Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC LION TOWER PLOT NO 97 ELEGANT ESTATE BAIRAGARH CHICHLI KOLAR ROAD BHOPAL M P | BHOPAL | MADHYA PRADESH | ₹1.3 Cr | L1 | Accepted-AOC Being Lowest Bidder |
| 2 | L2₹2.5 Cr+₹1.2 Cr (85.3%)Rejected-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹2.5 Cr+₹1.2 Cr (85.3%) | L2 | Rejected-Finance Not Lowest Bidder. |
| 3 | L3₹2.6 Cr+₹1.2 Cr (92.3%)Rejected-Finance | ₹2.6 Cr+₹1.2 Cr (92.3%) | L3 | Rejected-Finance Not Lowest Bidder. |
| 4 | L4₹2.8 Cr+₹1.4 Cr (107.0%)Rejected-Finance N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | ₹2.8 Cr+₹1.4 Cr (107.0%) | L4 | Rejected-Finance Not Lowest Bidder. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Does NOT Meets technical Criteria as per Clause No. 1.8.5, 3.2.4 (ii), 3.2.4 (iii) of LoI of RFP and NOT found responsive |
Tender Value
Refer Docs
EMD Value
₹6.3 L
Closing Date
25 Jun 2022, 12:00 pmClosed
Chief Engineer Project Vijayak
HQ CE (P) Vijayak, C/o 56 APO PIN 931721
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities for Construction of Two lane Highway Tunnel including approaches across Hamboting La, in the Union Territory of Ladakh
2022_BRO_517491_1
CE (P) VJK/01/2022-23
Open Tender
Civil Works
Item Rate
365 days
Across Hamboting La on Kargil-Dumgil-Khaltsi Rd
As per TD and RFP, Technical evaluation will be carried out through INFRACON
9 documents required · 9 mandatory
₹0
₹6.3 L
Yes
HQ CE (P) Vijayak, Kargil
5 Sept 2022
11 Apr 2022
27 Jun 2022
12 Apr 2022
25 Jun 2022
26 Apr 2022
13 Apr 2022 - 20 Apr 2022
25 Apr 2022
Amount
Schedule A (Fixed Lumpsum Cost)
Remuneration for Local/ Expatriate Staff (includingper diem allowance)
KEY PROFESSIONALS (Team Leader Cum Senior Tunnel Expert -1 no, Tunnel Design Expert -1 no, Senior Ventilation & Fire Safety Expert-1 no, Senior Geotechnical Engineer -1 no and Directional Coring Expert -1 no)
OTHER PROFESSIONALS (Senior E&M Engineer, Senior Geologist, Senior Surveyor Engineer (2 Nos.), Environmental Engineer, Material Engineer, Highway cum Pavement Engineer and Quantity Surveyor /Documentation Officer)
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment, Minimum 6 to be deployed) TBN
Support Staff (Fixed Rates) (Office Manager-1 Nos, Typist -2 Nos, Office Boy -2 Nos and Night Watchman -2 Nos)
Transportation (Fixed costs) The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs) The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs) Office supplies, Drafting Supplies, Computer Running Cost and Domestic and International Communication.
Office Furniture and Equipment (Fixed costs)
Topographical Survey and Investigation : All investigations/ surveys including Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/ Studies.
Land Acquisition Team including support staff and logistics/ transportation : (Land acquisition Team including support staff, Ex-Land Revenue Inspector /Officer or equivalent, Ex-Kanoogo/ Girdwaror equivalent, Ex-Patwari or equivalent, Typist (2 Nos) & Peon)
Logistics for Land Acquisition Team (Logistics for Land acquisition Team, Computer including necessary peripherals (2Nos), Printers (2 Nos) & Vehicles )
Schedule B (Item rate costs)
Sub-soil Investigation & Other Works The rate includes transportation of all plant, manpower, drilling accessories, sampling equipment work site, erection on site for Coring (Soildrilling testing and rock coring), trial pit , hand auguring, reinstatement of borehole etc including grouting in zones of weakness
Vertical Boring in all type of soils (other than hard rock)
Vertical Boring in hard rock
Directional coring Inclined soil, artificial hard material or boulder drilling and directional coring in rock arterial hard material or boulder from the launch site at ground level to the commencement of the HDC trajectory. (Length reckoned from commencement of HDC trajectory) The rate includes transportation of all plant, manpower, drilling accessories, sampling equipment work site, erection on site for Horizontal Directional Coring (Soil drilling testing and rock coring), trial pit , hand auguring, reinstatement of borehole etc including grouting in zones of weakness
Not exceeding 100 m in length
Exceeding 100m in length but not exceeding 200m length in rock
Reports and Document
Monthly Report
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
RITES Limited
Introsoft Solutions
ARKITECHNO Consultants (India) Pvt. Ltd.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .