| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹6.5 L+₹3,477.34 (0.53%)Accepted-AOC | ₹6.5 L+₹3,477.34 (0.53%) Quoted ₹6.6 L | L2 | Accepted-AOC As per order Number 135/97/Co-op dated 13.11.97 item number 8.b (i) second lowest bidder consider as lowest bidder |
| 2 | L1₹6.5 LRejected-AOC | ₹6.5 L | L1 | Rejected-AOC As per order Number 135/97/Co-op dated 13.11.97 item number 8.b (i) second lowest bidder consider as lowest bidder |
| 3 | L3₹6.5 L+₹3,221.03 (0.49%)Rejected-Finance | ₹6.5 L+₹3,221.03 (0.49%) | L3 | Rejected-Finance Third Lowest bidder |
| Sl No | Description | Qty | Unit | SREYAS L1 | PRAMOD.T.P L3 | SECRETARY L2 |
|---|---|---|---|---|---|---|
| 1.00Detailed estimate | ||||||
| 1.01 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 225 | sqm | 18 ₹4,050 Lowest | 18.19 ₹4,092.75 | 18 ₹4,050 Lowest |
| 1.02 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10.57 | cum | 358 ₹3,785.85 Lowest | 359.72 ₹3,804.04 | 359 ₹3,796.43 |
| 1.03 | 60.7.2
DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 9.16 | cum | 2,952 ₹27,055.08 Lowest | 2,967.19 ₹27,194.3 | 2,967 ₹27,192.56 |
| 1.04 | 7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 4.76 | cum | 8,302 ₹39,509.22 Lowest | 8,343.49 ₹39,706.67 | 8,343 ₹39,704.34 |
| 1.05 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 17.5 | cum | 317 ₹5,547.5 Lowest | 318.47 ₹5,573.23 | 318 ₹5,565 |
| 1.06 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.41 | cum | 7,893 ₹11,129.13 Lowest | 7,932 ₹11,184.12 | 7,932 ₹11,184.12 |
| 1.07 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.32 | cum | 9,190 ₹2,977.56 Lowest | 9,235 ₹2,992.14 | 9,235 ₹2,992.14 |
| 1.08 | 51.6.4.3
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in superstructure above plinth level up to floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand) | 3.77 | cum | 9,921 ₹37,352.57 Lowest | 9,970 ₹37,537.05 | 9,970 ₹37,537.05 |
| 1.09 | 13.33.1
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 51.7 | sqm | 398 ₹20,576.6 Lowest | 400.47 ₹20,704.3 | 400 ₹20,680 |
Tender Value
₹7.7 L
EMD Value
₹19,350
Closing Date
4 Mar 2026, 5:00 pmClosed
Divisional Forest Officer Konni
Divisional Forest Officer Konni. PIN 689691
Estimate for the cost of construction of Tourists resting place at Adavi under Konni range during 2025-26
2026_FD_840385_1
KFDDO/1810305/26/D
Open Tender
Civil Works - Buildings
Item Rate
90 days
konni
Please Refer Tender Notice
8 documents required · 8 mandatory
₹1,830
Yes
₹19,350
Yes
10 Sept 2026
25 Feb 2026
6 Mar 2026
25 Feb 2026
4 Mar 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed estimate | |||||
| 1.01 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 225 | sqm | - | - |
| 1.02 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10.58 | cum | - | - |
| 1.03 | 60.7.2
DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 9.17 | cum | - | - |
| 1.04 | 7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 4.76 | cum | - | - |
| 1.05 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 17.5 | cum | - | - |
| 1.06 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.41 | cum | - | - |
| 1.07 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.32 | cum | - | - |
| 1.08 | 51.6.4.3
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 5.0 in superstructure above plinth level up to floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand) | 3.77 | cum | - | - |
| 1.09 | 13.33.1
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 51.7 | sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
TD1810305.pdf
Tender Documents • 1.08 MB
Declaration.pdf
Other Document • 0.01 MB
preliminaryagreement.pdf
Additional Documents • 0.24 MB
e_payment.pdf
Additional Documents • 0.01 MB
BOQ_1416676.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .