Tender Value
₹39.4 L
EMD Value
₹39,000
Closing Date
10 Jun 2026, 6:00 pm4d left
Executive Engineer, Panchayat (R and B) Division, Navsari
Mukhyamantri Halpati Sarvangi Utkarsh Yojna : 2025-2026 Const. of Chapaldhara village navi haraji faliya halpativas road Ch 0/0 to 0/600 Ta,Vansda Dist.Navsari
310816
25 of 2025-26
Open
Civil Works - Roads
Navsari
7 documents required · 7 mandatory
₹1,500
Executive Engineer, Panchayat (R and B) Division, Navsari
₹39,000
3 Jun 2026
3 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
It. Rate In
Specification and reference to book of Quantity Unit Amount
No. Figures
specifications)
1 Clearing and grubbing road land including uprooting 0.24 Hect 34889.38
rank vegetation grass bushes,shrubs,sapling and trees
girth up to 300 mm removal of stumps of trees cut
earlier and disposal of unserviceable materials(D) By
mechanical means in area of thorny jungle
2 Earthwork in cutting in all sorts of soil and soft murrum 1211.00 Cum. 106.81
including conveying and putting the stuff in spoil bank
maintaining minimum distance of five meter between
top edge and cutting and toe of spoil bank.
3 Supplying and fixing reinforced concrete heavy duty 45.00 rmt 1968.38
non-pressure pipes with collars for culverts carrying
heavy traffic as per IS 458-1991 specifications
including setting the pipes in C.M. 1:2 watering and
laying (to level or slopes) of class NP3 of following
internal daimeters.(v) 600mm dia.
4 Earthwork for embankment including breaking clods, 638.00 Cum. 173.67
dressing with all lead and lift and including watering
rolling and consolidation of subgrade in layers at
O.M.C. to required dry density including filling the
depression which occur during the process using power
roller 8T to 10T.(E) From Borrow area within 3.0KM.
5 Supplying, Stacking, Spreading & rolling of Hard 108.00 Cum. 684.58
Murrum on road side for hard side shoulder of work as
per specification including filling the mesure boxes of
standard size etc. complete.
6 Construction of granular sub-base by providing coarse 662.00 Cum. 842.89
graded material grading-II, spreading in uniform layers
with motor grader on prepared surface, mixing by mix
in place method with rotavator at OMC, and
compacting with vibratory roller to achieve the desired
density, complete as per clause 401.B
7 Construction of Granular Sub Base by providing coarse 470.00 Cum. 890.51
graded machine crushed B. T. material satisfying
MOST Specification of Grading - I using 53 mm to
mm @ 30% (M.C. Metal), 26.5 mm to 4.75 mm @ 60%
(M.C.Metal), 2.36 mm below @ 10% (Stone Dust)
including spreading in uniform layer with motor grader
on prepared surface, mixing by mix in place method
with rotavator at OMC and compacting with vibratory
roller to achieve the desired density with C.B.R. > 30%
8 etc. complete.
Providing, laying, spreading and compacting graded 443.00 Cum. 970.24
stone aggregate to Wet Mix Macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with paver in sub-
base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired
9 Providing and applying evenly Priming coat with 2770.00 Sqmt 62.84
emulsion asphalt at the rate of 7.50 Kg/ 10 Sq.m on
road surface using emulsion SS-1 (Himcol Made)
pressure spreayer etc. complete including the cost of
10 Providing and laying bituminous base course 37.5mm 207.80 MT 2123.05
thick compacted in one layer with tack coat of Emulsion
RS1 at the rate of 2.50 Kg / 10 Sqmt. and using B.T.
stone aggregate or required gradation and asphalt (VG-
30) grade for mixing @ 1.99 % by weight of total mix
for mixing including heating the aggregate and asphalt
by drum mix plant and spreading the same by paver
finisher and consolidation with vibratory roller including
providing all meterials, equipments, tools and plants,
oil, kerosene, fire wood, labour chrges etc. complete.
11 Providing & laying 50 mm. thick compacted Bituminous 304.70 MT 2645.97
Macadam with using RS1 Emulsion for tack coat at
2.50 Kg / 10 Sq.Mt. using stone aggregate as per
gradation and aspahlt grade VG-30 at 3.40 % by weight
of total mix hot laid process with drum mix plant
including consolidation with vibrating roller including
operating plant and machinery cost of asphalt, fuel, oil,
lubricant and labour charges etc. complete.
12 Providing & laying 25 mm. thick SDBC using B.T. stone 159.30 MT 3233.37
chips as per MORTH gradation and specification with
asphalt VG-30 at the rate of 50.00 kg. / M.Tone of total
wt. for mix i.e. (5.00 % ) by weight of total mix of
bitumen including mixing aggregates & asphalt by
continuous batching drum mix plant & spreading the
same by paver finisher including rolling & consolidation
with 10 - 12 tonnes vibratory roller & providing tools
plants, fire wood, oil, kerosene, labour charges using
contractor's own machineries etc. complete.
13 Providing and laying asphalt painting on B.T. surface 2770.00 Sqmt 30.94
with bitumen VG-30 at rate 5.00Kg / 10Sq.mt.
including spreading stone dust for painting surface at
rate of 0.03 cu.mt. / 10 sq.mt.
14 Providing and fixing ordinary Kilometer stone of precast 1.00 Nos. 704.33
C.C. 1:2:4 including necessary reinforcement as per
I.R.C. type design in C.C. 1:4:8 including
painting,lettering etc. complete (For O.D.R and V.R.)
15 Providing and fixing Hectometer as per I.R.C. type 3.00 Nos. 356.50
design including painting, lettering etc. complete.(ii)
Fixing in C.C. 1:5:10
16 Informatory Signs :-Providing and fixing sing boards 1.00 Nos. 3856.90
made out of 2mm aluminium sheet; size 80 x 60cms.
rectangle as per the design of IRC-67-1977 pre treated
with phospheting process & acid teching; coated with
one coat of epoxyprimer and two coats of best
qualityepoxy paint; reflectorised with retro refiective
sheeting as per latest M.O.S.T. Specifications; 3.1m
long stand postand frame fabricated from suitable
sizeiron angle of 35 x 35 x 3mm75x75x6mm as
required; painted with best qualityepoxy coatings in
black and whitebends. the details of symbol for
eachboard shall details of symbol for eachboard shall
be as per the instruction ofengineer in charge. The
fixing at site shall be in 1:2:4 CC block of size 45 x45 x
60cms. for each leg. including excavation curing tec.
complete under the supervision of engineer in
17 Village name/ Bump Ahed sign :-Providing and fixing 8.00 Nos. 5045.36
sing boards made out of 2mm aluminium sheet; size
x 60cms. rectangle as as per the design of IRC-67-
1977 pre treated with phospheting process & acid
etching; coated with one coat of epoxy primer and two
coats of best quality epoxy paint; reflectorised with
retro refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of 50 x 50 x
5mm painted with best quality epoxy coatings in black
and white bends. the details of symbol or inscription /
numerals for each board shall be as per the instruction
of engineer in charge. The fixing at site shall be in 1:2:4
CC block of size 45 x 45 x 60cms. for each leg.
18 Direction sign (Junction board):-Providing and fixing 4.00 Nos. 14831.71
sing boards made out of 2mm aluminium sheet; size
244 x 122cms. rectangle as as per the design of IRC-
67-1977 pre treated with phospheting process & acid
etching; coated with one coat of epoxy primer and two
coats of best quality epoxy paint; reflectorised with
retro refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
fabricated from suitable size iron angle of 50 x
x5mm 75x75x6mm as required; painted with best
quality epoxy coatings in black and white bends. the
details of symbol or inscription / numerals for each
board shall be as per the instruction of engineer in
charge. The fixing at site shall be in 1:2:4 CC block of
size 45 x 45 x 60cms. for each leg. including
excavation curing etc. complete under the supervision
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should
Be written in figures and words) of the estimated rate mentioned above Amount of my / our
tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
Net Rs. …………………….… Total Rs. ………….…….................
In words ………………….……………………………. In words ………………….……………………….
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works
directed by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where the reisa change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
Deputy Executive Engineer Executive Engineer
Panchayat ( R & B) Sub Division Panchayat (R & B) Division
Vansda Navsari
Signature of the contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Chapaldhara Halpativas.pdf
SBD Chapaldhara Halpativas.pdf
Specification Chapaldhara Halpativas.pdf
Download all tender documents and submit your bid