| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-Finance | ₹5.7 L | L1 | Accepted-Finance Approved by CTA |
| 2 | L2₹5.8 LAccepted-Finance ANADANAGAR AGARTALA WEST TRIPURA | AGARTALA | WEST TRIPURA | TRIPURA | ₹5.8 L | L2 | Accepted-Finance Approved by CTA |
Tender Value
₹6.0 L
EMD Value
₹11,991
Closing Date
6 Aug 2026, 11:00 amClosed
AC Works
SHQ BSF TLM
Protection work behind the type III qtr to prevent soil erosion and drainage system under Sector BSF Teliamura
2026_BSF_920019_1
30/AC(W)/SHQ-TLM/Engg/2025-26
Open Tender
Civil Works
Works
SHQ BSF TLM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,991
10 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
6 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | 22.72 | cum | 177.5 | ₹4,032.8 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.32 | cum | 6,518.6 | ₹47,716.15 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 10.5 | Cum | 9,045.75 | ₹94,980.38 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for. Foundations, footings, bases of columns, etc. for mass concrete | 50 | Sqm | 392.15 | ₹19,607.5 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 525 | kg | 107.85 | ₹56,621.25 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 8.47 | sqm | 7,132.25 | ₹60,410.16 |
| 7 | 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:4 (1 cement: 4 fine sand) | 43.17 | sqm | 425.55 | ₹18,370.99 |
| 8 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 83.33 | sqm | 972 | ₹80,996.76 |
| 9 | Correction Factor on DSR 2023 on account of GST @ 0.973 (w.r.t CPWDOM No. 158/SE(TAS)/GST/2024/02-E dated 08/08/20240 | - | each | 10,333.87 | - |
| 10 | Add Cost index @ 61.00 % On DSR 2023 | - | each | 2,27,165.29 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_966845.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].