| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.7 LAccepted-AOC | ₹48.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹54.2 L+₹5.5 L (11.4%)Rejected-AOC CHELAMATTOM VALLAM KARAYIL HOUSE | KANNUR | KERALA | 670511 | ₹54.2 L+₹5.5 L (11.4%) | L2 | Rejected-AOC L2 |
| 3 | L3₹55.6 L+₹6.9 L (14.2%)Rejected-AOC | ₹55.6 L+₹6.9 L (14.2%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | GEORGE JOSEPH L2 | JOSE K K L3 | Jomon joseph L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix 1 -Maintenance of Existing Retaining wall | ||||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 223 | cum | 870.87 ₹1,94,204.01 Lowest | 892.81 ₹1,99,096.63 | 1,500 ₹3,34,500 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 178.4 | cum | 1,972.62 ₹3,51,915.41 Lowest | 2,022.3 ₹3,60,778.32 | 2,400 ₹4,28,160 |
| 1.00 | OD37725/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ( without bond stone)including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 114.93 | cum | 5,876.66 ₹6,75,428.04 | 6,024.67 ₹6,92,439.42 | 5,300 ₹6,09,150.2 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 313.87 | cum | 9,591.89 ₹30,10,568.15 | 9,833.48 ₹30,86,395.03 | 8,200 ₹25,73,701.2 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 197.4 | sqm | 443.94 ₹87,633.76 | 455.12 ₹89,840.69 | 350 ₹69,090 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 44.41 | cum | 9,851.3 ₹4,37,545.49 | 10,099.43 ₹4,48,566.18 | 9,000 ₹3,99,735 Lowest |
| 1.01 | OD33327/2025-2026:Earthwork in rough excavation in or under water banking excavated clay inlayers
not exceeding 20 cm in depth, breaking clods and dressing up in embankment for roads ,flood
banks, marginal banks and guide banks with all kinds of soil(CPWD 2.2.1-2.4-2.5)under excavation in stiff heavy Kayal clay. Certificate :-Certified that the observed data is prepared by taking the rates and labour charges as per current schedule of rate and has been prepared as per the actual observation at the site.all kinds of soil. | 497 | cum | 1,334.93 ₹6,63,460.21 | 1,368.55 ₹6,80,169.35 | 950 ₹4,72,150 Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
21 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER KD DIVISION MANCOMBU
GENERAL Maintanance of R Block Padasekharam General Rectification work of R Block Padasekharam in Kainakary Panchayath Kuttanad LAC General Civil Work
2026_Irrig_836339_1
IRR/KP/TR/7035/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Kainakary
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
20 Aug 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
13 Feb 2026 - 21 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1 -Maintenance of Existing Retaining wall | |||||
| 1.001 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | - | cum | - | - |
| 1.002 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.003 | OD37725/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble ( without bond stone)including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 0.6 | cum | - | - |
| 1.004 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 0.4 | cum | - | - |
| 1.005 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.006 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | OD33327/2025-2026:Earthwork in rough excavation in or under water banking excavated clay inlayers
not exceeding 20 cm in depth, breaking clods and dressing up in embankment for roads ,flood
banks, marginal banks and guide banks with all kinds of soil(CPWD 2.2.1-2.4-2.5)under excavation in stiff heavy Kayal clay. Certificate :-Certified that the observed data is prepared by taking the rates and labour charges as per current schedule of rate and has been prepared as per the actual observation at the site.all kinds of soil. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407835.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1407835.xls
BOQ • 0.30 MB
sbdRBLOCK.pdf
Tender Documents • 3.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .