Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | L1 | Accepted-AOC Lowest and Awarded | |
| 2 | L2₹15.4 L+₹63,290.27 (4.30%)Rejected-AOC PARMBILPEEDIKA ATTASSERY PO PALAKKAD 679513 | ATTASSERY | PALAKKAD | KERALA | 679513 | L2 | Rejected-AOC 2 rd lowest Rejected | |
| 3 | L3₹16.6 L+₹1.8 L (12.4%)Rejected-AOC | L3 | Rejected-AOC 3 rd lowest Rejected | |
| 4 | L4₹16.6 L+₹1.9 L (12.6%)Rejected-AOC | L4 | Rejected-AOC 4rd lowest Rejected |
| Sl No | Description | Qty | Unit | MUNEER P L1 | abdul kasim L3 | PALAKKAD Dist LABOUR CO OP SOCIETY Ltd L4 | shihabudheen pp L2 |
|---|---|---|---|---|---|---|---|
| 1.00Widening and Re-tarring of road | |||||||
| 1.00 | 2.14.2.A : Dismantling of Flexible Pavements
Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202
(II) By Mechanical Means
(A) Bituminous Courses | 114 | cum | 231.15 ₹26,351.1 Lowest | 259.62 ₹29,596.68 | 260 ₹29,640 | 241 ₹27,474 |
| 1.00 | 2.2.2.A : Clearing and Grubbing Road Land<br> Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. <br>
(II) By Mechanical Means <br>
(A) In area of non-thorny jungle | 0.08 | Hecter | 24,485.27 ₹1,860.88 Lowest | 27,501.57 ₹2,090.12 | 27,590 ₹2,096.84 | 25,570 ₹1,943.32 |
| 1.00 | 3.15.2 : Compacting Original Ground<br>
(ii) Compacting original ground supporting subgrade<br>
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 285 | cum | 41.65 ₹11,870.25 Lowest | 46.78 ₹13,332.3 | 46 ₹13,110 | 43 ₹12,255 |
| 1.00 | 3.5.3 : Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 91.5 | cum | 25.61 ₹2,343.32 Lowest | 28.77 ₹2,632.45 | 28 ₹2,562 | 26 ₹2,379 |
| 1.00 | 4.1.A.1 : Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 113.7 | cum | 2,100 ₹2,38,770 Lowest | 2,436.55 ₹2,77,035.74 | 2,444 ₹2,77,882.8 | 2,265 ₹2,57,530.5 |
| 1.01 | 4.9 : Wet Mix Macadam <br>
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br>
By Mechanical Means with 1 km lead | 216 | cum | 2,250 ₹4,86,000 Lowest | 2,653.25 ₹5,73,102 | 2,661 ₹5,74,776 | 2,466 ₹5,32,656 |
| 1.01 | 75.5.1.1pb : Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 1,440 | sqm | 70 ₹1,00,800 | 70.11 ₹1,00,958.4 | 70 ₹1,00,800 | 65 ₹93,600 Lowest |
| 1.01 | 75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,440 | sqm | 15 ₹21,600 | 14.3 ₹20,592 | 14 ₹20,160 | 13 ₹18,720 Lowest |
| 1.01 | 75.9.3.pb.pa : Plastic roads- Packed Bitumen Rate <br> 20mm thick Open-Graded Premix Carpet
using Bituminous (penetration grade/modified bitumen) Binder -<br> Bitumen S-65 -
Packed Bitumen and Shredded Plastic<br> <br> Providing, laying and rolling of opengraded
premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates
either using penetration grade bitumen or emulsion to required line, grade and level to
serve as wearing course on a previously prepared base, using HM Plant attached with
open pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, then
transferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2
mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hot
bitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rolling
with a. three wheel 80-100 kN static roller capacity, finished to required level and grades
to be- followed by seal coat of either Type A or Type B or Type C as per Technical
Specification Clause 508 <br> Case - I By Manual Means <br> <br> (II) Bitumen (S-65) | 1,440 | sqm | 160 ₹2,30,400 | 161.66 ₹2,32,790.4 | 162 ₹2,33,280 | 150 ₹2,16,000 Lowest |
Tender Value
₹17.8 L
EMD Value
₹26,710
Closing Date
14 Oct 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
Office of the Assistant Engineer, LID and EW Section,
CMLRRP- Sreekrishnapuram GP-Kodarmanna Kallarakunnu Road (GO MS.No.49/20/LSGD dt.23/02/2021)- Retarring works
2021_LSGD_443363_1
4/2021/AE/LSGD/SKPM
Open Tender
Civil Works - Roads
Item Rate
180 days
Kodarmanna, Sreekrishnapuram
As per tender document
7 documents required · 7 mandatory
₹2,500
₹26,710
Yes
30 Apr 2022
6 Oct 2021
18 Oct 2021
7 Oct 2021
14 Oct 2021
7 Oct 2021
60 days
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_631543.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .