Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Finance | -15.00% | ₹13.1 L | L1 | Admitted-Finance |
| 2 | L2₹14.5 L+₹1.4 L (10.7%)Admitted-Finance | -5.91% | ₹14.5 L+₹1.4 L (10.7%) | L2 | Admitted-Finance |
| 3 | L3₹14.6 L+₹1.5 L (11.8%)Admitted-Finance | -5.00% | ₹14.6 L+₹1.5 L (11.8%) | L3 | Admitted-Finance |
| 4 | L4₹15.1 L+₹2.1 L (15.9%)Admitted-Finance | -1.50% | ₹15.1 L+₹2.1 L (15.9%) | L4 | Admitted-Finance |
Tender Value
₹15.4 L
EMD Value
₹30,720
Closing Date
1 Jun 2026, 5:00 pmClosed
xen hq
jda jodhpur
barsati nali, stone road and other development work at ward no. 64 golnadi near rajput sabha bhawan and various near by places
2026_JDAJO_561834_1
JoDA/Nit-08/HQ/2026-27
Open Tender
Civil Works
Percentage
120 days
jda jodhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
SECRETARY JDA JODHPUR AND MD RISL JAIPUR
₹30,720
Yes
4 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
1 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A | - | - | - | - |
| 2 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar. | 8 | Cum. | 641 | ₹5,128 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 4: 8 or leaner mix. | 40 | Cum. | 393 | ₹15,720 |
| 4 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 180 | Sqm. | 80 | ₹14,400 |
| 5 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | 22 | Cum. | 637 | ₹14,014 |
| 6 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead in a 50 meter including stacking of useful material if available : Hard rock(blasting prohibited) useful material 30% | 16 | Cum. | 551 | ₹8,816 |
| 7 | Carriage of Building Rubbish Stone metal (Grit and ballast etc.) lead upto 5 KM | 132 | Cum. | 125 | ₹16,500 |
| 8 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 36 | Cum. | 3,847 | ₹1,38,492 |
| 9 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 17 | Cum. | 3,182 | ₹54,094 |
| 10 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 16 | Cum. | 3,824 | ₹61,184 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
golnadi.pdf
Tender Documents • 1.61 MB
BOQ_999760.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .