Loading…
Loading…
85 results • Latest
Electrification of New Covered Storage Shed near S J Gate
Replacement of Existing Fire Fighting Pipelines at Berth No. 11
Interest rate quote
Replacement of Existing Fire Fighting Pipelines at Berth No. 10
Providing Garden Lights inside Wharf and Ambedkar Statue
Providing fencing to the gardens in wharf area
Supplying and Laying of 3Cx120 sq.mm 11kV HT UG cable to RCHW Colony Transformer Centre
Replacement of Existing Sodium Vapour Light Fittings with High Bay LED Light Fittings at Oil Jetty Pump House No. 1 and 2
Providing exterior painting and Repairs to the Entry Gates to Godown No. 33 and 34
Interest rate quote
Annual Maintenance of Dwarf walls by fixing and painting at berth no 1 to 7 inside wharf area
Electrification of Pass Section near Mallya Gate at Wharf
Restoration of galvanized sheet for roof at toilet block near Over flow shed No.01 and Restoration of galvanized sheet for roof at West side of Platform area of Over flow shed No.02, NMPA
Providing and fixing Aluminium road studs and road marking from Berth No.8 to entire Oil Jetty area
Requirement of additional facilities to Port Health Organization at NMPA Cruise Extension east side
Providing and fixing MS grating over the existing drain in front of Traffic building inside wharf area
Wall cladding with vitrified tiles at Rani Abbakka gate
Maintenance of garden at A.O Building, Ambedkar Park, Nandaneshwara, Vishnumoorthy Temple, Godown no 31 and 32 Business Development Park and Test Centres for the year 2026-27 and 2027-28 (2 years)
Providing Pavement Quality Concrete Road from Main gate to Railway crossings parallel to security compound wall
Renovation of Pass section at Mallya gate at NMPA
Providing galvolume sheet roofing on the 2nd floor terrace of the Business Development Centre at NMPA
Construction of Retaining Wall and Primary Compost Bin at NMPA Vermicompost Unit
Mosquito white ants and Rodent Control measures at NMPA for the year 2026-27 and 2027-28
Electrical works at HOD quarters at 9th Avenue
Electrification of Traffic Buildings Ground Floor at Wharf
Operation and Maintenance of 1.2 MLD STP, Sprinkler system / Pumps, Raw sewage pumps inside wharf and RCHW colony at NMPA for the years 2026-27 and 2027-28
Providing Pavement Quality Concrete in front of Traffic building and main gate to 30 meter road junction inside wharf area
Modification to the wall, floor and false ceiling cruise lounge inside wharf area at NMPA
General conservancy and maintenance of road, road berms and drains for the Service Road from Main gate to KIOCL Junction, Thannirubavi road and M.K Agro road for the year 2026-27 and 2027-28 - Part E
General conservancy and cleaning of road, road berms and drain sides in the wharf area for the years 2026-27 and 2027-28- Part B -Area between Container terminal , Main gate , 30mtr road upto labour canteen.
Maintenance of garden at wharf area and cruise Lounge , NMPA for the year 2026-27 and 2027- 28- part A
Maintenance of Garden in and around the Scanner yard and Cruise Terminal area for the year 2025-26 and 2026-27 -PART B
Refixing of RCC pole and chain link fencing near container scanner yard
General conservancy and cleaning of road, road berms, drain sides and berths in the wharf area for the years 2026-27and 2027-28- Part A -Area between Berth No.1 to 8
General Conservancy and cleaning of Road, Road Berms, Drains, Jetty for the year 2026-27 and 2027-28 - Part-D - Area from Berth No. 8 to oil Jetty area
MAINTENANCE OF GARDEN AT OIL JETTY AREA FOR THE YEAR 2026-27 AND 2027-28- PART -C
General conservancy and cleaning of road, road berms and drains for the years 2026-27 and 2027-28- Part C - Area between labour canteen and KK gate
REMOVAL OF GARBAGE or DEBRIS INSIDE WHARF AREA FOR THE YEAR 2026-27 AND 2027 -28
Supply and Plantation of Plants in the Existing Concrete Trough near Cruise Lounge area inside Wharf area
Maintenance Dredging at New Mangalore Port for the years 2026-27, 2027-28 and 2028-29 (03 Years)
interest rate quote for investment of Rs. 102 Crs
Hiring of 02 Nos. Multipurpose Fire Tenders with manpower for a period of 05 years
Replacement of Galvalume sheet and other allied works at New shed No. 1 and 2 of Wharf Area, NMPA
Supply, Installation, Testing and Commissioning of Star Delta Starter Panel for 45KW, Jockey Pump Motor and allied works at Fire Pump House
Providing cement concrete paver blocks to the area behind NMPA High school
Pruning of tree branches at NMPA Colony, watering to the plants, conveying and burring the carcass and Plantation for the year 2026-27
Electrification and HVAC works to Chairman Chamber and Board Room at Administrative Office Building
Construction of wash rooms Toilet at jetty No 12 and 13 at oil jetty area
Construction of Temporary resting shelter and drinking water facility at South side of Railway platform inside wharf area
CHARTERING OF GREEN TUG (GREEN TUG TRANSITION PROGRAMME COMPLIANT) -MANNING, OPERATION, MAINTENANCE AND COMPLETE TECHNICAL MANAGEMENT OF SERVICE PROVIDER OWNED/ LONG CHARTERED 01 NO. 60T NEW BATTERY ELECTRIC TUG FOR 15 YEARS AT NMPA