Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance 501 INDUS HOUSE OPP GSFC MAIN GATE DASHRATH VADODARA VADODARA GUJARAT 391740 UDYAM GJ 24 0001805 24AADCI2182H1ZS R M M MSME STATUS AS VERIFIED NOT VERIFIED | VADODARA | GUJARAT | 391740 | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹13.4 L (8.10%)Admitted-Finance | ₹1.8 Cr+₹13.4 L (8.10%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹15.1 L (9.10%)Admitted-Finance | ₹1.8 Cr+₹15.1 L (9.10%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹24.9 L (15.0%)Admitted-Finance | ₹1.9 Cr+₹24.9 L (15.0%) | L4 | Admitted-Finance |
| 5 | L5₹2.1 Cr+₹44.4 L (26.8%)Admitted-Finance 5 6 7 8 III FLOOR KAMALA PALACE OLD JAIL ROAD CIVIL LINES GURGAON GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹2.1 Cr+₹44.4 L (26.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Akash Constructions L13 | EVOLUTION TECH and INFRA PVT LTD L4 | MANALI ENGINEERING INDIA L5 | ANUGRAHA ENGINEERING L11 | JAPSINJACOB WIRE DRAWING PRIVATE LIMITED L7 | TI JOHN AND SONS L6 | APRA INFRAPROJECTS L12 | Indus Fire Safety Private Limited L1 | IBF Engineering Services Pvt Ltd L8 | INDRIYA ENGINEERING PVT LTD L2 | V TECH OFFSHORE SERVICES PVT. LTD. L10 | Securix Multiple Solution L3 | RAKSHAK FIRE SAFETY SERVICES L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of existing corroded 500NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 97 | Mtrs | 4,85,000 ₹5,72,300 | 2,27,950 ₹2,68,981 | 2,71,600 ₹3,20,488 | 5,82,000 ₹6,86,760 | 8,73,000 ₹10,30,140 | 2,91,000 ₹3,43,380 | 2,66,750 ₹3,14,765 | 1,06,700 ₹1,25,906 Lowest | 1,45,500 ₹1,71,690 | 1,45,500 ₹1,71,690 | 2,71,600 ₹3,20,488 | 5,82,000 ₹6,86,760 | 2,91,000 ₹3,43,380 |
| 2.00 | Dismantling of existing corroded 350NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 299 | Mtrs | 8,37,200 ₹9,87,896 | 6,42,850 ₹7,58,563 | 5,68,100 ₹6,70,358 | 17,94,000 ₹21,16,920 | 23,92,000 ₹28,22,560 | 7,47,500 ₹8,82,050 | 5,75,575 ₹6,79,178.5 | 2,30,230 ₹2,71,671.4 | 3,28,900 ₹3,88,102 | 2,09,300 ₹2,46,974 Lowest | 4,48,500 ₹5,29,230 | 12,55,800 ₹14,81,844 | 6,27,900 ₹7,40,922 |
| 3.00 | Dismantling of existing corroded 250NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 7 | Mtrs | 15,750 ₹18,585 | 12,950 ₹15,281 | 9,100 ₹10,738 | 21,000 ₹24,780 | 52,500 ₹61,950 | 16,100 ₹18,998 | 9,625 ₹11,357.5 | 3,850 ₹4,543 Lowest | 7,350 ₹8,673 | 4,200 ₹4,956 | 7,000 ₹8,260 | 21,000 ₹24,780 | 10,500 ₹12,390 |
| 4.00 | Dismantling of existing corroded 200NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 107 | Mtrs | 1,71,200 ₹2,02,016 | 1,87,250 ₹2,20,955 | 1,81,900 ₹2,14,642 | 2,56,800 ₹3,03,024 | 7,49,000 ₹8,83,820 | 1,60,500 ₹1,89,390 | 1,17,700 ₹1,38,886 | 47,080 ₹55,554.4 Lowest | 1,07,000 ₹1,26,260 | 53,500 ₹63,130 | 65,805 ₹77,649.9 | 2,56,800 ₹3,03,024 | 1,28,400 ₹1,51,512 |
| 5.00 | Dismantling of existing corroded 150NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 45 | Mtrs | 47,250 ₹55,755 | 74,250 ₹87,615 | 58,500 ₹69,030 | 81,000 ₹95,580 | 2,92,500 ₹3,45,150 | 45,000 ₹53,100 | 37,125 ₹43,807.5 | 14,850 ₹17,523 Lowest | 44,550 ₹52,569 | 18,000 ₹21,240 | 23,850 ₹28,143 | 81,000 ₹95,580 | 40,500 ₹47,790 |
| 6.00 | Dismantling of existing corroded 100NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 20 | Mtrs | 12,000 ₹14,160 | 31,000 ₹36,580 | 20,000 ₹23,600 | 24,000 ₹28,320 | 1,20,000 ₹1,41,600 | 16,000 ₹18,880 | 11,000 ₹12,980 | 4,400 ₹5,192 Lowest | 18,000 ₹21,240 | 6,000 ₹7,080 | 9,000 ₹10,620 | 24,000 ₹28,320 | 12,000 ₹14,160 |
| 7.00 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 500NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 97 | Mtrs | 1,14,29,025 ₹1,34,86,249.5 | 24,25,000 ₹28,61,500 Lowest | 33,95,000 ₹40,06,100 | 37,88,432 ₹44,70,349.76 | 24,25,000 ₹28,61,500 Lowest | 33,95,000 ₹40,06,100 | 55,91,080 ₹65,97,474.4 | 34,89,575 ₹41,17,698.5 | 35,40,500 ₹41,77,790 | 35,89,000 ₹42,35,020 | 51,41,000 ₹60,66,380 | 29,28,139 ₹34,55,204.02 | 50,92,500 ₹60,09,150 |
| 8.00 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 350NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 299 | Mtrs | 1,98,96,656 ₹2,34,78,054.08 | 67,27,500 ₹79,38,450 | 83,72,000 ₹98,78,960 | 82,81,403 ₹97,72,055.54 | 59,80,000 ₹70,56,400 Lowest | 89,70,000 ₹1,05,84,600 | 1,14,12,830 ₹1,34,67,139.4 | 67,63,679 ₹79,81,141.22 | 83,72,000 ₹98,78,960 | 75,64,700 ₹89,26,346 | 79,23,500 ₹93,49,730 | 66,86,537 ₹78,90,113.66 | 65,48,698 ₹77,27,463.64 |
| 9.00 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 250NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 7 | Mtrs | 4,89,547.94 ₹5,77,666.57 | 1,05,000 ₹1,23,900 | 1,23,060 ₹1,45,210.8 | 1,30,200 ₹1,53,636 | 1,40,000 ₹1,65,200 | 1,89,000 ₹2,23,020 | 3,01,070 ₹3,55,262.6 | 1,00,303 ₹1,18,357.54 | 1,40,000 ₹1,65,200 | 91,000 ₹1,07,380 Lowest | 1,40,000 ₹1,65,200 | 1,29,150 ₹1,52,397 | 1,35,100 ₹1,59,418 |
| 10.00 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 200NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 107 | Mtrs | 43,04,717 ₹50,79,566.06 | 19,26,000 ₹22,72,680 | 18,19,000 ₹21,46,420 | 15,95,798 ₹18,83,041.64 | 19,26,000 ₹22,72,680 | 26,75,000 ₹31,56,500 | 22,59,840 ₹26,66,611.2 | 12,69,983 ₹14,98,579.94 | 17,12,000 ₹20,20,160 | 10,70,000 ₹12,62,600 Lowest | 19,26,000 ₹22,72,680 | 13,26,800 ₹15,65,624 | 15,94,835 ₹18,81,905.3 |
Tender Value
₹1.9 Cr
EMD Value
₹4.4 L
Closing Date
23 Jul 2026, 3:00 pmClosed
Executive Engineer Mechanical II
Ground Floor Administrative Building, NMPA Panambur-575010
Replacement of Existing Fire Fighting Pipelines at Berth No. 11
2026_NMPT_915439_1
CME-04/2026-27 dated 02/07/2026
Open Tender
Machineries/ Mechanical Engg Items
Works
150 days
NMPA PANAMBUR
As per Tender
2 documents required · 2 mandatory
₹1,120
Yes
FA and CAO
₹4.4 L
Yes
16 Sept 2026
2 Jul 2026
24 Jul 2026
2 Jul 2026
23 Jul 2026
10 Jul 2026
2 Jul 2026 - 9 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing corroded 500NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 97 | Mtrs | - | - |
| 2 | Dismantling of existing corroded 350NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 299 | Mtrs | - | - |
| 3 | Dismantling of existing corroded 250NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 7 | Mtrs | - | - |
| 4 | Dismantling of existing corroded 200NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 107 | Mtrs | - | - |
| 5 | Dismantling of existing corroded 150NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 45 | Mtrs | - | - |
| 6 | Dismantling of existing corroded 100NB Fire Fighting Pipeline of Berth No.11. Shifting and stacking of dismantled items nearby control tower and Pump house-II of Berth No.11 | 20 | Mtrs | - | - |
| 7 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 500NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 97 | Mtrs | - | - |
| 8 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 350NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 299 | Mtrs | - | - |
| 9 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 250NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 7 | Mtrs | - | - |
| 10 | Supply, Fabrication, Erection, and Testing of cement lined (inside) ERW steel pipe of 200NB confirming to BIS:3589 of Grade Fe 410 of thickness not less than 9.5mm for 300NB and above and not less than 8mm for below 300NB for carrying sea water including supply of Pipes, specials, Bends, Tees, GI Flanges, Dummy flanges, Gaskets, Bolts &Nuts, Washers, Reducers, Expanders mobile steel/RCC supports saddles inserts fixtures including painting 3 coats of approved colour (one coat of zinc –rich primer & two coats of epoxy paint with fire red colour ) externally.
Note:
1) Pipeline shall be provided with Flange Joints for every six meters length.
2) Doubler plate SS rod and clamp with bolt nut and washer complete shall be provided to the Mobile steel/RCC support structure. (Height of mobile steel/RCC support structure 1.5 feet).
Media of flow Sea water. | 107 | Mtrs | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
FinalTenderDocument.pdf
Tender Documents • 2.62 MB
BOQ_962045.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .