Loading…
Loading…
Tender Value
₹3.4 Cr
EMD Value
₹1.7 L
Closing Date
1 Jul 2026, 5:30 pm
Similar tender results from the same govt authority in the past 3 years.
MS Ananya Gupta Bouddh(EE)
EXECUTIVE ENGINEER, HEAVY MACHINERY DIVISION, BILASPUR
Construction of Pressurized Pipe Distribution Network Lift Irrigation Scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 Meter Residual Head at 1 Ha for Pressurized Irrigation by rotation in village Kapua, Block -Patharia ,Dist. -Mungeli in 160 Ha. in kharif (Right side of KHAIRI Anicut as indicated in Index Map), out of total gross command area 270 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (FTL line) of KHAIRI Anicut as indicated in the index map for Irrigation System without exceeding total power requirement for Solar pumps with solar panel of 100 KWp.It includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , SCADA work with automation etc. for supply of filtered water for irrigation under pressure. The work also includes construction of chowkidar quarter, pump house, installation of Solar power plant and sub station with transformer of required capacity by liasoning with CSEB, Management, Operation and Maintenance (MOM) and defect liability (DL) for the period of 05 years after completion and MOM and DL period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by Engineer-in-Charge as per details given in scope of work
192409
01/SAC/e-procurement / 2026-27 Dated 05.06.2026
OPEN TENDER
WORKS
11 days
EXECUTIVE ENGINEER, HEAVY MACHINERY DIVISION
Required Past Technical Experience: AS PER NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
24 documents required · 24 mandatory
Water Resources Department (WRD)
WORKS
MS Ananya Gupta Bouddh(EE)
OPEN TENDER
LUMPSUM
OPEN TO ALL
EXECUTIVE ENGINEER, HEAVY MACHINERY DIVISION, BILASPUR
TENDER CELL
CHIEF ENGINEER, HASDEO BASIN, BILASPUR
120
11
No
5
192409
1 Jul, 2026 5:30:00 PM IST
2 Jul, 2026 11:30:00 AM IST
17 Jun, 2026 5:31:00 PM IST
01/SAC/e-procurement / 2026-27 Dated 05.06.2026
Construction of Pressurized Pipe Distribution Network Lift Irrigation Scheme to supply water for irrigation to deliver at farmers field up to 1 ha with a duty of 0.70 lit/sec/ha and maintained up to 4 ha chak, keeping the discharge of minimum 3 times the duty at one hectare and at least 20 Meter Residual Head at 1 Ha for Pressurized Irrigation by rotation in village Kapua, Block -Patharia ,Dist. -Mungeli in 160 Ha. in kharif (Right side of KHAIRI Anicut as indicated in Index Map), out of total gross command area 270 hectare fully covering the entire compact, contiguous possible arable area beyond 500m from submergence line (FTL line) of KHAIRI Anicut as indicated in the index map for Irrigation System without exceeding total power requirement for Solar pumps with solar panel of 100 KWp.It includes all activities starting from survey, investigation, designing, estimating costing, procurement, construction, laying, installing, energizing, etc. of pumping system, rising and gravity mains, main line, branch lines, distribution network, controlling and regulation system , SCADA work with automation etc. for supply of filtered water for irrigation under pressure. The work also includes construction of chowkidar quarter, pump house, installation of Solar power plant and sub station with transformer of required capacity by liasoning with CSEB, Management, Operation and Maintenance (MOM) and defect liability (DL) for the period of 05 years after completion and MOM and DL period run simultaneously and work also including foundation stone laying ceremony and inauguration ceremony and as directed by Engineer-in-Charge as per details given in scope of work
171000.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
34200000.00
2
1 Jul, 2026 5:31:01 PM IST
34200000
AS PER NIT
AS PER NIT
AS PER NIT
311.00 INR
14d 17h 5m
24 documents required · 24 mandatory
₹311
₹1.7 L
5 Jun 2026
5 Jun 2026
2 Jul 2026
17 Jun 2026
1 Jul 2026
17 Jun 2026
1 Jul 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.10 MB
2474697197864275801_192409_192409 Drawing.pdf
NIT • 1.78 MB
1313668073400058791_192409_VOLUME I 192409.pdf
NIT • 1.19 MB
1045635497738567685_192409_VOLUME II 192409.pdf
NIT • 4.75 MB
3442240631904541873_192409_VOLUME III TS 192409.pdf
NIT • 1.71 MB
3433252120362359055_192409_corrigendum1 192409.pdf
NIT • 0.82 MB
Download all tender documents and submit your bid