| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC BIJURI DISTRICT ANUPPUR M P | BIJURI | ANUPPUR | MADHYA PRADESH | ₹9.4 L Quoted ₹8.0 L | L1 | Accepted-AOC L1 bidder Accepted |
| 2 | L2₹8.4 LRejected-Finance AMBIKAPUR DISTRICT AMBIKAPUR C G | AMBIKAPUR | AMBIKAPUR | CHHATTISGARH | ₹8.4 L | L2 | Rejected-Finance L1 Bidder Accepted |
| 3 | L3₹8.4 LRejected-Finance DOLA ANUPPUR M P | ₹8.4 L | L3 | Rejected-Finance L1 Bidder Accepted |
Tender Value
₹9.2 L
EMD Value
₹11,500
Closing Date
18 Feb 2026, 5:00 pmClosed
SAM,JKD SUB AREA, AHQ Hasdeo Area
Office of the Area General Manager, Hasdeo Area
Laying of 4 inch dia pipe line for dewatering 24LS and 28LS LHCM Panel of seam C at Kurja UG Mine of Hasdeo Area.
2026_SECL_352429_1
AGM /HSD /GM(O) /e-Tender /25-26 /85 Date 05/02/2026
Open Tender
Civil Works - Others
180 days
SECL Hasdeo Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,500
23 Mar 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
18 Feb 2026
6 Feb 2026
5 Feb 2026 - 11 Feb 2026
Malma cleaning, removal of debris from galleries, sump and stacking within 50m lead
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
Transportation of pipe from surface to UG or one district to another district in UG at lead 100m (a) Loading the pipe into trolley, tightening and pushing the loaded trolley and transportation of pipe upto end of track of 1000m length (4') (b) Dismantling the pipe from old workings, trasportation the same and stacking at the end of track at about 100m lead (4"dia) (c) Transportation of pipe from the track end , laying and installation of pipe at about 100m lead from the track (4"dia)
PCC work in UG including centering + shuttering (1:2:4) etc.
Loading of material in tubs at incline mouth (all items of building materials)
Pushing tub to 30m(distance 1220m) and after 30m (distance 40m)
Unloading of all kinds of building materials at destination UG
Lead for transportation of materials by manual labour upto 75m
Metalchips
Cement
Total Impact of GST for the Purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.58 MB
BOQ_365221.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid