instructions to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and
other marked as “Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on
the date of physical submission of bid and addressed to the addressee given in the NIT
duly super scribed “Name of Work, Bid due date and time, Name and address of the
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the
percentage rate in the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for
any other cause shall be included in the rates, prices and total Bid Price submitted by
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
the Bidder, except otherwise stated in the Bid document. Employer will not
compensate the bidder (contractor) for any change in duties, taxes and other levies
payable by the contractor under the contract and any other reasons.
• The percentage rate and bid price quoted by the bidder shall be fixed up to the
completion of Work and shall not be subject to adjustment on any account, except
where expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made
in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid
for a shorter period shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the Employer
may request that the bidders may extend the period of validity for a specified
additional period. The request and the bidders' responses shall be made in writing or by
cable. A bidder may refuse the request without forfeiting his bid security. A bidder
agreeing to the request will not be required or permitted to modify his bid, but will be
required to extend the validity of his bid security for a period of the extension.
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as
part of his bid, in the form of Demand Draft / pay order / Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad City only.
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the
Employer as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated
as non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be
returned as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest
tenders, will be returned when the successful bidder has furnished the required
security deposit and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed
the Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of
the bank guarantee shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp
papers of requisite value in accordance with the stamp Act applicable to that particular
state of Indian Union, where executed.
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall
clearly indicate in (block letters) his name, designation, Power of Attorney No. / Signing
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly
signed/initialed by the executing officers and the last page shall be signed in full,
indicating the particulars as aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate
envelopes and the three sealed envelopes shall be sealed in an outer envelope. The Bid
envelopes shall be marked as follows:-
• Complete Tender Document with all necessary qualification related documents (in
Above two envelopes shall be kept in one envelope and it should be marked as
“Technical Bid” and sealed. This Outer envelope should mention the name of firm of
bidder, his address, contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c) Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by
the Employer at the address specified in bid information not later than the date
indicated on the face sheet of the document. In the event of the specified date for the
submission of bids declared a holiday for the Employer, the Bids will be received up to
the appointed time on the next working day. The Bidder is further required to submit
Documents in Physical Form on or before the Bid Due Date and before the time of
submission as specified in NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n)
procure e-tendering portal on account of delay in submission at bidder's end. Bidder
shall ensure that they submit the bid well before the "Due Date & Time of Bid-
Submission". AMC shall not be responsible if bidder is not able to submit the bid on
account of failure in network/internet connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an amendment
in accordance with respective Clause, in which case all rights and obligations of the
Employer and the bidders previously subject to the original deadline will then be
subject to the new deadline.
18.4 All bidders are requested to see the website of (n) procure for amendment /
corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected
and returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be returned
unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by writing, facsimile or e-mail confirmed by
registered letter. This letter (hereinafter and in the Conditions of Contract called the
“Letter of Acceptance” will state the sum that the Employer will pay the Contractor in
consideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to
the furnishing of a Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the
Successful Bidder. It will be signed by the Employer and the Successful Bidder.
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within
28 days after the successful bidder (hereinafter called the Contractor) receives the
Letter of Acceptance, unless they agree otherwise, subject to furnishing the security
deposit before signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful and release
their Earnest Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver
to the Employer a security deposit in the form of Bank Guarantee for an amount
equivalent to 5% of the Contract Price valid for the period of valid till 90 days beyond
Date of completion of work. The Security Deposit shall be payable in 10 days (for
tenders upto Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above)from date
of receipt of LOA failing which interest @ 4% per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the
Employer, from Ahmedabad branch of any Banks mentioned in the clause no. 16.2 of
these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission
of security deposit or late renewal of bank guarantee for the number of days delayed
for submission or discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same
verbatim as per the format. Bank Guarantee shall be submitted on right value of stamp
paper and for correct value of contract.
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of the
22.6 In case of any contract amendment during execution of the contract enhancing value of
the contract the BG value shall be enhanced accordingly. Validity of BG shall be
commercial terms and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer
under the terms of this Contract or any other contract or on any other account
whatsoever may be deducted from Security Deposit. Also in the event of the
Contractor's Security Deposit being reduced by reasons of such deductions, as
aforesaid, the Contractor shall, within 14 days of receipt of notice of demand from the
Engineer-in-Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of
validities of Bank Guarantees as may have been furnished by the Contractor from time
to time, are required to be extended/renewed, the Contractor shall get the validity
periods of such guarantees extended/renewed, and furnish these to the Engineer-in-
Charge one month before the expiry date of the aforesaid Guarantees originally
furnished failing which the existing Bank Guarantees shall be invoked by the Engineer –
in – charge. Also in case of any deficit in securities on any account as might occur or is
noticed, the Contractor shall forthwith recoup/replace the same with acceptable
Security Deposit.
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as
per contract are not completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the
contractor after 45 days of completion date / Final Bill paid date which ever is later. No
interest on the amount of Security Deposit shall be paid to the Contractor at the time of
release of Security Deposit as stated above.
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at
Employer’s office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall
be final and binding to the bidder.
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration
resulting from Contractors completed or under execution by him over last five years. If
the details of Litigation History are hidden by the Bidder and later on it comes to the
knowledge of the Employer, the Bidder shall be disqualified for the proposed work and
other appropriate actions shall be taken against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employer Value of the Reasons/Details for Remarks showing
Year Name of Project (Rs.) litigation/arbitration Present Status
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the
same shall be treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or any
partner of a joint venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to
knowledge of the employer the bidder shall be disqualified for the proposed work and
other appropriate actions shall be taken against the bidder.
Seal and Signature of the Bidder Add,city.engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time limit,
the Contractor shall pay penalty of 10% of amount of actual remaining work. The
amount of work for which the scope of contractor is reduced shall not be considered
for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date:
23/05/2017 and all latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such
retention money shall be released in the final bill of the said work. AMC reserves right
to deduct any amount to compensate the poor performance of the contractor i.e. poor
quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not subcontract
any portion of Work without the approval of the Employer’s Representative. Any
subcontracting shall not relieve the Contractor from any contractual obligations or
responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which the
name of the subcontractor and scope of works activities to be performed by him is
already stated in the contract or supply of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel
as referred to in the Bid document to carry out the functions stated in the Schedule or
other personnel approved by the Engineer. The Engineer will approve any proposed
replacement of key personnel only if their qualifications, abilities, and relevant
experience are substantially equal to or better than those of the personnel listed in the
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons
thereof, for his misconduct or inadequacy of technical skills and experience, who is a
member of the Contractor’s staff or his work force, the Contractor shall ensure that the
person leaves the Site within seven days and has no further connection with the work
in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not be
erected on the site of work and contractor shall make his own arrangements to provide
such accommodations as per the rules of the local bodies. He shall make his own
arrangements for housing, stores, field office etc. He shall submit a site layout plan
indicating the location of various site facilities to be created by him at his cost for the
execution of work. The Owner shall in no way be responsible for any delay on this
account and no claim on this account whatsoever shall be entertained. All Basic
amenities shall be provided by the Contractor to Labours as per the prevailing labour
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
5.1 The Contractor shall have full regard throughout execution, completion and defects
liability period to following safety aspects and shall take all necessary steps to ensure
that danger to safety is avoided all the time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly
engaged by him for the works
• Safety of all the employees including persons working on other contracts of
Employer at the same site of the Employer and Engineers employees engaged
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing,
warning signs, barricading, and cones; when and where necessary, or required by
Engineer in Charge or by any duly constituted authority for the protection of the works
or for the safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and off
the site and avoid damage or nuisance to persons or property of the public and others
arising as a consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution,
completion, and defects liability period. The contractor shall be responsible for and to
make good all injuries, damages and repairs, rendered necessary by fire, rain, traffic,
floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be provided
by the contractor. Nothing extra shall be payable on this account. It shall be provided
strictly with double scaffolding system with all the accessories etc. with adjustable
suitable working platforms to access the areas, with ease for working and inspection. It
shall be designed to take all incidental loads. It should cater to the safety features for
workmen. It shall be ensured that no damage is caused to any structure due to
5.6 All temporary warning/ caution boards display shall be provided and displayed during
day as well as night time by the contractor, wherever required and as directed by the
5.7 Arrangement of temporary water and electricity and telephone connection required, by
him, shall be made by the Contractor at his own cost and also necessary permissions
directly from relevant Owners shall be obtained by him under intimation to the Owner.
Also all initial and running charges and security deposit, if any in this regard shall be
borne by him. The Contractor shall abide by all the rules/ bye laws applicable in this
regard and he shall be solely responsible for any penalty on account of violation of any
of the rules and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety precautions,
the same shall be completely contractor’s responsibility. All the losses due to such
accidents and expenses of legal matters shall be borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the
complete installation and shall also be responsible for any pilferage, theft, damage,
penalty etc. in this regard. The Contractor shall indemnify the Owner against any claim
arising out of pilferage / theft, damage, penalty etc. whatsoever on this account.
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the work.
Necessary protective and safety equipments shall be provided to them by the
Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All wreckage
rubbish, excess materials, temporary works no longer required will be removed from
site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus
materials, rubbish, temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a. The schedule-B shall contain Memorandum showing items for the construction,
installation, testing, and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor
shall be paid only quantities calculated after taking measurements of executed
work. The rate stated in the schedule B for each item of work shall apply. The works
shall be measured by the Contractor jointly with the authorized representative of
the Engineer and all particulars required by the representative of the Engineer shall
be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working
space etc. is to be made.
9.1 The Engineer in Charge shall have power to make any variation of form, quality or
quantity of the works or any part thereof that may, in his opinion, be necessary and for
that purpose, or if for any other reason it shall, in his opinion, be appropriate, he shall
have the authority to instruct the Contractor to do and the Contractor shall do any of
Increase or decrease the quantity of any work up to any extent included in the
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects, if
any, of all such variations shall be valued in accordance with the following sub clauses.
Provided that where the issue of an instruction to vary the Works is necessitated by
some default or breach of contract by contractor or for which he is responsible, any
additional cost attributable to such default shall be borne by the Contractor.
9.3 The Contractor shall not make any such variation without an instruction of the
Engineer. No instruction is required for quantities varying from those provided for the
items in the contract schedule B.
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as
follows in the same order of priority.
a) Variations in the quantities of work in schedule of quantities shall not vitiate the
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
b) The contractor shall be bound to execute extra items of work as directed by the
Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where there
is a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out by
the Contractor and he shall be paid at the rate fixed by Employer which shall be fixed as
lowest of the rates derived by rate analysis based on the following three methods. , the
priority of the documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year
2013-14, the rate of extra item shall be that rate and premium (above or below)
quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and
equipment, the cost of all temporary and incidental works, the overheads and
the Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour
costs, the cost of use of all plant, machinery, and equipment, the cost of all
temporary and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors profit
shall be taken at 10 % of the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices as
are, in his opinion appropriate and shall notify the Contractor accordingly with a copy
to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account
payments to be included in the Interim Payment Certificates, until rates and prices are
agreed as final by the Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which could have
been avoided by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention, other
recoveries in terms of the contract and taxes at source, as applicable under the law.
The Employer shall pay the Contractor the amounts certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in
previous certificates or as a result of an award from disputes review experts, Contractor
shall be paid such amount only. The Contractor shall not be paid any interest upon such
delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for by
the Employer and shall be deemed covered by other rates and prices in the Contract.
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and
Local Governing bodies prevailing on the date of award of the contract. The Contractor
will have to pay all such taxes and duties for the performance of this Contract. The
Employer will deduct from the Contractor’s monthly and other payments all taxes and
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
duties, which he is bound to recover in accordance with the applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central &
State and local Governing bodies, all orders, decrees of bodies, tribunals having any
jurisdiction or authority which in any manner affect those engaged or employed, and
anything related to carrying out the work. All the bye-laws lay down by AMC/AUDA and
any other local bodies while executing the work shall be adhered to. All taxes of local
bodies shall be borne by the contractor. The Contractor shall arrange to give all notices
required by any authority and to pay to such authority all the fees that may have to be
paid for the material, plants, equipments etc. The Contractor shall also adhere to all
traffic restrictions notified by the local authorities. He shall protect and indemnify the
Owner and its officials & employees against any claim or liability arising out of
violations of any such laws, ordinances, orders, decree, whether by himself or by his
employees or his authorized representatives. Nothing extra shall be payable on these
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No.
CWA/2004-1831-M(3) dt. 9/12/05 issued by G.O.G. (non-refundable) shall be deducted
from every bills which shall be deposited to Govt. Labour Department for Labour
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between the
Start Date and the end of the Defects Correction periods shall be remedied by the
Contractor at the Contractor's cost if the loss or damage arises from the Contractor's
acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the
Works and the Engineer will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
1. To commence the works on site within the period stated in the Appendix to Bid
after receipt by him of a Notice to this effect from the Engineer/Employer after
signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after
received notice
3. Has failed to comply with a notice issued or an instruction issued within
days after having received.
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
4. Abandons the works or otherwise plainly demonstrates the intention not to
continue performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior
written permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or
administration order made against him, compounds with his creditors, or
carries on business under receive, trustee or manager for the benefit of his
creditors, or if any act is done or event occurs which (under applicable Laws)
has a similar effect to any of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days notice
to the contractor, terminate the contract and expel the contractor from the site.
However, in the case of sub-paragraphs (h), the Employer may be notice terminate the
contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other rights
of the Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any other
entities to do so. The Employer and these entities may then use any goods, contractor’s
documents and other design documents made by or on behalf of the contractor.
18.5 The Employer or the Contractor may terminate the Contract if the other party causes a
fundamental breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the following:
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the
current Program and the stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other
than for a reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental
breach of Contract and the Contractor fails to correct it within a reasonable period
of time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for
which the maximum amount of liquidated damages becomes payable as defined in
the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving,
receiving or soliciting of anything of value to influence the action of a public official
in the procurement process or in contract execution. “Fraudulent practice” means a
misrepresentation of facts in order to influence a procurement process or the
execution of a contract to the detriment of the Borrower, and includes collusive
practice among Bidders (prior to or after bid submission) designed to establish bid
prices at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the Engineer
for a cause other than those listed above, the Engineer shall decide whether the breach
is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for convenience.
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the Site
safe and secure and leave the Site as soon as reasonably possible and handover the site
to the Employer including all materials and plant and equipment existing there upon.
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the accuracy
of the same. He shall also be responsible for the correctness of the positions, levels,
dimensions, and alignment of all parts of the structures as per instructions given to him.
If at any time any error shall appear during the progress of any part of the work, the
contractor shall at his own expense rectify such error if called upon to the satisfaction of
the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises out
of or under this Contract against the contractor the same may be deducted by the
Municipal Corporation from any sum then due or which at any time thereafter may
become due to the contractor under this contract and failing that under any other
contract with the Municipal Corporation or from any sum due to the contractor with the
Municipal Corporation (which may be available with Municipal Corporation), or from his
retention money, or he shall pay the claim on demand. The Municipal Corporation
reserves the right to carry out post payment audit and technical examination of the final
bill including all supporting vouchers, abstracts, etc.
20.2 The Municipal Corporation further reserves the right to enforce recovery of any over
payment when detected notwithstanding the fact that the amount of the final bill may
be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is discovered in
respect of any work done by the Contractor or alleged to have been done by him under
the contract, it shall be recovered by the Municipal Corporation from the contractor by
way of all the means prescribed above or if any under payment is discovered by the
Municipal Corporation, any amount due to the contractor under this contract or under
payment may be adjusted against any amount then due or which may at any time
thereafter become due before payment is made to the contractor from him to the
Municipal Corporation on any other contract account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any part
for reasons other than on account of bad or imperfect work, the materials obtained
from dismantling will be the property of the A.M.C. and will be disposed of as per
instruction of Engineer-in-charge in the best interest of the A.M.C.
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following
matters, whether such disputes arise during the progress of the work or after the
completion or abandonment thereof, shall be referred an independent Arbitrator
appointed by AMC as far possible in consultation with the agency if it is necessary and
such disputes shall be settled in accordance with the arbitration and conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or
upon the works of the site thereof or belonging to the contractor or procured
by him and intended to be used for execution of the work or any part thereof
possession of which may have been taken by the Engineer-in-charge under the
said clause –5.
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the
items of works not accepted as completed fully in accordance with the
sanctioned specifications.
(iii) The rate of part of payment for any class of work which is included in the
additional or altered work carried out by the contractor in accordance with the
instructions of the Engineer-in-charge under clause 14 and the rates for which
is to be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be
purchased by the contractor before receipt of notice given by the Engineer-in-
charge under clause 15 and/or amount of compensation payable to the
contractor under the said clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under
clause 17 in the event of this failure to rectify, remove or reconstruct the work
within the period specified in the written intimation or the amount of expenses
incurred by the Engineer-in-charge under the said clause17 in rectifying,
removing or re-executing the work or in removing and replacing the materials
or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause
17 for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as
estimates and assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause
in accordance with the instructions and the requirement of the Engineer-in-
charge in case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons
and calculations to every item of claims. The decision will have to be
implemented by all the concerned.
(x) In case of dispute leading to the contractor or Ahmedabad Municipal
Corporation approaching on Court of Law. It shall be within the jurisdiction
where the site of work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under
clause 5 to take possession of all or any tools, plants, materials and stores in or upon
the works of site thereof belonging to the contractor or procured by him and
intended to be used for the execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the
contractor in any work or from removing such materials to other places, during the
period the work is stopped or suspended in pursuance, of notice given to the
contractor under clause
iii) Progress of the work or the carrying out the additional or altered work in accordance
with the provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by
AMC. No separate payment will be made to the contractor for this. . The contractor
shall have to submit the same in hard copy as well as soft copy as and when demanded
23.2 No photograph of the works or any part thereof or plant employed thereon, except
those permitted under clause 59.1, shall be taken, or permitted to be taken by the
Contractor or by any of his employees or any employees of his sub-Contractors without
the prior approval of the Engineer in writing. No photographs/ videography shall be
published or otherwise circulated without the approval of the Engineer in writing.
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
Seal and Signature of the Bidder Add.city.engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
yb>tJt> BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe >hJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt yb>tJt> BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle
btLg gt>elt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu yb>tJt>
BGþrl.ftuvtuohuNlbtk btLg ftuLx[tfxhtule gt>ebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh
mt&u stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs
ftb fhJt mûtb ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb
mk<tu»tfthf <ubs xtRb jebexbtk ÃþY fhJt sYhe mJj<,ylwCJ, ûtb<t ylu
VtgltLmegj hemtumo hsw fhJtlt hnuNu.
z:- yb>tJt> Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe
ylwmth <&t mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc yb>tJt>
Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve ylu
btv>kztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t,
vtKe btdo, mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu.
xuLzhhu ftblu mtRx ylu rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm
btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu, gtzo, zevtu
btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t
ftblt buRxulLm btxule søgt)
(h) yt ftble mbg bgto>t bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle >hufu >huf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt
>M<tJus vh< fhJtlt hnuNu.
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth
Ôgrf<lu yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh
mt&u cezJtle hnuNu.
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt >huf vtlt ylu rJd<tu vh ftuLx[tfxhu
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh >eM<tJustult jFtKbtk ftuR AufAtf fu
VhuVth fhJt >uuJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk
jFtKbtk ftuR Cwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu
<ult mtawk jFtK fu ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk >NtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw
lrn ntug <tu xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt
Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdo>Nol btxu mtbtLg rlgbtu ylu mwaltytu vK
ft¤SvwJof JtkaJt rJlk<e Au.
(1) ftuEvK fthK >NtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^<
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz
y&Jt vîr< y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu c>ÕGþ / c>Õgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk >huf Ctde>th y&Jt <u ykdulwk bwFðgthltbwk
^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk
mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
z:- xuLzh MJefthJw, h> fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl.
frb§h©eltu rlKog ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg
<tu <u ykdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff>tJtuu fhe NfNu lrn
fu ftg>tfeg ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve
>uJtLþk Au <uJtu &R NfNu lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< >NtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble
ftuRvK Cwjawf leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
(1) xuLzh Chlthu >hlt Ftltbtk sKtJuj Nç>tu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk
Nç>tuubtk sKtJuj hfb btLg htFJtbtk ytJNu.
(2) yufb >h ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu >NtoJ<e CtJ vºtflt
Ftltbtk&e hfbbtk Cwj sKtg <tu yufb >h btLg htFJtbkt ytJNu ylu >hlt
yt^thu dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu
(10) y:- ftbltu «tud{um mbgbgto>t bwsc fhJtltu hnuNu. yt mbgbgot>t 10 jtF mw^elt
ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 10 r>Jm <&t 10 jtF &e Wvhltk ftb btxu
yuj.ytu.ytR. ytÃg <theF&e 15 r>Jm&e NY &guj dKJtbt ytJNu. <&t <u >hBgtl
ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût
mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw ftb >hBgtl su ftuR VuhVth &Nu <ultu
J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht Yt.10,00,000.00 (>m jtF) mw^elt xuLzhle bkswheltu XhtJ
vtzgt ct> (LOI) ytvJtbtk ytJNu ðgth ct> r>l - 10 btk rm¾gtuhexe zevtuÍex
sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt rfMmtbtk
Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgto>tbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem
RLJtRxuz xuLzh) btk sKtJuj «btKu bkswh &guj mbgbgto>t ct>lt FhuFh ctfe
ftble hfblt bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt >h vwhtk &gujt ftb btxult Au
ylu <ubtk bswhe, vtjF, ÃjtLx, >uFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu
ytufx[tug Jduhu ykNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu
juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu >h fh<t J^thtle ftuR
awfJKe ykdult <ublt ftuR >tJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
hswyt<lu fthKu y&Jt ftuR Ôgrf<yu (vAe<u ctk^ftb rJCtdltu fboathe ntug fu l
ntug) <ublu ytvuje btne<elu yt^thu vtA¤&e ftuR >tJt> hsw fhJt nf>th hnuNu
lnek. <ublw xuLzh ChJt <&t <ubtk sw>t sw>t CtJ ylu >h ChJt btxu sYhe yuJe
<btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu vtu<u xuLzh hsw fhJtlu je^u
y&Jt <ubtk&e WCt &<t ftuR stuFb fu sJtc>thebtk&e Axfe NfNu lnek. m>h
ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc
fhJtbt ytJNu. <&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh
«btKu ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt >huf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh
bwsclwk vubuLx + yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su
VtRlj cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t bwsc su ftuR hfble fvt< fhJtle
&Nu <u bwsc ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e >M<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth
mbd{ ftblu jtdw vzNu.
ce:- xuLzhbtk >NtoJuj ftb mkck^e >M<tJusbtk >NtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau
>NotJuj ¢btlwmth >M<tJusbtk >NtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e
>M<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu
(yu) yufb ylu f>:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk f>, ytfth, ytkfzt f>ta Ftuxt ntug <tu btvujt f>, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t
ykdule ltuk^ bwfe yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk
ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l
fhJe ylu Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk
y&oDxl fhtJJwk.
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf
mt&u s c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom
jtRllu lwfNtl &Nu <tu <ule mkvwKo sJtc>the (òlbtj) ftuLx[tfxhle vtu<tle
hnuNu. mtRx Wvh ftb >hBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl
&tg <ule sJtc>the ftuLx[tfxhle hnuNu. vtujem Vrhgt> &tg <tu <ule sJtc>the vK
ftuLxtfxhle hnuNu. CuFz Dme l vzu <ule sJtc>the vK vtujem Vrhgt>bt
ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u btxu mjtb<elt vdjt (suJt fu >tuhzwk ctk^e
bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk
W<thNu <tu ftuLx[tfxh s vtujem Vrhgt>bt sJtc>th hnuNu ylu Bgwrl.ftuvtuohuNlltu
ftuRvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxjwk mbSlu s xuLzh ChJwk.
bswhtultu rJbtu vK W<thJtu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu
fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x
&tg <tu rlgb ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< r>l 1btk
vh< jR sJtltu hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc
ve.yuV/juch yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftg>tlw vtjl
fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u
ytvJtle hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf
ytvJtLþk hnuNu.
(21) ftuRvK ftg>tfeg jexeduNl yb>tJt> Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc
W<thJtltu <ubs dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtc>the ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt >NtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl
bwsc jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl
Bgwrl.ftuvtuohuNlt rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk
mbtJuN l ntug <uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt
«Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u
bwsc awkfJKe fhJtbtk ytJNu.
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
(26) atjw ftb >hBgtl «tuxufNlle mkvwKo sJtc>the ftuLx[tfxhle hnuNu. subtk vevzt,
>tuhzt Cgmwaf ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu.
ylu ftuRvK yfMbt< &Nu <tu <ule mkvwKo sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe >hBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt
yLg Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t
vtujem ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk >hhtus
fhuj ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug
<tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh
ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•ttt yuze.mexe yuLSlehgh©elu hnuNu.
(29) >huf ytRxblt MvuNeVefuNl yb>tJt> Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t
btLg htFuj MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt
mkstudtubtk yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn
ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu
sutFbu Jdh ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu
cejbtk&e hfb ftve juJtbtk ytJNu.
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e
ftve juJtbtk ytJNu.
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg
>hBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex
J^the ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu
ftuLx[t¾xhu VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus
lu jd<tk ftb btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek
<ubs buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk vtjl fhJwk.
(34) yu.yth.me «fthlw xuLzh ntuR su <u ftb JtRÍ yjd&e ykœtsle bkswhe btkde
yjd&e Jfo ytuzoh ytve ftbdehe <tfeœu atjw fhJe su <u ftbJtRÍ ytvJtbtk
ytJuj Jfo ytuzoh btk œNtoJuj xtRbjebexbtk vwKo fhJtle hnuNu.
35) S.yum.xe.ftWLmej îtht l¬e fhuj «J<obtl S.yum.xe CtJ bwsc ytvJtbtk
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu
M&¤le bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS
ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu
xuLzhlu jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj
fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne ylu rmfft
TECHNICAL SPECIFICATIONS:
Following technical specifications shall be applicable to the relevant items of BOQ
ITEM NO .01 REMOVING AND SCRAPING OF OLD DETERIORATED PLASTER OF ANY THICKNESS FROM WALL /RCC
MEMBER INCLUDING STACKING OF SERVICEABLE MATERIAL AND DISPOSAL OF UNSERVICEABLE FROM SITE OF WORK
WITH ALL LEAD AND LIFT ( S.O.R-2023-24 - R OAD & B RIDGE W ORKS , I T. CODE NO -20005;P.NO .142 )
ITEM NO .02 P ROVIDING TMT B AR FE 500D REINFOECEMENT FOR R.C.C. WORK INCLUDING BENDING,BINDING AND
PLACING IN POSITION COMPLETE UPTO FLOOR TWO LEVEL
ITEM NO .03 P ROVIDING 15MM THICK CEMENT PLASTER IN SINGLE COAT ON ROUGH (SIMILAR )SIDE OF SINGLE OR
HALF BRICK WALLS FOR INTERIOR PLASTERING UPTO FLOOR TWO LEVEL AND FINISHED EVEN AND SMOOTH IN
(I)CEMENT MORTAR 1:3 (1-CEMENT:3- SAND) ( S.O.R -2024-25-17002A)1.0.
ITEM NO .04 POLYMER MODIFIED MORTAR (PMM - PREMIX ) : P ROVIDING AND REPAIRING THE DAMAGED
CONCRETE PORTION WITH SINGLE COMPONENT , FIBRE REINFORCED, DUEL SHRINKAGECOMPENSATED , THIXOTROPIC,
CEMENTITIOUS PATCH REPAIR MORTAR RCC COLUMN / BEAM/SLAB IN THICKNESS OF 12MM TO 50 MM BOTH
VERTICAL & OVERHEAD DEPENDING ON SITE CONDITIONS IN LAYERS CAPABLE OF APPLYING 25MM THICK INITIALLY BY
HAND AND FINISHING WITH TROWEL , COMPACTING THE SAME AROUND BARS AND FINISHING IN LINE WITH EXISTING
CONCRETE SURFACE , AFTER APPLYING BONDING COAT AS DIRECTED BY CE. R USTICIDE & BOND COAT & ADDITIONAL
THICKNESS OF PMM INCLUDED IN THE ITEM.
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
Item No. 5: Providing & inserting Shear anchore by using polyester resin anchor grout after
making required dia hole & inserting required Dia Shear Anchor as per specifications as
directed by engineer incharge.
ITEM NO.06 : DISTEMPEING (T WO COATS) WITH OIL BOUND DISTEMPER OF APPROVED BRAND AND MANUFACTURE
AND OF REQUIRED SHADE ON WALL SURFACES TO GIVE AN EVEN
SHADE , OVER AND INCLUDING A PRIMING COAT WITH DISTEMPER PRIMER OF APPROVED BRAND AND MANUFACTURE
AFTER THOROUGHLY BRUSHING THE SURFACE
FREE FROM MORTAR DROPPING AND OTHER FOREIGN MATTER AND ALSO INCLUDING PREPARING THE SURFACE EVEN
AND SAND PAPERED SMOOTH.
ITEM NO.07 : APPLYING TWO COATS OF PUTTY & TWO COATS OF PRIMER OF APPROVED BRAND AND
MANUFAVTURE ON NEW WALL SURFACE TO GIVE AN EVEN SHADE INCLUDING THOROUGHLY BRUSHING THE SURFACE
FREE FROM MORTAR DROPPING AND OTHER FOREIGN MATTER AND SAND PAPERD SMOOTH
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (CENTRAL ZONE)
BILL OF QUANTITY
AHMEDABAD MUNICIPAL CORPORATION
Name of work :- RETROFITTING AND RESTREGTHNING WORK IN DARIYAPUR
GYMENSIUM IN DARIYAPUR WARD IN CENTRAL ZONE
Item Description Quantity
Rate Unit Amount
Removing and scraping of old deteriorated plaster
of any thickness from wall/RCC member including
stacking of serviceable material and disposal of
1 unserviceable from site of work with all lead and lift 155.00 19.38 Sqm
( S.O.R-2023-24 - Road & Bridge Works, It. Code No-
Providing TMT Bar FE 500D reinfoecement for R.C.C.
2 work including bending,binding and placing in 1000.00 75.00 KG
position complete upto floor two level
Providing 15mm thick cement plaster in single coat
on Rough (Similar)side of single or half brick walls for
interior plastering upto floor two level and finished
3 even and smooth in (i) 155.00 183.57 Sqm
Cement mortar 1:3 (1-cement:3-sand) ( S.O.R -
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
POLYMER MODIFIED MORTAR (PMM - PREMIX ) :
Providing and repairing the damaged concrete
portion with single component, fibre reinforced,
duel shrinkagecompensated , thixotropic,
cementitious patch repair mortar RCC column/
4 beam/slab in thickness of 12mm to 50mm both 12968.00 65.00 KG
vertical & overhead depending on site conditions in
layers capable of applying 25mm thick initially by
hand and finishing with trowel, compacting the
same around bars and finishing in line with existing
concrete surface, after applying bonding coat as
directed by CE. Rusticide & bond coat & additional
thickness of PMM included in the item.
Providing & inserting Shear anchore by using
5 polyester resin anchor grout after making required
dia hole & inserting required Dia Shear Anchor as
per specifications as directed by engineer incharge.
8mm to 10mm 290.00 110.00 Nos
Distempeing (Two coats) with oil bound distemper
of approved brand and manufacture and of required
shade on wall surfaces to give an even
6 shade, over and including a priming coat with 155.00 79.88 Sqm
distemper primer of approved brand and
manufacture after thoroughly brushing the surface
free from mortar dropping and other foreign matter
and also including preparing the surface even and
sand papered smooth.
Applying two coats of putty & two coats of primer of
approved brand and manufavture on new wall
7 surface to give an even shade including thoroughly 155.00 40.19 Sqm
brushing the surface free from mortar dropping and
other foreign matter and sand paperd smooth
Seal and Signature of the Bidder Add.city.engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 32 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 8.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .