| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹19.2 L+₹10,414.68 (0.54%)Accepted-AOC KERALA KL KERALA | L2 | Accepted-AOC L1 | |
| 2 | L1₹19.2 LRejected-AOC KERALA KL KERALA | ALAPPUZHA | KERALA | 686534 | L1 | Rejected-AOC L2 | |
| 3 | L3₹22.3 L+₹3.1 L (16.3%)Rejected-AOC AR CONSTRUCTIONS | L3 | Rejected-AOC L3 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
13 Jan 2025, 6:55 pmClosed
Executive Engineer ,KyIP Division Perambra
O/O Executive Engineer ,KyIP Division Perambra
CANAL RECTIFICATION
2025_Irrig_722786_1
EE/KyIP/13/2024-25
Open Tender
Civil Works - Canal
Item Rate
Naduvathur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
28 Feb 2025
4 Jan 2025
15 Jan 2025
4 Jan 2025
13 Jan 2025
4 Jan 2025
4 Jan 2025 - 13 Jan 2025
Amount
CANAL LINING
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
14.17: Raking out joints in lime or cement mortar and preparing the surface for repointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge
26.31.1:Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
VK BALAN (BID ID -2056717)
AR CONSTRUCTIONS (BID ID -2059378)
Bidder Name
N.P. KANARAN
VK BALAN
AR CONSTRUCTIONS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1146396.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .