Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹1.4 L+₹4,668 (3.50%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹1.4 L+₹5,668 (4.25%)Rejected-AOC E 4698 SECTOR 11 RAJA JI PURAM E BLOCK SECTOR 11 RAJA JI PURAM RAJA JI PURAM LUCKNOW UTTAR PRADESH 226017 | LUCKNOW | UTTAR PRADESH | 226017 | L3 | Rejected-AOC L3 Bidder | |
| 4 | L4₹1.4 L+₹9,480 (7.11%)Rejected-AOC C 234 STREET NO 9 BHAJAN PURA DELHI DELHI 110053 | NORTH EAST DELHI | DELHI | 110053 | L4 | Rejected-AOC L4 Bidder | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 L
EMD Value
₹2,000
Closing Date
28 May 2021, 4:00 pmClosed
SE ETC I, Lucknow
Pareshan Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow
Work of repair, maintenance and overhauling of 2.0 ton capacity split AC installed at 220 KV Substation Hardoi Road under ETD I, Lucknow
2021_UPTCL_585044_1
Short term e-tender 09/2021-22
Open Tender
Electrical Works
Piece-work
30 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹2,000
8 Jul 2021
30 Apr 2021
29 May 2021
30 Apr 2021
28 May 2021
30 Apr 2021
Amount
Following Works are to be done at 220 K.V. Hardoi road under E.T.D- I, Lucknow for Repair, Maintenance, Refilling of Gas and Overhauling of 2.0 Ton Split Air Conditioners and other associated works with all cost of men, materials and T&P for satisfactory completion of the work including Cost of Transportation to repair shop as needed :
220 KV S/S Hardoi Road (18 Nos.) :
I) Replacement of Compressor of suitable capacity & specification including full charging with Refrigerant Gas and checking & arresting of Gas leakage if any.
2) Topping up of Refrigerant Gas.
3) Replacement of PCB complete in all respect.
4) Replacement of Running Capacitor.
5) Replacement of Indoor Fan Motor.
6) Replacement of outdoor Copper Pipe Insulation
7) Replacement of Damage Outdoor Copper Pipe .
8) Replacement of Outdoor Fan Motor.
9) Repairing of 5 KVA Stabilizer (Marc make) for 2.0 Ton capacity A.C. including replacement of parts as needed.
10) Servicing & Maintenance of 18 No. 2.0 Ton capacity Split Air Conditioners. 2 times per season at an interval of 3 months (1 job = servicing of 1 no. 2 T A.C. For one time)
M/S DINESH KUMAR
COMFORT AIR SOLUTIONS
VSAVE ELECTRONICS PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .