| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹33.5 L+₹7.8 L (30.5%)Rejected-AOC | L2 | Rejected-AOC ok | |
| 3 | L3₹35.8 L+₹10.1 L (39.3%)Rejected-AOC | L3 | Rejected-AOC ok | |
| 4 | Rejected-Technical | - | Rejected-Technical your bid has been rejected as your firm is not enlisted for the required categaory as mentioned in notice of tender for the work | |
| 5 | Rejected-Technical 205 2ND FLOOR VIPUL SQUARE B BLOCK SUSHANT LOK 1 GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | - | Rejected-Technical your bid has been rejected as your firm is not enlisted for the required categaory as mentioned in notice of tender for the work |
Tender Value
Refer Docs
EMD Value
₹66,600
Closing Date
8 Oct 2020, 6:00 pmClosed
GE WEST BAREILLY
GE WEST BAREILLY
REPAIR/MAINT AS AMC OF LAUNDARY PLANT AND COMPREHENSIVE MAINT OF STEAM BOILER AND INCINERATOR AND MISC E/M WORKS AT MILITRY HOSPITAL BAREILLY UNDER GE WEST BAREILLY
2020_MES_376237_1
8865/E8
Open Tender
Civil Works
Item Rate
335 days
GE WEST BAREILLY
SCANNED COPY OF ENLISTMENT LETTER IN MES IN RELEVANT CLASS CATEGORYSCANNED COPY OF APPLICATION ON LETTER HEAD OF FIRM
SCAN COPY OF DD OF RS 500.00 IN FAVOUR OF GE WEST BAREILLY FROM ANY NATIONALISED OR SCHEDULED BANK SCANNED COPY OF REGISTRATION
6 documents required · 6 mandatory
₹500
Yes
GE WEST BAREILLY
₹66,600
Yes
6 Nov 2020
10 Sept 2020
12 Oct 2020
10 Sept 2020
8 Oct 2020
24 Sept 2020
10 Sept 2020 - 23 Sept 2020
Amount
A. Laundry Plant
AMC for 11 months of Laundry Plant make-STEFAB including repair/replacement of major and minor spare parts of the following equipments/machinery, required during AMC without any extra cost to Govt by the OEM of the Laundry plant i.e. STEFAB or equivalent FABTECH Engineering company/or any other manufacturing company of Laundry Machines having CE certified and ISO company. 1. Washer Extractor 30 Kg-05Nos. Model AXS 30 Make:- STEFAB 2. Washer Extractor 60 Kg-02Nos. Model AXS 60 Make:- STEFAB 3. Drying ironer heated chest type Model FS 21 - 01 No Make-STEFAB 4. Industrial Drying Tumbler 60 Kg -03Nos. Model DRS 60 Make:- STEFAB 5. Flat bed press -03 Nos. Make:- STEFAB 6. Vaccum Finishing Table -01No. Make:- STEFAB 7. Air Compressor 5HP- 01No.
Note: - Contractor shall keep the following aspects in mind while quoting unit rates and rates quoted shall be deemed to be involving the following: -
Note:- (i) All above relevant documents must be submitted for approval before entering into AMC with firm. (ii) All defective parts will be replaced by contractor within 48 Hrs as per under mentioned Laundry Plant . Replacement cost of defective parts is to be included in above mentioned AMC Rates. (iii) In order to certify proper maint of the plant , monthly & breakdown visits of Engineer/technician from OEM/Approved firm to check efficient running of Laundry Plant is mandatory on part of contractor.The unit rates quoted by the tenderer shall be deemed to be included this aspect. Necessary documents in support of visit of authorised representatives from OEM/Approved firm shall be submitted by the contractor after each visit. On Failure of visit by OEM/Approved firm representative or non submission of report by him, a panel recovery of Rs 15000/- per visit shall be made from the contractor dues. (v) Contractor shall enter into an agreement with OEM/Approved firm company for AMC and submit to GE (W) Bareilly after acceptance of works within 15 days.
AMC includes monthly visit of qualified and experienced technician/engineer and Inspection, dismantling and taking down the needful items in connection to carry out necessary repair/maintenance of all machines of Laundry Plant and replacement of spares and complete assembling after repair/overhauling, servicing, cleaning and testing so as to make the machine functional in all aspects.
Cost of minor parts such as nuts, bolts,screws, clamps, T&Ps, oiling, greasing, cleaner liquid for steam pipes,GI/SS fittings, V-belts etc, deemed to be included in the quoted rates,Belts of drying ironer,clothes/cover of flat bed press ,rubber hose pipe,V Belts any size and type,main door rubber gasket for washer extractor 30/60kg.,Stainless steel Door lock of washer extractor 30/60Kg. ,servicing and programming setting /resetting of the display card of Laundry Machines,replacement of an type of contactor,display meter,push buttons,deemed to be included in the quoted rates
Hydraulic Shocker, Operating computer ST06, Steam solenoid Valve , Fuse link 4 Amps, Electric buzzer, Door limit switch, motors rewinding , Main bearing set, Water solenoid valve, Drain valve, PU pipe for level , 3 Way water solenoid valve, Motor plate welding, deemed to be included in the quoted rates
Steam radiator, Single phase preventor,Digital temperature controller,Air hose pipe, Air flow control valve, Padding marina wool felt, Knobs ,Solenoid valve, Steam Trap Valve, Pressure Release Valve,power controlling card of VFD, main control command cable for Microsoft in between controller and relay power card ,display card ,deemed to be included in the quoted rates
Cleaning of chocked Steam pipelines and steam trap Valves and welding and replacement of coupling, joints ,union etc if required to stop leakage of water and steam from the pipelines.
All major/minor spare parts required during AMC shall deemed to be included in the quted rate.
The cost of transportation if any required is deemed to be included in the quoted rate.
Contractor must have to ensure the MES & MH rep for the machine functional in all aspects
Opening dismantling and disconnecting all water connection and electrical connection of Drying tumbler capacity of 60Kg make STEFAB and reassemble the same for repair after removing nuts and bolts and replacement of counter bearings Make :- NTN/SKF/ZKL of suitable size with bush & sleeves for drying tumbler 60kg. including Oiling, cleaning, servicing and greasing, balancing and alignment of cylindrical basket, balancing of blower, shaft turning, descaling and servicing of steam radiator for the smooth functioning of the machine complete all as directed.
Opening dismantling and disconnection all water connection, steam connection and electrical conection of washer extractor 30Kg /60Kg make Stefab and taking out the complete machine from the foundation for the repair by removing out the old/broken foundation and grounting and providing new foundation with bolts & PCC mortar complete with all neccessary items and reassamble the same machine after completion of foundation work for the smooth functioning of the machine complete all as specified and directed.
M&L for repair of ducting of Drying Tumbler of Laundry Plant including replacement of unserviceable rusted GI sheet, rusted nut bolts and tightening of nut bolts,Cleaning of ducts , and making of Ducts complete serviceable by welding works if required and making of Ducts as per existing size complete all as specified and directed.
Supply and laying in replacement of MS tubing 15mm bore dia heavy grade 15mm bore dia with necessary fittings such as tees, elbow, Bends unions fixed by welding and threading along Radiator of drying tumbler 60 Kg to drain line and Boiler Including covering with insulator 50mm thick all Around glass wool and cladding with 36 SWG Aluminum sheet complete all as specified and directed.
All as per above item here in before but 25mm Bore dia tubing. Make:- Jindal/Tata/Sail
B. Steam Boiler
Comprehensive maintenance of Steam Boiler of Capacity 600 Kg/Hr- Qty - 02 Nos Make Thermax, Model Revomax RXA-06 for 11 months by the service technician of Thermax limited (OEM of Boiler).
The Comprehensive maintenance Service package covers the following:
Site visit for preventive maint and check up of Steam boiler will be carried out by service technician of THERMAX limited or as recommended by the OEM every month during the contract period. In the visit, technician will check and inspect of both steam boiler plant system complete of capacity 600Kg/Hr Make-Thermax
Contractor must submit the service reports every month from the Service Engineers along with the details of the Repair/maint/replacement of spares/testing of Steam Boilers carried out during Every month during the contractor period. On Failure of visit by OEM/Approved firm representative or non submission of report by him, a panel recovery of Rs 10000/- per visit shall be made from the contractor dues.
Cleaning of chocked coil by descaling steam boiler -02 Nos, if required engineer shall be supervising the descaling activity only with Thermax Descaling Chemical (i.e. Chemical recommended by OEM)
Servicing/repair of all water pumps including replacement of unserviceable seals and glands , and servicing ,greasing /alignment of shaft/testing complete of all motors of both Steam Boilers.
Servicing/repair/testing of electric control panel and replacement of unserviceable minor spares like meter , wiring etc complete of both Steam Boilers.
Contractor must have to ensure the MES & MH rep for the machine functional in all aspects
a) Base operation checks to bring the equipment in optimum condition
b) Scheduled check up visits for general health check up
c) Preventive and predictive maintenance guidance during these visits
d) Performance optimization
e) Break down service support
f) Recommendations for improved performance
g) Service History Mapping
h) Safety Checks
The contractor must ensure the following once the contract period strated:
a) An optimum performance level of Boilers is maintained
b) A consistent service level is delivered
c) Operating parameters to be monitored
d) The above services will result in equipment uptime to be increased
f) Input parameters of the system to be monitored as well as compared
LIST OF SPARES COVERED IN COMPREHENSIVE MAINTENANCE CONTRACT (IF REQUIERED TO BE REPLACED). BOILER MODEL - RXA-06 2 Nos NOTES : If the below items are not replaced during the maintenance period, then such spares shall be handed over to the deptt and to be taken on ledger charge
Ball Bearing (HCA-5)
Rewinding of motor including greasing and replacement of ball bearing
Ball Valve 15mm/20mm
Burner Rod Assembly TXCR
Cable High Tension Wire
Cap for Photocell Mounting (Rubber Cap)
Diffuser Plate-Dia 132mm
Electrode assly
Electrode Cap
Filter Element
Gland Washer (HTN-8)
Hooter Round
Hose Metallic Braided 3/8" x 40"
Ignition Transformer 230V/14.5 KV
Nozze 7.5 GPH, 45 Deg PLP
Oil Seal (HCA-7)
Oil Seal (HTN-5)
Photocel 8205-01 No
Pressure Switch RT-112 SB (LP)
Pressure Switch RT-5 SB (HP)
Pressure Switch PVF-16
Electronic Timer Make-Selec/ Dial/ Nutronic
Pressure Switch PM01
Safety Valve 1"
Thermocouple 0 - 120 Deg,Cent. 63mm Dial
Oil Filter
Valve Non Return 25mm
Valve Seat Assly (HTB-3 To HTB-6)
V-Belt A 56
Sight Glass Dia 50mm
Pressure Gauge 0-25 kg/cm2, D-63mm Con.-1/2"
Pressure Gauge 0-40 ,Dial 4" Bottom Connection 1/2
AQUASOL AE-201 TH
HOSE METALLIC 1" x 1.5MTR LONG (RI09R01011)
Multiport Valve
Hour Meter
Globe Valve Size-25NB, Screwed for Steam
Globe Valve Size-15NB, Screwed for Steam
Max clean for descaling to Coil type Boiler-50 Kg
PH Booster MAXTREAT- 50 Ltrs
Supply ,fix ,installation and testing in replacement of following accessories/control valves & equipment of steam pipeline system/network of Steam Boiler. Specials required will be measured and paid separately under relevant items : Note: The work has to be executed by OEM of Boiler THERMAX limited or as recommended by the OEM and the spares also must be of OEM of Boiler (i.e M/s Thermax Ltd) or as recommended by OEM
Supply & fixing in replacement of Optimiser complete all as specified and directed. Make-Thermax/ ION Exchange/fabtech
Supply & fixing in replacement of Economiser complete all as specified and directed. Make-Thermax/ ION Exchange/fabtech/ Fabtech
Supply & fixing in replacement of Duct Economiser complete all as specified and directed.Make-Thermax/ Fabtech/ Fabcare
Supply & fixing in replacement of Inner Jacket of steam Boiler 600 Kg/Hr complete all as specified and directed. Make-Thermax/ Fabtech
Supply & fixing in replacement of Temperature Controller 0-400 Deg C complete all as specified and directed. Make- Selec/ Nutromic
Supply & fixing in replacement of RTD Assembly PT-100/ 5 Mtr complete all as specified and directed. Make-Thermax/fabtech/ Guru/Sunray
Supply & fixing in replacement of Sequence Controller MA810 complete all as specified and directed. Make-Thermax/ Sunray/ Venten
Supply & fixing in replacement of Photoresistor 8205 complete all as specified and directed. Make- Danfoss/ Sunray/ Venten
Supply & fixing in replacement of Fuel pump AJ6AE Make-Thermax/ Sunray/ Hindustan/fabtech
M & L for Overhauling kit for boilers i.e refactory material, gland rope, hold tight, tape, ceramic for the smooth functiong of the machine complete all as directed.
Supply & fixing in replacement of Water pump-Triplex complete all as specified and directed. Make-Thermax/ Hindustan/Fabtech/SHAKTI
Supply ,fix ,installation and testing in replacement of following accessories/control valves & equipment of steam pipeline system/network of Steam Boiler.
Pipe line MS (C-class) 50mm
Pipe line MS (C-class) 40mm
Pipe line MS (C-class) 25mm
Pipe line MS (C-class) 15mm
Flange 15/20/25mmhole 100mm dia
Flange 40/50mm hole 150mm dia
Dead flanch 100/150mm dia
Bend MS 50mm
Bend MS 40mm
Bend MS 25mm
Bend MS 20mm
Bend MS 15mm
Nipple MS 50mm
Nipple MS 40mm
Nipple MS 25mm
Nipple MS 20mm
Nipple MS 15mm
Socket MS 50mm
Socket MS 40mm
Socket MS 25mm
Socket MS 20mm
Socket MS 15mm
Elbow 50mm
Elbow 25mm
Elbow 20mm
Elbow 15mm
Ball Valve 50 mm
Tee 20mm
Tee 15mm
Hexa Nipple pressure 25mm
Hexa Nipple pressure 15mm
Safety valve with handle 25mm
NRV 40mm
Header 4'x8"
Y Stainer 50mm
Y Stainer 20mm
Y Stainer 15mm
T.D Trap 25mm
T.D Trap 15mm
Botal Trap 20mm
Globe valve 50mm
Saifan Complete 15mm
Saifan for gauge meter 10mm
Socket for saifan
Gasket 4mm
Nuts Bolts
Insulation for pipe line
Resin T-40Na
Crystal salt as per sample for water softner plant.
Maxclean for descaling to Coil type Boilers of Cap. 600Kg/hr. Make:- FABTECH/THERMAX
PH Booster for the water softner plant. Make :- FABTECH/THERMAX/Maxtreat
Material and labor in Preparation for painting of Boilers (Model RXA-06) accessories, connected items i.e Boilers outer shell, moisture separator, Chimney, flue gas duct, main header for flue gas, other MS/ Aluminium structure, MS pipe, main chimney of height 10 mtr, LT panel board other E/M eqpts etc removing old paint by scraping with scrap paper, sand paper & help of blower, complete including M&L for applying two coat of super enamel synthetic heat resistance paint with hold upto temperature 200 Deg C properly, paint over a coat of red oxide heat resistance primer with same specification complete all as specified and as directed.
Material and labour for repair or iron foundation of storage tank of softener plant of Steam Boiler by using welding of broken parts and replacement of old rusted length of iron strips and making the foundation serviceable and capable of bearing the load of water storage tank by suitable PCC works. paint of iron foundation stand over a coat of red oxide complete all as specified and as directed.
Supply and fix in replacement of rotational moulded HDPE Makeup water storage tank three layered (cylindrical) vertical with close top hoisted and fixed in position of capacity 2000 Ltr. Including providing water connection from Makeup water storage tank to Existing Pipeline of Softener Plant and Steam Boiler and installation on existing staging including Float valves and incoming and outgoing Gate valves of existing size of Steam Boiler Plant of MH all as specified and directed. Make-Sintex
C. Incinerator
Site visit will be carried out by service technician of OEM Alfa Therm or as recommended by the OEM once in two months during the contract period. In the visit, technician will check and inspect of Incinerator plant of capacity 50Kg/Hr Make-Alfatherm and the technician will act as per following step :- Note: (Material will be measured and paid separately)
Contractor must submit the service reports every two month from the Service Engineers along with the details of the Repair/maint/replacement of spares/testing of Incinerator complete carried out during the contract period. On Failure of visit by OEM/Approved firm representative or non submission of report by him, a panel recovery of Rs 10000/- per visit shall be made from the contractor dues.
Cleaning of chocked coil by descaling Incinerator coils
Measure the blow down time and testing in normal running condition
Checking and rectify the minor faults in the furnace and Chimney.
The visit includes includes the repair/replacement/refilling of the cartidge of printer of the incinertor used for recording of the running period of the incinerator.
He will submit his report in writing in respect of faults pointed out in plant, requirement of replacement of parts and other issues related with the plant.
After submission of report, spare parts shall be provided from Sch 'A' item below for repair, fixing and efficient running of plant only .
Service technician will issue 'OK' report for smoth functioning of Incinerator plant after replacing the parts to the entire satisfaction of Eng-in-Charge.
NOTE :- (a) All type of repair and fixing / replacement of parts shall only be carried out by Qualified and experienced Service technician in any condition. (b) The contractor will be responsible to make all arrangements at his own cost and nothing shall be claimed extra to the GOVT.
Contractor must have to ensure the MES & MH rep for the machine functional in all aspects
Supply only the following items for Incinerator plant of capacity 50 Kg/hr including taking down of existing part and necessary testing after replacement :-
Sequence controller cat part as existing
photocell
Oil pressure pump
Hose pipe size 3 mtr as per sample
Cap for Photocell Mounting (Rubber Cap)
HT wire
Oil Filter
Gland Washer
Ignition Transformer 230V 50 Hz LO 14 for Incinerator Burner
Nozzle as per existing size
temperature controller with thermocople Make:- Sunrey/ Guru
Oil Seal (HCA-7)
Safety Valve
Valve Seat Assly
V-Belt as per existing size
Sight Glass Dia 50mm
Max clean SR 601
M&L for descaling of water pipe line & nozzels cleaning of Ventury scrubber including replacement of defective drain pipe as per existing size complete all as specified and directed.
M&L for incinerator control panel including redressing of control panel wiring including replacement of defective existing copper cable etc and testing of all safety & control complete all as specified and as directed.
M&L for repair of ID fan and duct of incinerator including dismantling complete of electrical connection and repair in replacemnt of unserviceable parts of ID fan and ducts,including servicing of motor, greasing of ball bearing ,alignment of shaft fan pulley etc and welding of connecting rusted ducts of chimney of Incinerator as per existing size and reassembling complete and testing complete all as specified and directed. Note: Sapre parts will be measured and paid separately under relevant items
MS Main Shaft (EN8)
Blower Fan Blade complete of DYE Steel of size 24" or as existing complete
MS Bush with Key of size as existing
Suitable bearing with sleeves and bush
M&L for repair of fuel transportation pump in order to suppply the fuel to Fuel tank from the container/barrel and replacement of hose pipes and testing complete all as specified and as directed.
M&L for repair of Chimney of incinerator including replacement of rusted nut bolts and tightening of nut bolts, tightening of guy wire ,checking the correct vertical position of the Chimney by tightening of nut bolts , guy wire and foundation nut bolts by welding of connecting rusted ducts of chimney of Incinerator as per existing size of nut bolts wahser and other items as required on site complete all as specified and directed. Note: (a)The job must be carried out in presence of qualified and experienced Engineers in the subject field. (b) Rates of T&P including transportation charges of Hoist & Cranes required for the job must be included in the quoted rate.
Supply and fixing battery 12 Volt 65 AH of the EPU of the OT of MH and testing and commissioning complete all as specified and directed. Make: Exide/Amaron/Luminous
Note:- (a) The time limit for attending the job/complaints with in 24 hours. (b) In case the contracts fails to attend/rectify the defects within the above time limit, penalty will the imposed as under:- (a) Rs. 1000/- per day for 1st two days and after that Rs. 2000/- per day. (c) In case of non-functioning of Laundry machines,Boilers & Incinerator, a penalty shall be imposed against the contractor and a penal recovery of Rs 500/- per day for minor repair and Rs 1000/- for major repairs shall be recovered from the contractor's dues.
Lucky Engineering Works
R K ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .