Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC SIRKA BAZAR ARGADA RAMGARH JHARKHAND 829101 | ARGADA | RAMGARH | JHARKHAND | 829101 | ₹2.5 L Quoted ₹2.1 L | 1 | Accepted-AOC As per TCR on L1 Basis |
| 2 | 2₹2.1 L+₹599.90 (0.28%)Rejected-AOC NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹2.1 L+₹599.90 (0.28%) | 2 | Rejected-AOC As per TCR on L1 Basis |
| 3 | Rejected-Technical MASJID MOHALLA SIRKA MANDU RAMGARH JHARKHAND 829101 | RAMGARH | RAMGARH | JHARKHAND | 829101 | - | - | Rejected-Technical Electrical license expired, hence S H Enterprises is not technically eligible. |
| Sl No | Description | Qty | Unit | Rajneesh Electricals L2 | M/s Minex Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Repairing/rewinding of welding machine 440volts, 400 Amps of Excavation w.Shop. Copper wire for primary SWG 12 No with less scrap value of 60% of the cost | 32 | Kgs | 380 ₹12,160 Lowest | 380 ₹12,160 Lowest |
| 2.00 | Copper wire for secondry winding SWG 08 No with less scrap value of 60% of the cost | 16 | Kgs | 380 ₹6,080 Lowest | 380 ₹6,080 Lowest |
| 3.00 | Insulating material @15% of copper wire cost | 7.2 | Kgs | 947.5 ₹6,822 Lowest | 947.5 ₹6,822 Lowest |
| 4.00 | Labour cost @ 15% of copper wire cost | 1 | Job | 6,825 ₹6,825 Lowest | 6,825 ₹6,825 Lowest |
| 5.00 | Cost of stud bushing | 2 | Nos | 7,145 ₹14,290 | 6,845 ₹13,690 Lowest |
| 6.00 | Providing of bake lite fiber sheet | 1 | No | 5,110 ₹5,110 Lowest | 5,110 ₹5,110 Lowest |
| 7.00 | Contractor Profit | 1 | Job | 5,125 ₹5,125 Lowest | 5,125 ₹5,125 Lowest |
| 8.00 | Welding machine 400 Ampers of EKG 5A Shovel HMB-593 Copper wire for primary SWG 12 No with less scrap value of 60% of the cost | 32 | kgs | 380 ₹12,160 Lowest | 380 ₹12,160 Lowest |
| 9.00 | Copper wire for secondry winding SWG 08 No with less scrap value of 60% of the cost | 16 | Kgs | 380 ₹6,080 Lowest | 380 ₹6,080 Lowest |
| 10.00 | Insulating material @15% of copper wire cost | 7.2 | Kgs | 947.5 ₹6,822 Lowest | 947.5 ₹6,822 Lowest |
Tender Value
₹2.5 L
EMD Value
₹3,200
Closing Date
19 Jan 2026, 4:00 pmClosed
Atul Kumar
Project Engineer (Excv) Birsa OCP
Repairing/rewinding of 01 no. 440 Volts 400 Amps welding machine of EKG 5A Shovel, HMB 593, 01 No. of Excavation work shop and 01 No. of Pit office and jointing and vulcanizing of trailing cable(6core 3.3kv) of EKG 5A HMB 593 of Birsa Project.
2026_CCL_350720_1
PE(X)/BP/e-NIT/25-26/36 dtd 06.01.2026
Open Tender
Excavation Department Work
Item Wise
6 days
Project Engineer (Excv) Birsa OCP
Please refer tender NIT Document
2 documents required · 2 mandatory
₹3,200
Yes
22 Mar 2026
7 Jan 2026
20 Jan 2026
8 Jan 2026
19 Jan 2026
8 Jan 2026
8 Jan 2026 - 12 Jan 2026
Repairing/rewinding of welding machine 440volts, 400 Amps of Excavation w.Shop. Copper wire for primary SWG 12 No with less scrap value of 60% of the cost
Copper wire for secondry winding SWG 08 No with less scrap value of 60% of the cost
Insulating material @15% of copper wire cost
Labour cost @ 15% of copper wire cost
Cost of stud bushing
Providing of bake lite fiber sheet
Contractor Profit
Welding machine 400 Ampers of EKG 5A Shovel HMB-593 Copper wire for primary SWG 12 No with less scrap value of 60% of the cost
Copper wire for secondry winding SWG 08 No with less scrap value of 60% of the cost
Insulating material @15% of copper wire cost
Labour cost @ 15% of copper wire cost
Cost of stud bushing
Replacement of regulator connecting ringbush and nuts
Contractor Profit
Welding machine 600Ampers oil cooled 440V/220V of pit office of Birsa Project. Copper wire for primary SWG 12 No with less scrap value of 60% of the cost
Copper wire for secondry winding SWG 08 No with less scrap value of 60% of the cost
Insulating material @15% of copper wire cost
Labour cost @ 15% of copper wire cost
Cost of stud bushing
Providing of bake lite fiber sheet
Replacement of regulator connecting ringbush and nuts
Contractor profit.
Jointing and volcanising of Trailling cable of 3.3 Kv of EKG 5A Shovel Sl. No. HMB593 of Birsa Project Jointing and volcanising of Trailling cable of 3.3 Kv grades of EKG 5A Shovel Sl. No. HMB593
Contractor Profit
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.28 MB
BOQ_363478.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .