Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.6 Cr
EMD Value
₹1.5 L
Closing Date
24 Aug 2026, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CM (YG Mistri) , SAO (HRG) Township
Annual rate contract(ARC) for rendering health, sanitation and other Misc. services in GNFC’s residential Township and Angareshwar Guest House area
333106
GNFC/TAO/SANITATION/ARC/2026
Open
Sanitory Work
Works
Bharuch
₹1.5 L
11 Aug 2026
11 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
120 days
The quantity indicated against each item in the Schedule of Rates is only tentative
and is likely to increase/decrease to any extent during the contractand the Company
shall not be obliged to entertain any complaint or claim what-so-ever in this regard
from the Contractor.
The quantum of work/job would vary/fluctuate depending upon the market
requirements/ demands from time to time. The Company reserves its right not to
operate at all or partially operate any of the items of work listed in theschedule of
Rates during the Contract and the company shall not be obliged to entertain any
complaint or claim what-so-ever in this regard from the contractor.
6. PAYMENT TERMS:
6.1 On satisfactory completion of the work, the contractor shall prepare andsubmit
bill in duplicate along with all relevant and supporting papers forthe respective
month to the Engineer-in-charge / Officer-in-charge of the work. The payment
of the bills shall be made on monthly basis by NEFT/RTGS after usual
deduction of applicable taxes and other dues as per the rules.
6.2 The bill will be paid within 30 days provided the same is complete in all respects.
Such payment shall be made after completion of the calendarmonth and after
submission of a certificate from the Officer-in-charge duly recommended by him
to the effect that the work carried out by the contractor during the month is as
per the contractual obligations and to the entire satisfaction.
6.3 The payment of running bills/final bill by the Company shall not have any
linkage with the payment of wages and other dues to be made by the
contractor to his deployed manpower. In other words, the contractor shall
discharge from time to time his liabilities for payment of wages and other dues
to his deployed manpower irrespective of receipt of payment of running
bills/final bill from the Company.
6.4 The final bill should be submitted along with documents such as "No Objection
Certificate" from our HR and Security Departments and No Claim Certificate
6.5 The payment towards the Final Bill will be released after 90 days of submission
of the Final Bill / Completion of the defect liability period.
6.6 In case the Contractor abandons the site during the currency of the contract,
no payment what-so-ever shall be released even for the partial work that might
have been done by the Contractor. The company shall have also right to forfeit
the amount of Retention Money & Security Deposit.
7. TAXES AND DUTIES:
Bidder to clearly mention all applicable taxes and duties in Schedule of Rates, on
supply of goods and / or services to be made.
8. SECURITY DEPOSIT :
In the event of award of Contract, the successful Bidder will submit Security Deposit
Bank Guarantee (SDBG) @ 7% of contract value in form of SDBG in the form either
a Demand Draft in the favor of the Company, payable at Bharuch or in the form of
one Single Bank Guarantee inprescribed format of GNFC from Nationalized Bank
only and / or Bank approved by GNFC, which shall be valid till faithful execution of
contract plus 3 months claim period for an amount equivalent to 7 % of total contract
value including taxes and duties). Contractor shall furnish Bank Guarantee(BG) in
GNFC’s standard ready-made format only, within 04 (four) weeks from the date of
issue of Work Order/ detailed Contract.
Security Deposit/ Bank Guarantee shall be released after upon satisfactory
performance of the contract and completion of the defect liability period. In case
extension is granted the Contractor shall accordingly furnish SDBG forfurther period
9. SUB CONTRACTING:
The Contractor shall not assign or transfer whole or part of the contract awarded, or
whole or part of works, services, obligations, responsibilities, liabilities and rights or
give a sub-contract for carrying out all or any of the work, service, obligation,
responsibility, liability and right, to any other personor party without Company’s prior
written consent.
10. ALTERATION IN SCOPE OF WORK:
The Company may at any time(s) before or after the commencement of the work by
notice in writing issued to the Contractor, alter the scope of work byincreasing or
reducing the jobs required to be done by the Contractor or by adding thereto or
omitting there from any specific jobs or operations or by substituting any existing jobs
or operations with other jobs and/or operations, or by requiring the Contractor to
perform any extra works in or about the jobsite. And upon receipt of such notice the
Contractor shall execute the job(s)as required within the altered scope of work.
11. PERFORMANCE OF THE CONTRACT:
11.1 The Contractor shall arrange to deploy adequate manpower withrequired skill
& experience to execute the job smoothly, safely & as perthe schedule &/or
11.2 The Contractor shall deploy supervisor/s for (i) to coordinate with Engineer-in-
Charge / Officer-in-Charge for job execution (ii) assignment of the job & to pass
on instructions to the manpower deployed by the contractor for execution of
job (iii) effective supervision of the job (iv) toensure that manpower deployed
by the contractor are carrying out thejob safely, using proper safety appliances
/ wearing proper Personal Protection Equipment, maintaining peace &
discipline & observing safety & security regulations & instructions. (v) to
ensure that manpower deployed by the contractor are not tampering with or
operating any machinery / equipment of the plant.
11.3 The manpower deployed should be engaged for the specific work under the
contract & should not be deployed in other jobs.
11.4 The Company shall have a right to terminate the contract / to split the job / to
get done the work from another agency at the risk & cost of thecontractor, if
not deploying adequate manpower / not carrying out the job as per time
schedule / any job is not properly done.
11.5 The contractor shall keep & maintain area neat & clean all the time.
12. CANCELLATION OF CONTRACT:
12.1 The Company shall be entitled at any time at its discretion to cancel theContract
if, in the opinion of the Company, the cessation of the work has become
necessary owing to any cause, what so ever.
12.2 The Contractor shall not be entitled for any compensation, whatsoever, in
addition to the payment for the work actually performed by the Contractor,
calculated on the basis of the Schedule of Rates.
13.1 The Contractor shall at all times indemnify and keep indemnified the Company
and its officers, servants and agents from and against all third party claims
whatsoever (including but not limited to property loss and damage personal
accident, injury or death of/to property or personof any Sub-Contractor and/or
the servants or agents of the Contractor, and Sub-Contractor(s) and/or the
Company) and the Contractor shall at his own cost and initiative at all times
hereof take out and maintain insurance policies in respect of all insurable
liabilities under Employee’s Compensations Act 1923 and all other applicable
labour laws, includingbut not limited to third party insurance and Act. Personal
injuries insurance Act, etc.
13.2 The Contractor shall also at all times indemnify and keep indemnified the
Company and its officers / employee of the company including Engineer-in-
Charge/ Officer-in-charge against all actions, proceedings, claims, demands,
cost & expenses whatsoever arising due to failure of the contractor in the
performance of his obligations under the contract.
13.3 The Company shall not be liable for or in respect of any demands or
compensation payable under any law in respect of or in consequence of any
accident or injury to any workman or other person in theemployment of
the contractor or his sub-contractor and the Contractorshall indemnify & keep
indemnified the Company against all such damage and compensation and
against claims, demands, proceedings, costs, charges & expenses whatsoever
in respect thereof or in relationthereto.
14. PENALTY FOR DELAY/ DEFAULT:
A. FOR DELAY IN STARTING THE JOB: The contractor must mobilize his team
as per the contract time limit and no mobilizing time shall be permitted.
B. FOR NON COMPLIANCE OF SAFETY RULES: The penalty shall be imposed
for non-compliance as under:
Non wearing of safety shoes: Rs.100.00 per incident per
C. FOR POOR WORKMANSHIP: As decided by Engineer-in Charge / Office-in-
charge including no payment of claim shall be paid to the contractor.
15. SUSPENSION OF CONTRACT:
In appropriate case, the Company may at its discretion, instead of terminating
contract for breach of any terms or conditions by Contractor, suspend the contract
for specified period. In case the contract is so suspended, Contractor will be under
obligation to reimburse the Company for damages or loss suffered by the Company
on account of Company making alternative arrangement during period of suspension
of contract andif the Contractor fails to reimburse such loss or damages, the same
will be recovered from the Security Deposit or any other payment to be made to the
Contractor under the contract with the Company.
16. TERMINATION
Company may, without prejudice to any other remedy for breach of contract, by
written notice of 30 days of default sent to the Contractor,terminate the Contract in
whole or in part if the Contractor fails to perform any other obligation(s) under the
16.1 If the Contractor goes bankrupt or goes into liquidation.
16.2 In the event of termination of contract by the Company on account of breach
of any terms and conditions of the contract by the Contractor the entire Security
Deposit Bank Guarantee given by the Contractor willliable to be forfeited.
16.3 The Company may at its discretion, terminate the contract by giving a notice
of 30 days, for convince, at any time, without assigning any reasons,
17. PAYMENT UPON TERMINATION :
If the Contract is terminated because of a breach of Contract by theContractor, the
Company shall process payments due to Contractor less allrequired deductions. If
the total amount due to Company exceeds any payment due to the Contractor, the
the total amount due to Company exceeds any payment due to the Contractor, the
difference shall be a debt payable by Contractor to the Company and the same may
be recovered from Security Deposit and/ or any other dues payable by the Company
to the Contractor.
18. DEFECT LIABILITY PERIOD AND LATENT DEFECTS :
Defect liability period shall not be applicable to this contract.
19. GOVERNMENT REGULATIONS:
The Contractor shall comply with and ensure strict compliance by his / its sub-
contractors, servants and agents of all applicable Central, State, Municipal and
Local Laws and regulation / notifications of any Central, Stateor Local bodies and
authorities and undertakes to indemnify the Company from and against and levies,
damages, penalties and payments whatsoeveras may be imposed by reason of any
breach or violation of any law, rule or regulation whatsoever and all actions, claims
and demands arising there from and / or relative thereto.
GNFC strongly opposes sexual harassment and any such behavior against women
is prohibited by the law as set down in “The Sexual Harassment of Women at
Workplace (prevention, prohibition and Redressal) Act, 2013” and Rules framed
there under being The Sexual Harassment of Women at Work Place Rules.
You shall ensure compliance of Gujarat Professional Tax Act, 1976 and required to
deduct Professional Tax as applicable from the wages to be paidto your workers &
required to deposit the same to the appropriate authority.
20. COMPLIANCE WITH LABOUR & SAFETY REGULATIONS:
During the continuance of the Contract, the Contractor shall abide at all times by all
existing labour enactments and rules made there under, such asMinimum Wages
Act, E.P.F Act. etc., regulations, notifications and bye laws of the State or Central
Government or local authority and any other labour law (including rules), regulations,
bye laws that are in force or may be passed or notification that may be issued under
any labour laws in future either by the State or the Central Government or the local
authority. The Contractor shall keep the Company indemnified against and/or on
account of contravention of any of the provisions of any Act or rules made there
under,regulations or notifications including amendments.
If the Company is caused to pay or reimburse, such amounts as may be necessary
to cause or observe, or for non-observance of the provisions stipulated in the
notifications/bye laws/Acts/ Rules/ regulations including amendments, if any, on the
part of the Contractor, Company shall have theright to deduct all such sums from any
money due to the Contractor includinghis amount of security. The Company shall
also have right to recover from the Contractor any sum required or estimated to be
required for making theloss or damage suffered by the Company. The employees of
the Contractorin no case shall be treated as the employees of the Company at any
21. FORCE MAJEURE:
In the event that performance under the Contract, in the reasonable opinionof either
party (Company & Contractor) is made impossible by force majeure like war,
hostilities, revolution, civil commotion, strike, epidemic, accident, wind, fire, flood, or
because of any law, order, proclamation, regulation or ordinance of any
Government, or of any subdivision thereof or because of any act of God, quarantine
restrictions, epidemics, etc. then either party shall so notify the other in writing. If such
force majeure circumstances continue for more than three months then either party
may terminate the Contract, or complete performance of the Contract with such
adjustments as are requiredby the existence of the force majeure and are agreed
upon by the parties.
22. DISPUTE RESOLUTION:
22.1 All disputes or difference(s) whatsoever which shall at any time arise between
the parties hereto touching or concerning the works or the execution or
maintenance thereof of this Agreement/ Contract/ Work Order/ Purchase
Order/ Service Order or the rights touching or concerning the works or the
execution or maintenance thereof of this Agreement/ Contract/ Work Order/
Purchase Order/ Service Order, of the construction meaning operation or
effect thereof or to the rights, liabilities of the parties or arising out of or in
relation thereto whether during or after completion of the Agreement/ Contract/
Work Order/ Purchase Order/ Service Order or whether before or after
determination, foreclosure or breach of the Agreement/ Contract/ WorkOrder/
Purchase Order/ Service Order, shall be referred by the disputing Party, in
writing to the other Party, within 30 days of occurrence of such event, to resolve
any such dispute or difference.
22.2 If such dispute mentioned above is not resolved amicably by direct informal
negotiation, within a period of 30 days, then such dispute/ difference shall be
referred to the Engineer-In-Charge/ Additional General Manager of the
concerned department of GNFC. Engineer-In- Charge/ Additional General
Manager shall give its decision within 30 days of the reference of the dispute
22.3 If any Party serves an Arbitration Notice in respect of any dispute to the
Appointing Authority, the dispute shall be finally settled by arbitration under
the Indian Arbitration and Conciliation Act, 1996 (“Act”) and all statutory
amendments, modifications thereof and the rules made there under, or any
other corresponding law for the time being in force, by theSole Arbitrator to be
appointed as hereinafter provided.
22.4 Within 30 days of receipt of Arbitration Notice, the Appointing Authorityshall
appoint the Sole Arbitrator, who shall be a retired employee of GNFC, not
below the rank of General Manager and who shall be qualified to be appointed
as an Arbitrator under the law in force at the relevant time.
22.5 The provisions of the Indian Arbitration Act, 1996 and all statutory enactments
and modifications thereof and rules made there under shall apply.
22.6 The Arbitration proceedings shall be conducted in English and the venue and
seat of the Arbitration proceedings shall be at Bharuch and the Courts at
Bharuch shall have exclusive jurisdiction.
22.7 The governing substantive law shall be Indian laws.
23. LABOUR LAWS AND REGULATION:
23.1 The Contractor shall be responsible for strict compliance of and shall ensure
strict compliance by it sub-Contractors, servants or agents of all labour and
other laws, rules or regulation having the force of law affecting the relationship
of employer and employee between theContractor/Sub-Contractor and their
respective employees.
23.2 The Contractor has to comply with all applicable Labour Laws.
23.3 The Contractor and Sub-Contractor(s) of the Contractor shall obtain
authority(ies) designated in this behalf under any applicable law, rule or
regulation including but not limited to the Factories Act, ESI Act, Employees
Compensation Act and Contract labour (Abolition & Regulation) Act,
(insofar as applicable) any and all such license(s) consent(s), registration(s)
and / or other authorisation (s) as shall from time to time be or become
necessary for relative to the execution of the work or any part or portion thereof
or otherwise in connection with performance of the Contract, and shall at all
times observe and ensure due observance by the Sub-Contractor, servants
and agents of all terms and conditions of the said license(s), regulation(s)
and other authorisation(s) and laws, rules and regulationsapplicable thereto.
23.4 Nothing in the Contract document stated shall anywise constitute any
workman/ employee of the Contractor or any Sub-Contractor as or to be
workman/ employee of the Company, or place obligation or liabilityin respect
of any such workman/ employee upon the Company.
23.5 Without prejudice to any other liabilities or obligation of the Contractorrelative
to Sub-Contractors in terms hereof or otherwise, the Contractorshall indemnify
and keep indemnified the Company from and against all actions, claims,
demands and liabilities whatsoever under and in respect of the breach of any
other provisions and / or against any claim,action or demand by any workman /
employee of the Contractor or any Sub-Contractor and / or from any liability
anywise to any workman / employee of the Contractor or any Sub-Contractor
under any law, rule or regulation having the force of law, including but not
limited to claimsagainst the Company under the Employee’s Compensations
Act, 1923,The Employees Provident Funds Act, 1952, and/ or The Contract
Labour (abolition & Regulation) Act,
24. SAFETY REGULATION, ACCIDENT AND DAMAGE:
24.1 The Contractor shall be responsible at his own cost in and relative to
performance of the work and Contractor to observe and to ensure observance
by his Sub-Contractors, agents and servants of the provisions of Safety Code
as hereinafter appearing and all fire, Safetyand Security regulations as may
be prescribed by the Company from time to time and such other Precautions,
measures as shall be necessary.
24.2 All necessary personal safety / protection equipment as considered adequate
by the Engineer- in-Charge / Officer- in-Charge should be made available for
the use to deployed manpower on the site and maintained in a condition
suitable for immediate use and the Contractor should take adequate steps /
monitor continuously for proper use of such equipment’s by those concerned.
24.3 The contractor shall submit immediately in writing about accidents occurred
during the work execution to Company’s Fire & Safety and HR deptt. under
intimation to Engineer- in-Charge / Officer- in-Charge.
25. SECURITY REGULATIONS:
25.1 The contractor shall ensure for strict compliance with the security regulations
/ directives of the Company & shall also ensure that the manpower deployed
follows the rules during Entry / Exit as well as while they are in the Company
premises. All the deployed manpower shall prominently display the Entry Cards
while they are in the premises of the Company.
25.2 If the Company finds any person / persons deployed by the contractorto be
undesirable the contractor shall immediately withdraw such
person / persons and substitute him / them. The decision of the Company for undesirability
of the persons deployed by the contractor shall be final and binding on the contractor.
26. QMS, EMS, OHSMS & EnMS COMPLIANCE:
The Company is certified for Quality Management Systems, Environment Management
System, Occupational Health & Safety Management System and Energy Management
System. All the persons (including Contractors, Supervisors & their workers) working at GNFC
or on behalf of GNFC are required to comply with the QEHSEn guidelines in addition to other
applicable labour laws, safety laws as well as legal compliances.
27. OTHER TERMS:
GNFC reserves its right to enter into parallel Contract/s with other Bidders.
In case, if contract is awarded and bidder fails to execute the same in line with Conditions of
Contract given in the contract, GNFC reserves its right tosource such services from any other
source and extra financial implication, ifany, shall be to the defaulting Contractor’s risk and cost.
28. GENERAL CONDITIONS OF CONTRACT:
All other terms conditions, not covered to the extent as provided above and in Annexure
attached hereto shall be as per General Conditions of Contract(GCC) attached and marked as
Annexure – V, which is an integral part of this tender document.
29. GENERAL OBLIGATIONS OF THE CONTRACTOR:
29.1 The Contractor shall deploy suitably qualified and experienced manpower in adequate
numbers to carry out the job as per the scope of work efficiently, safely & systematically
depending upon the requirement of the Company from time to time.
29.2 The Contractor shall deploy only such persons:
a) who are above the age of 18 (eighteen) years and below theage of 60 (sixty)
b) who are physically sound, well behaved, trustworthy and competent
c) who are medically fit, with proper eye sight (with or without glasses).
d) who can read and write Gujarati / Hindi.
e) who have clean habits and are teetotalers.
f) Who have no criminal record & have authentic ID & birth date proofs.
29.3 The Contractor shall deploy Supervisors in adequate numbers toorganize job related
activities, supervise closely the job to be carried out by his deployed manpower as well
as to ensure their safety &security. The contractor / supervisor shall obtain details of
jobs to be carried out from Engineer-in-Charge / Officer-in-Charge & shall updateprogress
of jobs to concern.
29.4 The Contractor shall solely and exclusively responsible for engaging and employing the
persons for execution of this contract. The company shall have no liability whatsoever
concerning workers. The Contractor shall indemnify the company against all losses or
damages or liabilities arising out of or in course employing person or out of their
29.5 The Contractor shall be responsible and liable for payment of salaries, wages & other
lawful dues of his personnel as EMPLOYER. The Contractor shall maintain proper books,
accounts, records & documents and comply with all statutory rules & regulations
applicableto the Employer as CONTRACTOR.
29.6 The Contractor shall make payment of wages and other dues to his personnel on
scheduled date but not later than 10th of each calendar month. The Contractor shall also
certify that all personnel employed have been paid the minimum wages as prescribed by
the Governmentand all other laws are complied with and that there is no violation of any
applicable laws and no case of litigation is instituted or pending beforeany authorities.
29.7 The Contractor shall disburse the monthly wages to his personnel deployed at our site
through bank only, disbursement of wages in cashshall be not be allowed in any case.
The Contractor shall submit soft copy of file containing full name of worker, his bank
account no. and name of bank & branch as well as PF account / UAN no., before first
wage disbursement to operating department & HR department.
29.8 The Company shall be entitled to deduct directly from the bills to be paid to the contractor
any sum payable by him and which sum/sums the Company is required to pay as
Principal Employer on account of contractor’s default in respect of all liabilities referred to
in above clauses and loss, damage etc. suffered by the Company due to contractor’s
29.9 The successful contractor shall arrange (i) to Submit Labour License before
commencement of work (ii) to get verified the wage sheet from HR Dept. before
disbursement of wages and ensure wage disbursement through Bank on the schedule
date notified by HR dept, (iii) to submit copy of wage sheet along with bankletter showing
transfer of wages as well as PF challan along with ECR before 20th of every month (iv) to
execute agreement on stamp paperfor wage disbursement through bank.
29.10 The contractor shall provide in writing the list of persons to be deployed by him to
Security department of the Company in prescribedformat for allowing them to enter in to
Co.’s premises to carry out subject job. The contractor shall also collect the ID Proof, Date
of Birth proof, Present & Permanent address proof, emergency contact nos. and shall
maintain the proper record.
29.11 On expiry of the validity of the Contract or in the event of the company terminating the
contract prematurely, the contractor shall ensure that all the entry passes issued to his
workers are collected back and deposited with the Security Department. The Contractor
shallbe solely responsible for misuse of any of the entry pass issued to his workers and
the final payment if any, applicable shall be made after confirmation of the Security
department to that effect.
29.12 The contractor shall obtain License for deployment of workers from the appropriate
authorities & also get insured them under ESIC policy as per the provisions of laws and
shall submit copies thereof to the Company.
29.13 All tools & tackles, safety items etc. which are required to carry out the work safely
shall be arranged by you as & when required, except where some special tools & tackles
are being provided by the Company.
29.14 The Contractor shall provide free of charge all required safety equipment / Personal
Protection Equipment to the deployed manpower & ensure that they use the same while
carrying out the job. If requiredfor specific job, the contractor shall approach Engineer in-
charge / Officer in-charge for special tools/ tackles and safety appliances if required. Any
loss or damage to the specialized tools and tackles provided by the Company to the
contractor due to deliberate ornegligence of the deployed manpower shall be recovered
from the payment due to contractor at the rate as decided by the Company.
29.15 All safety precautions while executing the contract shall be strictly observed by the
contractor. Corrective measures as penalty for non - compliance and eventual termination
of contract followed by de- registration, as approved contractors / vendors are the
consequences of repeated non - compliance and negligence.
29.16 Company is committed to safety of all the persons working inside the factory, including
contractors/agencies/their supervisors /workers / sub-contractors / agents, etc. Health &
Safety Policy of GNFC is enclosed herewith at Annexure–‘VII’ which demonstrates
GNFC's strong commitment to safety. In this regard, the Company shall be imparting
necessary job related training. The Contractor shall be required to spare the deployed
manpower to participate in such program.
29.17 The Company is certified for Environment, Occupational Health & Safety, & Quality
Management System, under which there are good number of legal and other
requirements to be fulfilled. In this regard, the Company shall be imparting necessary job
related training. The Contractor shall be required to spare the deployed manpower to
participate in such program. We enclose herewith a copy of Integrated Management
System Policy of the Company as well as QEHSEn Guidelines to Contractors at Annexure–
‘VIII’ & Annexure–‘IX’.
29.18 The Contractor shall be fully liable for any delay, loss or injury caused directly or
indirectly by any act or omission on the part of his labourers, agents or persons. In case,
if any damage, loss or injury is caused, the Contractor shall be liable to compensate for
the same as per the decision of GNFC, which shall be final and binding.
29.19 Company, however, reserves its right to terminate the contract prematurely without
giving any notice or any compensation whatsoever, in case of failure by the contractor to
discharge the jobs under the scope of the subject contract to the satisfaction of the
Company or in case of misbehavior/indiscipline on the part of the Contractor himself for
his labourers or agents or persons. The decision of the Engineer-in-charge / Officer-in-
charge of the Company in this regard shall be final and binding upon the contractor.
29.20 In case the contractor fails to discharge his obligations in time, thenthe Company shall
get the services of other contractor/agency at contractor’s risk and cost. The expense
towards this shall be recovered from the contractor. The decision of the Company shall
be final in this regard.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
RFP.pdf
Annexure I - General Instructions.pdf
Annexure II - Special Conditions of tender.pdf
Annexure III - Scope of Work.pdf
Annexure IV - Other Terms and Conditions.pdf
Annexure V-GCC.pdf
Annexure VI - Conditions of Labour Laws.pdf
Annexure VII - Safety and Health Policy English.pdf
Annexure VIII Integrated Management System Policy.pdf
Annexure IX - QEHSEn GUIDELINES TO CONTRACTORS.pdf
Annexure X - Shedule of Work.pdf
Annexure XI - Covering Letter.pdf
Annexure XII - Tender Undertaking Cashless.pdf
Annexure XIII - GST ANNEXURE-20-03-2023.pdf
Guidelines and Formats for NOC.pdf
MSME Annexure.pdf
QEHSEn Guidelines to Contractors.pdf
SDBG.pdf
Undertaking for wage disbursement through Bank.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .