| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance | -7.42% | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹4.3 L (1.43%)Admitted-Finance | -6.10% | ₹3.1 Cr+₹4.3 L (1.43%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 Cr+₹7.2 L (2.38%)Admitted-Finance 124 FIRST FLOOR SHYAM INDUSTRICAL ESTATE BEHIND THAKUR MALL DHARASHIV MAHARASHTRA 401107 | THANE | MAHARASHTRA | 401107 | -5.22% | ₹3.1 Cr+₹7.2 L (2.38%) | L3 | Admitted-Finance |
| 4 | L4₹5.8 Cr+₹2.8 Cr (92.3%)Admitted-Finance 18 26 THANAWALA GARGE DEVPRAYAG CHS BHAKTI MANDIR ROAD VILLAGE TOWN THANE CITY THANE THANE MAHARASHTRA 400602 INDIA | THANE | MAHARASHTRA | 400602 | +78.00% | ₹5.8 Cr+₹2.8 Cr (92.3%) | L4 | Admitted-Finance |
Tender Value
₹3.3 Cr
EMD Value
₹7.7 L
Closing Date
9 Jan 2026, 3:00 pmClosed
Executive Engineer Civil
Office of the EE, Civil, NMPA, Panambur, Mangalore
Carry out balance work of Restorative repair works for Berth No.8 KIOCL Berth at NMPT Retrofitting work of deck structure and RCC pile through risk and cost
2025_NMPT_890403_1
CIVIL/CE(C)/EE(C)/81/2025-26
Open Tender
Civil Works - Others
Percentage
540 days
NMPA, Panambur
As per tender condition
7 documents required · 7 mandatory
₹1,680
Yes
As per Tender Document
₹7.7 L
Yes
5 Feb 2026
18 Dec 2025
12 Jan 2026
18 Dec 2025
9 Jan 2026
2 Jan 2026
25 Dec 2025 - 26 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description | |||||
| 1.01 | POST SURVEY: Carrying out Post- survey by taking Half Cell & UPV potential meter reading, in selected pile caps, longitudinal beams and cross beams and deck slab (at least 4 No. s in each selected structural component) in 5 sequence all as per the relevant specifications. The rate including instrumentation, hiring of cost of boat, survey, equipment, labour and, etc. complete and as directed by the Engineer-in-Charge. | - | NO | - | - |
| - | SURFACE PREPARATION: The cover concrete shall be chipped and removed up to rear side of the steel bar shall be exposed using the electrically operated c hammer chipping machine and hand chiseling by using water jet for the removal of all loose particles, fungal and marine growth including the cost of all materials, hire charges of compressor, pneumatic tools, hire charges of barge, boat, water jet and all labour charges etc., complete. | 1 | sqm | - | - |
| - | ANCHORING SHEAR CONNECTORS: Providing and fixing the shear connectors (secondary reinforcement), 10 mm dia holes shall be drilled at the required locations as per the drawings. The pilot holes shall be drilled using 10mm dia hammer drill bit. The holes shall be widened using the appropriate drill bit size 16/18 mm dia. Drilling shall be carried out without much of vibration so as not to disturb adjacent concrete. The holes shall be roughened for better bonding. The holes shall be cleaned with good water. The base and hardener of Anchor grout shall be mixed and poured to 2/3 of the depth followed by insertion of the shear connecting rod of 12 mm dia gently in to the pre poured holes. The resin grout material utilized shall be tested in accordance with BS 4551, BS 5080 and BS 2782 respectively. Gaps if any shall be packed with mixed grout. Allow it to set for a minimum of 20 minutes without disturbing including the cost of all materials, hire charges of hammer drilling machine and all consumables cost of 12mm shear connecting rod and all labour charges etc., complete. | - | no | - | - |
| - | NEW REINFORCEMENT : Providing and fabricating T.M.T steel reinforcement including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM hire charges of barge, boat, complete as per specifications - TMT bars Fe 550 | - | MT | - | - |
| - | PROVISION OF SACRIFICIAL ANODE: Providing and fixing the sacrificial anode V Providing and fixing Sacrificial Anode for damaged RCC Member such as slab, beam, column etc Providing and fixing zinc alloy based galvanic disk type sacrificial anodes (50 mm dia, 18 mm thick) to the reinforcement and pass 500 hours salt spray test as per ASTM B 117, The anode shall be connected to the reinforcement steel by connectors provided with the anode. as per the manufacturer specification, before fixing, the location to be selected by using the Half Cell Potential meter test, checking the probability of corrosion, checking of conductivity of the rebars by using the multimeter, Tie up the sacrificial zinc anode at the prescribed spacing of 1.00 m C/c after marking the positions of each unit on the steel reinforcement, including cost of all materials, labours and machineries etc. complete. | - | NO | - | - |
| - | PROVISION OF ANTICORROSIVE TREATMENT TO THE OLD AND NEW REINFORCEMENT: Anticorrosive coating to the reinforcement: Consist of providing and Applying zinc Primer two coats for the Re bars, primer shall be an epoxy based, two component, zinc rich liquid packed and supplied ready to use confirming to IS14589:1999 (Reaffirmed 2004). An unbroken 40 microns dft/coat coating shall be capable of providing active galvanic protection and avoiding the generation of incipient anodes in the immediately adjacent locations. It shall be of suitable viscosity to enable the coating to penetrate into imperfections and pits within the surface of the structural steel, strictly following the manufacturers instruction. Cost of all materials, tools and labour cost etc., complete. | - | sqm | - | - |
| - | KSRRBM 2800-11: Epoxy bonding of new concrete to old concrete including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 2805 | - | SQM | - | - |
| - | MICRO CONCRETE FOR 75 TO 100 MM THICK: Providing and laying Micro Concrete, polycrete - A or equivalent shall be stocked along with 12 mm downgraded chips at site to enable completion of pouring in a continuous operation. An approved grout concrete mixer of slow speed heavy duty drill shall be used for the mixing of the micro concrete. Exact quantity of water as directed by the department should be poured in to mixing vessel along with the polycrete or equivalent and 12 mm cleaned chips (in the ratio of 1:0.50 or 0.75) slowly. The mix shall be mixed thoroughly in forced action. The mixed material should be placed immediately in the formwork continuously without any gap through the PVC pipe fixed from the top of the deck. The cost inclusive of, providing and fabricating, fixing and removing Slurry tight formwork for facilitating micro-concreting work using water-proof plywood/ steel shuttering/ FRP sheets which should not deform or leak due to pressure of micro concrete shall be fabricated and erected in position. Provision shall be made for pouring micro concrete in to the form work, which shall be coated with mould release agent. Proper supporting arrangement shall be made for keeping the shutter in correct line and length Cost inclusive of sufficient Nos of Core cutting of minimum required diameter size of existing structure on the concrete surface for Pouring Micro concrete by trimmie method for the Slab areas. Cost inclusive of approved type and make pre-fabricated access and working platform, fabricated, as per site requirement for successful completion of work. The cost of all materials, cost of hire charges barges, pontoon, boat, all machineries diving equipment and all labour charges including divers etc., complete. | 1 | CUM | - | - |
| - | MEMBRANE CURING AGENT: SELF CURING COMPOUND FOR CONCRETE SURFACE : (WATER/ WAX BASED) Providing & applying water based (WB) / wax based low viscosity wax emulsion curing compound membrane / layer applied in the form of spray over the concrete surface. The material consists of self-curing compound membrane satisfying ASTM C309-90 standard ensuring a non-penetrating continuous film on the concrete surface covering an area of 4.5 to 5 sqm per ltr of curing compound and shall be applied with a distance of 45 cms after 5 hours of concreting to get the best results. | - | SQM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_936006.xls
BOQ • 0.35 MB
tenderdocument.pdf
Tender Documents • 6.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .