Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.8 LAccepted-AOC | ₹27.8 L Quoted ₹22.8 L | L1 | Accepted-AOC Award |
| 2 | L2₹23.1 L+₹30,493.20 (1.34%)Rejected-Finance | ₹23.1 L+₹30,493.20 (1.34%) | L2 | Rejected-Finance Rate higher side |
| 3 | L3₹23.4 L+₹58,020.05 (2.55%)Rejected-Finance | ₹23.4 L+₹58,020.05 (2.55%) | L3 | Rejected-Finance Rate higher side |
Tender Value
₹21.0 L
EMD Value
₹39,100
Closing Date
3 Apr 2020, 11:00 amClosed
Executive Engineer, HP.PWD., Division, Kangra
Executive Engineer, HP.PWD., Division, Kangra
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/600) and Rural Road Balla Badiara Harizan Basti road (HP0406VR098) km. 1/0 to 2/0 (SH- P/L 30mm thick bituminous concrete in km. 1/0 to 2/0)
2020_PWD_36164_9
18679-18728 dt.7.3.2020
Open Tender
Civil Works - Roads
Item Rate
30 days
items
Please refer Tender documents.
16 documents required · 16 mandatory
₹500
EE Kangra
₹39,100
21 Jul 2020
19 Mar 2020
3 Apr 2020
19 Mar 2020
3 Apr 2020
19 Mar 2020
Amount
Providing and laying rolling of built up spray grout single layer over prepared base consisting of a single layer composite construction of crushed coarse aggregates using motor grader for aggregates. Key stone chips spreader may be used with application of bituminous binder after each layer and with key aggregates placed on top of the second layer in serve as a base, conforming to the line, grades and cross section specified, the compacted layer thickness being 75mm (Seventy five milimetre) as per Technical Specificaion Clause 505 by manual means Bitumen (VG-10) and as per the entire satisfaction and direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidental. The rate includes octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying tack coat with Bitumen emulsion (RS-I) on the prepared bituminous surface cleaned with hydraulic brooms and spraying primer @ 0.225 kg. (Zero point two two five kilogram) per square metre using mechanical means as per technical specifications clause No.503 including carriage of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge. The rate includes octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying 30mm (Thirty milimetre) thick bituminous concrete with 100-120 (One hundred to One hundred twenty) TPH batch hot mix plant producing an average output of 75 Tonne (Seventy five tonne) per hour using crushed aggregates of grading-2, premixed with bituminous binder VG-10 (Viscosity grade ten) @ 5.4 to 5.6 (Five point four to Five point six) percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specificagtion clause No.507 complete in all respects to entire satisfaction and direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidental. The rate includes octroi, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government.
pritam singh thkur
NAVNEET SHARMA GOVT. CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .