Similar tender results from the same govt authority in the past 3 years.
Superintending Engineer(O&M),Anand
Architectural and Structural Consultancy Services for Construction of GEKC building and surrounding development at RSO Store Campus under Anand Circle office
316789
SE (O&M)/ANC/Civil/GEKC Work
Open
Civil Works
Anand
2 documents required · 2 mandatory
₹590
ANAND
₹5,840
23 Jun 2026
23 Jun 2026
23 Jun 2026
14 Jul 2026
23 Jun 2026
Quotation SCHEDULE - B
Name of Work: Architectural and Structural Consultancy Services for
Construction of GEKC building and surrounding development at RSO Store
Campus under Anand Circle office.
Sr. Description Qty Rate Unit Total
Lump sum firm price for providing Architectural 1 584000 Job
and Structural Consultancy Services for
Construction of GEKC office Building preferably
two separate building of GF +3 or more
interconnected with each other with all the
required facilities i.e. class room for trailing,
conference hall, canteen facility, sports facility,
accommodation facility, administrative offices,
parking, garden, land scrapping etc. having B.A.
approx. 4000 Sq. Meter ( 2000 Sq. Meter Plot
area) (area of construction may
increase/decrease on finalization of drawings by
authority , No payment shall be pay extra on area
increase ) for Construction of GEKC
building and surrounding development
at RSO Store Campus under Anand
Circle office. Price should include all
Architectural & Structural Consultancy Services
Such as preparation of layout in consultation with
MGVCL Authority. Price should include all travel,
living & incidental expenses of site visits of their
personnel, computer / stationary charges etc. All
final drawings should be submitted in three sets
and soft copy also to be given.
Preliminary two/three different Alter Net plan with
furniture layout is to be submitted in consultation
with MGVCL Authority within one months. Base
on the final approved alternate necessary
Architectural plans, elevation & sections to be
prepared and to be modified as per MGVCL
suggestion and requirements to get it finalized.
Necessary Structural design, drawings to be
prepared. Necessary final drawing with structural
certificate for processing permission duly stamp
and requisite number to be given to MGVCL. The
3-D images & drawing of approved layout is to be
Preparation of final Layout Drawing for
requirement and approval as well as
preparation of Estimate (Schedule-B) &
Measurement as per prevailing SOR of R&B
Anand and rate analysis as per latest market
rate for NON-SOR items, technical
specification, etc.
Sing & Seal of Contractor Page 1 of
Min. Seven Visits to be made in consultation with
MGVCL authority as per requirement of the
project and as directed by EIC.
Mode of payment
1. 15% payment shall be made on preparation of
two different alternatives with furniture layout for
area to be developed. This should be submitted
within One Month.
2. Additional 35% payment shall be made on
submission of all detailed drawing including
structural drawing/as well as tentative quantity
rates of final alternate.
3. Additional 20% payment shall be made on
submission of all working drawings & estimate as
per R& B SOR of anand district.
4. Additional 10% payment shall be made on
70% completion of civil work.
5. Balance 20% payment shall be made on
completion of all civil, furniture and electric work.
6. Total project cost considered and nothing
extra will be paid on increase/decrease in project
7. If project will discontinue at any state,
payment up to corresponding level will be paid.
Total Estimated Amount Without GST.
Total Estimated Amount With GST.
(1) The above rates are incl. all taxes but excl. GST. GST at applicable rate will be
reimbursed in actual to the agency only after submission of sufficient proof of such payment
made to the Govt. For claiming refund of GST, agency has to submit invoice in the format
prescribed by the Act.
(2) To prepare the lay out drawing of the area allotted by Government. The necessary
Topography and contour survey with help of Total station shall be carried out by
(3) Preparation of final Layout Drawing for requirement and approval as well as preparation
of Estimate (Schedule-B) & Measurement as per prevailing SOR of R&B Anand and rate
analysis as per latest market rate for NON-SOR items, technical specification, etc.
(4) If required, bar chart and presentation of the project should be submitted.
(5) All estimates and all detailed drawings will be separately submitted like all construction
work, fire, electrical, all signed instructions boards and furniture as per conditions.
Sing & Seal of Contractor Page 2 of
(6) Holding discussion with various agencies and guiding them, who are involved in the
proposed project.
(7) Preparation and submission of All Working Drawings, Fire, Electrical and details of
furniture and all relevant system.
(8) Preparation of Electrical Lay-out plan.
(9) Co-ordination with the Air-Conditioning Agencies for the Placement of split AC
(10) Any Structural modification, if any required, necessary structural details is to be
(2) Time Schedule:-
• Time limit for completion of entire work will be 12 Months or till actual completion of
Architectural and Structural Consultancy Services for Construction of GEKC building
and surrounding development at RSO Store Campus under Anand Circle
office.works, whichever is later for the above cited work.
• You have to submit minimum three alternative layouts within one month considering date of
commencement of work.
Sing & Seal of Contractor Page 3 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Tender Notice.pdf
2. Terms and conditions.pdf
3. Technical Specification with Cement Consumption Schedule.pdf
5. SPECIFICATIONS FOR ELECTRIFICATIONS.pdf
4 .Schudule B.pdf
Download all tender documents and submit your bid