Loading…
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹52.8 L
EMD Value
₹53,000
Closing Date
6 Nov 2026, 4:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, High Court Electrical Division
Replacement of Old & Non-effcient AC Machines by new Energy Efficient Inverter type Split AC machines in various buildings in Gujarat High Court Campus at Sola, Ahmedabad.
357950
07/01 of 2026/2027
Open
Electrical
Works
Ahmedabad
6 documents required · 6 mandatory
₹2,400
Executive Engineer, Highcourt Electrical (R AND B) Division, Ahmedabad
₹53,000
23 Oct 2026
23 Oct 2026
23 Oct 2026
6 Nov 2026
23 Oct 2026
Name of work:- Replacement of Old & Non-effcient AC Machines by new Energy Efficient Inverter type Split AC machines in
various buildings in Gujarat High Court Campus at Sola, Ahmedabad.
Particular Approximately Qty Rate at which the materials will be Place of Delivery
charged in the contractor
Deputy Executive Engineer, Executive Engineer,
Signature of Contractor High Court Electrical Sub Dn No-1, High Court Electrical Division
Ahmedabad. Ahmedabad.
Name of work:- Replacement of Old & Non-effcient AC Machines by new Energy Efficient Inverter type Split AC machines in various buildings in Gujarat
High Court Campus at Sola, Ahmedabad.
Sr No Qty estimated but may be Item of work Tendered rates in word & figure Unit Total Amount
Sr No Qty estimated but may be Item of work Tendered rates in word & figure Unit Total Amount
more or less according to
1A 41.00 Nos. Replacing old, rusted & u/s, split AC machines by 60709.08 Rupees Sixty Thousand Ea.
providing and erecting Inverter based approved Seven Hundred Nine And
make split air-conditioning unit consisting of Paise Eight Only
condensing unit with variable speed fan motor,
inverter type hermetically sealed rotary compressor
with accessories etc. duly connected separately
erected evaporating unit and blower motor with its
accessories by means of extra supplied proper
insulated copper tubing,drain PVC pipes suitable for
( cost includes Eco Friendly green gas charging and
15A plug top & Remote Control & MS Stand) with
necessary core cutting. (2)For ISEER Range
(KWH/KWH)(4.0 to 4.49) (B) for 1.5 ton capacity-
Premium Cat. (Make - Mitsubishi Electric or as per
instruction of High court authority)
1B 30.00 Nos. (2)For ISEER Range (KWH/KWH)(4.0 to 4.49) (C) 79620.32 Rupees Seventy Nine Ea.
for 1.9 to 2 ton capacity-Premium Cat. (Make - Thousand Six Hundred
Mitsubishi Electric or as per instruction of High Twenty And Paise Thirty
court authority) Two Only
2 308.00 Mtrs. Replacing old, rusted piping by new supplying and 1158.47 Rupees One Thousand Mtr.
erecting insulated pair of soft copper tubing open or One Hundred Fifty Eight
concealed including power and control And Paise Forty Seven
cable,necessary PVC drain pipes for Split/Cassette Only
AC machine up to 4 TR capacity (As per Site
3 159.00 Mtrs. Replacing old, broker trunking by new supplying 277.75 Rupees Two Hundred Mtr.
and laying UPVC cable trunking system comprising Seventy Seven And Paise
unplasticised polyvinyl, chloride rigid material with Seventy Five Only
ignition free and flame proof confirming BS with
necessary end caps Internal and external bend, flat
bends, coupler, tee etc..All necessary accessories and
measuring of following sizes (As per Site
requirement) (1) 75 mm x 50 mm trunking
Rupees Fifty Two Lakh(s) Seventy Eight Thousand Six Hundred Fifty Two And Paise Eighty Nine Only
A. Total Tender Amount Rs…………………
B. Rebate or above tendred amount (if any)_____ %
(In Figure) Rs…………………
C. Total (A - B) Rs…………………
D. Less Dismental (C - D) Rs…………………
E. Total (C - D) Rs…………………
1) All work shall be carried out as per Public Works Department Handbook and other specification of Division or as directed.
2) Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and hold good for work under all conditions, site, moisture, weather etc.
3) I/We hereby declare that, I/ We have visited the site and fully acquainted myself / ourselves with the local situation regarding materials, & other factors pertaining to the work before
submitting this tender.
4) I / We hereby declare that, I / We have carefully studied conditions of contract, specifications & other than tender documents of this work and agree to execute that same accordngly.
5)The rates shoud be inclusive of all taxes & levies.
6) The GST will be paid separately on the bills. Hence, it is the responsibility of the contractor to pay the G.S.T to the concerned Authority.
Deputy Executive Engineer, Executive Engineer,
Signature of Contractor High Court Electrical Sub Dn No-1, High Court Electrical Dn
Ahmedabad. Ahmedabad.
LIST OF D.M. SCHEDULE
Name of work:- Replacement of Old & Non-effcient AC Machines by new Energy Efficient Inverter
type Split AC machines in various buildings in Gujarat High Court Campus at Sola, Ahmedabad.
Sr No Item Qty Unit Rate As per T.S.
cost of old rusted & non efficient
1.5 ton window AC
cost of old rusted & non efficient
1.5 ton Split AC
cost of old rusted & non efficient
cost of old & u/s copper pipe and
5 cost of old & Broken trunking 126 Mtr
Deputy Executive Engineer, Executive Engineer,
Signature of Contractor High Court Electrical Sub Dn No-1, High Court Electrical Dn
Ahmedabad. Ahmedabad.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Free AMC Scope of Work for new 71AC.pdf
Notice no. 7 of 2026-27 (English).pdf
Notice no. 7 of 2026-27 GUJARATI.pdf
sbd of 71 Nos (1).pdf
SCHEDULE A B AND DM.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .