| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹11.5 LAccepted-AOC NEAR NEW BUS STAND ANNI DISTT KULLU H P | ANNI | KULLU | HIMACHAL PRADESH | L-1 | Accepted-AOC Accepted | |
| 2 | L-2₹13.7 L+₹1.6 L (13.2%)Rejected-AOC HIMACHAL PRADESH HP | KANGRA | HIMACHAL PRADESH | 176204 | L-2 | Rejected-AOC Rejected | |
| 3 | L-3₹15.3 L+₹3.2 L (26.7%)Rejected-AOC HIMACHAL PRADESH HP | L-3 | Rejected-AOC Rejected |
Tender Value
₹11.6 L
EMD Value
₹28,875
Closing Date
27 Sept 2021, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
OPeration Circle HPSEBL Rampur Bushahr
Supply of Power to LWSS 1st and 2nd stage from Behna Khad to Shegubag (Ashnal) I Gram Panchyat Behna and Dingidhar (Anni Block) under Electrical Sub-Division, HPSEBL, Neether ED HPSEBL Anni.
2021_HPSEB_52218_2
OCRB/DB-Tender-08/2021
Open Tender
Electrical Works
Item Rate
90 days
Anni
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,240
₹28,875
11 Mar 2022
13 Sept 2021
28 Sept 2021
13 Sept 2021
27 Sept 2021
13 Sept 2021
60 days
Amount
A Erection of 22KV HT line (At Behna and Shegubag (1st and 2nd Stage)
Erection of steel tubular poles 10/11 mtr. long Double Pole str. Digging of pit, erection of pole, filling of pit ramming, drilling of holes in poles & X- Arms, fixing of insulator, X-Aram, knee bracing set , X-bracing set, top clamp fixing of danger plate painting of poles etc. complete in all respect.
Earthing
Digging of pits fixing of G.I wire to the earth system, filling of pit etc.
Stay set HT
Digging of pit fixing of stay rod , filling of pit nuzzling & tighting
Erection of RCC Muff with Concreting filling.
Sagging of conductor 1 Km single wire ACSR conductor 50 mm2
Laying of conductor stringing and sagging binding with insulator (Single wire)
Laying of G.I Wire stringing and sagging and jumpering etc. (Single wire)
F Manual Carriage of 22KV HT Line Material
Manual carriage of HT Line Material from road head to site of work Av. Lead 1.200 Kms (2.07x1.200)=2.484 Km
Erection of Sub- Stations 1x250 KVA 22/.4 KV (At Behna-Stage-1st)
Digging of pits for poles & earthing (2 nos for poles 3 Nos for earthing.
Drilling of holes in X-arams
Preparation of platform structure members C.I, A.I X-Arm & knee bracing set
Erection of D/Pole
Erection of RCC Muff with Concreting filling.
Erection of platform
Erection of X-Aram, Drop out, Lightening Arrestor, Meet, Switch L.T Energy Meters
Erection of Transformer
providing earthing connection to G.O. switch transformers lightening arrestor etc.
Erection of stay set
Erection of Jumpers
Pipe earthling 3 nos of each
Erection of LT cable 3.5 core 185 mm2
fixing of barbed wire & painting
Transformer Bed and chian link fancing Angle Iron, Gate Etc.
Manual Carriage of 1 No.250 KV Sub-station Material
Manual carriage of 250 KVA Trnasformer and allied accessories from road head to site of work Av. Lead 0.100 Kms
Erection of Sub- Stations 1x100 KVA 22/.4 KV (At Ashnal) Stage-II
Digging of pits for poles & earthing (2 nos for poles 3 Nos for earthing.
Drilling of holes in X-arams
Preparation of platform structure members C.I, A.I X-Arm & knee bracing set
Erection of D/Pole
Erection of RCC Muff with Concreting filling.
Erection of platform
Erection of X-Aram, Drop out, Lightening Arrestor, Mccb, Switch L.T Box Energy Meters
Erection of Transformer
providing earthing connection to G.O. switch transformers lightening arrestor etc.
Erection of stay set
Erection of Jumpers
Pipe earthling 3 nos of each
Erection of LT cable 3.5 core 185 mm2
fixing of barbed wire & painting
Manual Carriage of 1 No.100KV Sub-station Material
Manual carriage of 100 KVA Trnasformer and allied accessories from road head to site of work Av. Lead 0.100 Kms
Erection of LT line
Erection of steel tubular poles 9 Mtr long single pole(digging of pit, drilling of holes in poles, X-Arm, erection of pole, section of X-Arm, shackle/insulator filing of pit & ramming fixing of jumper etc.
Erection of RCC muf with concerting
ERECTION OF LT STAY SET
Digging of pits fixing of stay rod, nuzzling & tightening
ERECTION OF EARTHING
Digging of pits fixing of G.I. wire to the earth system, filling of pit etc.
SAGGING of conductor ACSR conductor 30 mm2 SINGLE WIRE
Laying of conductor stringing and sagging binding with insulator
Laying of G.I Wire stringing and sagging and jumpering etc. (Single wire)
SUPPLY OF MATERIAL FOR 2Nos (1x250 KVA and 1No 100KVA) SUB-STATION
Providing of Steel tubular Pole 10/11 Mtr Long (Provided by HPSEBL) Quantity 4.00 Unit No.
Providing of 250 KVA Transformer(Provided by HPSEBL) Quantity 1.00 Unit No.
Providing of 100 KVA Transformer(Provided by HPSEBL) Quantity 1.00 Unit No.
Providing RCC Muffs with concreting.(Provided by HPSEBL) Quantity 4.00 Unit Each.
Providing x-Arms (Channel Iron (100x50x6mm) Length 2800mmx8Nos. For Bed.
Providing x-Arms (Channel Iron(75x40x6mm) Length 2800mmx8Nos for supporting DO fuse unit & GO switch.
Providing x-Arms (Channel Iron(100x50x6mm) Length 460mmx4Nos for supporting Main Channel of ransformer.
Providing MS Angle Iron (50x50x6mm) Length 2800mmx(2Nos for LA's+ 4Nos for Dist. Panel Box)
Providing Knee bracing 4 set (1set=2Nos)
Transformer Belting
Providing MS Angle Iron (50x50x6mm) Length 2800mmx 4 Nos.
Providing MS Angle Iron (35x35x5mm) Length 460mmx2Nos.
Providing GO AB Switch (22KV,400A,25KA)
Providing DO Fuse Unit (Provided by HPSEBL) Quantity 2.00 Unit Set.
Providing Surge Arrester 18 KV Station Class (Porcelain Type)
Providing Disc Insuator Sets (comparising 2 No. Disc (Procelain BS 12KV ,90KN) including Dead End Clamps etc.)(Provided by HPSEBL) Quantity 6.00 Unit Set.
Providing Stay set complete
Providing Stay Wire 7/3.15 mm (@6.0 Kg. Per Stay Set )
Providing Pipe earthing complete(Provided by HPSEBL) Quantity 6.00 Unit Set.
Providing LT Distribution Pannel Box With MCCB(400A,36KA,4P,1No.) & SFU (100A 4No. Rewiratble ) (Provided by HPSEBL)
Providing Half Clamp(MS Flat 50x6mm)
Providing Full Clamp
Providing Nut and Bolts of various sizes (galvanised/ coated preferably 16mm or more with flat and spring washers)
Providing Aluminum Thimble
Providing Lead tin shoulder 60:40
Providing Shoulder flux
Providing 22 KV danger plate(Provided by HPSEBL) Quantity 2.00 Unit No.
Providing Barbed wire
Providing LT cable 3.5 Core 185 MM²(Provided by HPSEBL) Quantity 60.00 P/km.
Providing Energy meter (3-Phase,4-wire ) DLMS complaint CT Type for 250KVA Transformer 300-400/5A (Provided by HPSEBL) Quantity 2.00 Unit No.
Providing Aluminum paint
SUPPLY OF MATERIAL FOR 22 KV HT LINE
Providing of Steel ubular pole 10/11 Mtr. Long (Provided by HPSEBL) Quantity 24.00 Unit No.
Providing of ACSR Conductor 6/3/3.35 (50mm2) including 3 conductor(Provided by HPSEBL) Quantity 6.40 Unit K/M.
Providing RCC Muff with concrete filling.(Provided by HPSEBL) Quantity 24.00 Unit No.
Providing X-Arms (MS Channel Iron (3000x100x50x6)mm
Providing X-Arms (MS Channel Iron(1800x100x50x6)mm
Providing x-Bracing set MS Angle iron (1500x50x50+ 2700x50x50)mm
Providing Knee bracing Set
Providing Disc insulator sets on dead end str.(comprising 2No Disc porcelain,BS 12kv,90kn,including dead end clamp etc)(Provided by HPSEBL) Quantity 27.00 Unit set.
Providing 22KV Pin insulator (Porcelain,12kv,10kn)(Provided by HPSEBL) . Quantity 36.00 Unit No.
Providing Stay Set complete in all respect.
Providing Stay wire (7/3.15mm)
Providing HT Earthing set complete.(Provided by HPSEBL) Quantity 13.00 Unit No.
Earth wire(G.I 6SWG) ( Includes 2 wire length and additional 1% sag and wastage @150 kg/m.
Providing Eye Hook for earth wire.
Providing Danger Plate.(250x200x1.6mm)(Provided by HPSEBL) Quantity 12.00 Unit No.
Providing Nut and Bolts of various sizes (galvanised/ coated preferably 16mm or more with flat and spring washers).
Providing Barbed wire
Providing Aluminium Paint
Providing 22kv G.O Switch
Providing 22KV DO Fuse(Provided by HPSEBL) Quantity 2.00 Unit No.
SUPPLY OF MATERIAL FOR LT LINE
Providing of Steel tubular Pole 9 Mtr Long(Provided by HPSEBL) Quantity 3.00 Unit No.
Providing of ACSR Conductor 6/1/2.59 mm2 (30mm2) including 3 conductor.(Provided by HPSEBL) Quantity 0.68 Unit Km.
Providing RCC muff with concrete filling .(Provided by HPSEBL) Quantity 3.00 Unit No.
Providing Stay set complete
Providing Stay wire 7/3.15 mm
Providing Shackle insulator (16KN)
Providing D-iron (U-Clamp)(Provided by HPSEBL) Quantity 24.00 Unit No.
Providing Earth Knob
Providing Aluminium Paint
ProvidingM.S. Nuts & bolts off size
Providing full clamp (2No for A.I+1No for Stay set)
Providing Earthing set complete(Provided by HPSEBL)
Providing Earth wire G.I wire 8 SWG (Addiational 1& Sag & wastage) @0.102 Kg/m
Providing Angle Iron (75x75x6) (Length 1.50Mtr +0.02Mtr)
Providing Spool Tie
Providing XLPE Cable 3.5 core 300mm2(Provided by HPSEBL) Quantity 35.00 Unit Mtr.
LEKH RAJ
ubish chander
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_78038.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .