| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 LAccepted-AOC | ₹9.3 L Quoted ₹10.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹10.7 L+₹55,912.95 (5.50%)Rejected-AOC | ₹10.7 L+₹55,912.95 (5.50%) | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | G.ROBINSON L1 | JOJY THOMAS L2 |
|---|---|---|---|---|---|
| 1.00Protection works of river | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 82 | sqm | 20.26 ₹1,661.32 Lowest | 21.38 ₹1,753.16 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 9 | each | 753.19 ₹6,778.71 Lowest | 794.65 ₹7,151.85 |
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 28.3 | cum | 844.05 ₹23,884.93 Lowest | 890.51 ₹25,199.65 |
| 1.00 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 66.15 | cum | 2,565.58 ₹1,69,713.12 Lowest | 2,706.8 ₹1,79,054.82 |
| 1.00 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | 66.15 | cum | 846.9 ₹56,022.44 Lowest | 893.52 ₹59,106.35 |
| 1.01 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 20.4 | cum | 3,306.11 ₹67,444.64 Lowest | 3,488.1 ₹71,157.24 |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 103.19 | cum | 4,449.61 ₹4,59,159.71 Lowest | 4,694.54 ₹4,84,434.28 |
| 1.01 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 19.81 | cum | 1,911.87 ₹37,872.23 Lowest | 2,017.11 ₹39,956.93 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 76.2 | cum | 287.05 ₹21,873.21 Lowest | 302.85 ₹23,077.17 |
Tender Value
₹9.3 L
EMD Value
₹23,297
Closing Date
27 Feb 2026, 5:00 pmClosed
AEE
O/o AEESouthsubdivisiontvm
GENERAL-Downstream Both Banks of Valicode Bridge-Side Protection works on both banks of Killi River on the downstream of Valicode Bridge in Nedumangad MunicipalityGeneral Civil Work
2026_Irrig_839596_1
IRR/IA/TR/4647/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
nedumangad
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,055
₹23,297
28 Jul 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
27 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Protection works of river | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.003 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 1 | cum | - | - |
| 1.004 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | - | cum | - | - |
| 1.005 | 60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. | - | cum | - | - |
| 1.006 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 1 | cum | - | - |
| 1.007 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 0.4 | cum | - | - |
| 1.008 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.009 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1414845.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbd.pdf
Tender Documents • 1.64 MB
BOQ_1414845.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .