| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹81.8 L−₹46,113.42 (0.56%)Accepted-Finance D 5 1 RANA PRATAP BAGH DELHI 110007 | NORTH | DELHI | 110007 | ₹81.8 L−₹46,113.42 (0.56%) | H2 | Accepted-Finance QUOTED LOWEST RATE |
| 2 | H1₹82.3 LRejected-Finance 109 IIND FLOOR MADANGIR VILLAGE NEW DELHI 110 062 | SOUTH | DELHI | 110062 | ₹82.3 L | H1 | Rejected-Finance H1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY NOT FIT |
| Sl No | Description | Qty | Unit | AKSHIT BUILDERS H2 | SINGH BROTHERS H1 |
|---|---|---|---|---|---|
| 1.00ITEMS TO BE EXECUTED | |||||
| 1.01 | Scientific earthwork in excavation done very varefully layer by layer with the help of small kudal , pickaxe , khurpa , coir brush , wire brush without damaging present structure & structure underneath (historic remains) and Stacking of servicable material at site and Removal of Unservicable material from site to dumping yard with lead upto 200 mtr. | 767.12 | M3 | 1,728 ₹13,25,583.36 Lowest | 1,739 ₹13,34,021.68 |
| 1.02 | Removal of old settled debries from collpased structure manually very very carefully and stacking at one place manually | 764.69 | M3 | 1,622 ₹12,40,327.18 Lowest | 1,622 ₹12,40,327.18 Lowest |
| 1.03 | Provision for removal of old damaged , bulged out , out of plumb / not in alignment walls at ancient structure for conservation | 513.3 | M3 | 968 ₹4,96,874.4 Lowest | 995 ₹5,10,733.5 |
| 1.04 | Provision for resetting of special size brick masonry work and underpinning the brickwork ( types of brick sizes are used in structure 300 mm x 250 mm x 80 mm,430 mm x 250 mm x 80 mm,240 mm x 120 mm x 80 mm,230 mm x 220 mm x 50 mm ) with composite lime mortar 1:1:1 ratio (1 lime, 1 Surkhi 1 C.Sand ) including cost of material, carriage of material , curing and cost of labour etc complete | 513.3 | M3 | 7,885 ₹40,47,370.5 | 7,880 ₹40,44,804 Lowest |
| 1.05 | Providing and laying 100mm thick lime concrete with 20mm brick aggregate nominal size mixed with 50% lime mortar in ratio of 1:1:1 (1 U/lime ,1 surkhi ,1 Sand )after compacting of loose soil, including beating and ramming for finishing the top surface and adding adhesive material comlete with in 200m lead and lift 30mtr approx. | 17 | M3 | 10,100 ₹1,71,700 Lowest | 10,178 ₹1,73,026 |
| 1.06 | Provision for Pointing the joints of ancient brick masonry in lime mortar 1:1:1 (1 U/Lime ,1 Surkhi , 1 Sand) mixed with adhesive material including washing & cleaning of joints with cartages of material 200mtr lead and lift of 10 to 30mtr etc complete. | 1,682.5 | M2 | 483 ₹8,12,647.5 Lowest | 484 ₹8,14,330 |
| 1.07 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 403 | M2 | 217 ₹87,451 Lowest | 275 ₹1,10,825 |
Tender Value
₹82.1 L
EMD Value
₹2.5 L
Closing Date
24 Jun 2026, 11:00 amClosed
SA ASI Meerut Circle
Office of the SA ASI Meerut Circle Shastri Nagar Meerut
CONSERVATION AND RESTORATION OF PYRAMIDAL STRUCTURE TEMPLE NO 1 AT AHICHCHHATRA BAREILLY
2026_ASI_911553_1
Nort/Meer/Ahic/Fort/24524053
Open Tender
Civil Works
Works
90 days
FORT AT RAMNAGAR OR AHICHCHHATRA
Please refer tender document
2 documents required · 2 mandatory
₹0
₹2.5 L
Yes
1 Jul 2026
4 Jun 2026
25 Jun 2026
4 Jun 2026
24 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ITEMS TO BE EXECUTED | |||||
| 1.01 | Scientific earthwork in excavation done very varefully layer by layer with the help of small kudal , pickaxe , khurpa , coir brush , wire brush without damaging present structure & structure underneath (historic remains) and Stacking of servicable material at site and Removal of Unservicable material from site to dumping yard with lead upto 200 mtr. | 767.12 | M3 | - | - |
| 1.02 | Removal of old settled debries from collpased structure manually very very carefully and stacking at one place manually | 764.69 | M3 | - | - |
| 1.03 | Provision for removal of old damaged , bulged out , out of plumb / not in alignment walls at ancient structure for conservation | 513.3 | M3 | - | - |
| 1.04 | Provision for resetting of special size brick masonry work and underpinning the brickwork ( types of brick sizes are used in structure 300 mm x 250 mm x 80 mm,430 mm x 250 mm x 80 mm,240 mm x 120 mm x 80 mm,230 mm x 220 mm x 50 mm ) with composite lime mortar 1:1:1 ratio (1 lime, 1 Surkhi 1 C.Sand ) including cost of material, carriage of material , curing and cost of labour etc complete | 513.3 | M3 | - | - |
| 1.05 | Providing and laying 100mm thick lime concrete with 20mm brick aggregate nominal size mixed with 50% lime mortar in ratio of 1:1:1 (1 U/lime ,1 surkhi ,1 Sand )after compacting of loose soil, including beating and ramming for finishing the top surface and adding adhesive material comlete with in 200m lead and lift 30mtr approx. | 17 | M3 | - | - |
| 1.06 | Provision for Pointing the joints of ancient brick masonry in lime mortar 1:1:1 (1 U/Lime ,1 Surkhi , 1 Sand) mixed with adhesive material including washing & cleaning of joints with cartages of material 200mtr lead and lift of 10 to 30mtr etc complete. | 1,682.5 | M2 | - | - |
| 1.07 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 403 | M2 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
tend.pdf
Tender Documents • 20.12 MB
BOQ_958009.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .