Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹13.2 L+₹1.3 L (10.7%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹13.5 L+₹1.5 L (12.5%)Rejected-Finance KOOTTUPURAKKAL | 3 | Rejected-Finance L3 | |
| 4 | 4₹14.2 L+₹2.2 L (18.3%)Rejected-Finance KERALA | 4 | Rejected-Finance L4 | |
| 5 | 5₹15.2 L+₹3.2 L (26.7%)Rejected-Finance | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | VISHNUDAS V L5 | VIJAYARAGHAVAN C L4 | C.RAMDAS L6 | MANOJ CM L7 | LIPIN M V L1 | MUHAMMEDBASHEER.KA L3 | Faizal K P L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00GHS MUDAPPALOOR MAINTENANCE | ||||||||||
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 3 | each | 132.74 ₹398.22 | 124 ₹372 | 136.89 ₹410.67 | 140 ₹420 | 105 ₹315 | 148.31 ₹444.93 | 100 ₹300 Lowest |
| 1.00 | 11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. | 658.62 | sqm | 1,589.96 ₹10,47,171.51 | 1,485.32 ₹9,78,254.03 | 1,639.7 ₹10,79,931.02 | 1,685 ₹11,09,766.28 | 1,260 ₹8,29,854.9 | 1,250 ₹8,23,268.75 Lowest | 1,458.41 ₹9,60,530.7 |
| 1.00 | 14.1.2:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:Cement mortar 1:4 ( 1 cement: 4 coarse sand) | 15.78 | sqm | 536.5 ₹8,465.97 | 501.19 ₹7,908.78 | 553.28 ₹8,730.76 | 568 ₹8,963.04 | 425 ₹6,706.5 | 599.44 ₹9,459.16 | 390 ₹6,154.2 Lowest |
| 1.00 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 15.78 | sqm | 187.29 ₹2,955.44 | 174.96 ₹2,760.87 | 193.15 ₹3,047.91 | 198 ₹3,124.44 | 148 ₹2,335.44 Lowest | 209.26 ₹3,302.12 | 150 ₹2,367 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 45.32 | sqm | 147.55 ₹6,686.38 | 137.84 ₹6,246.36 | 152.17 ₹6,895.74 | 156 ₹7,069.3 | 117 ₹5,301.97 | 164.86 ₹7,470.8 | 110 ₹4,984.76 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,710 | kg | 159.69 ₹2,73,069.9 | 149.18 ₹2,55,097.8 | 164.68 ₹2,81,602.8 | 169 ₹2,88,990 | 124 ₹2,12,040 Lowest | 178.42 ₹3,05,098.2 | 125 ₹2,13,750 |
| 1.01 | 10.15.2:Providing and fixing M.S. Tubular frames for doors, windows, ventilators and cupboard with rectangular /L-Type sections, made of 1.60 mm thick M.S. Sheet,joints mitred, welded and grinded finish, with profiles of required size, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer.Fixing with carbon steel galvanised dash fastener of required dia and size ( to be paid for separately) | 250 | kg | 149.94 ₹37,485 | 140.07 ₹35,017.5 | 154.63 ₹38,657.5 | 160 ₹40,000 | 118 ₹29,500 Lowest | 167.53 ₹41,882.5 | 125 ₹31,250 |
| 1.01 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 120.9 | sqm | 31.58 ₹3,818.02 | 29.51 ₹3,567.76 | 32.57 ₹3,937.71 | 34 ₹4,110.6 | 25 ₹3,022.5 | 35.29 ₹4,266.56 | 23 ₹2,780.7 Lowest |
| 1.01 | 16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 120.9 | sqm | 1,067.37 ₹1,29,045.03 | 997.12 ₹1,20,551.81 | 1,100.76 ₹1,33,081.88 | 1,132 ₹1,36,858.8 | 846 ₹1,02,281.4 | 1,192.59 ₹1,44,184.13 | 800 ₹96,720 Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,339
Closing Date
20 Aug 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEERDIST PANCHAYAT PALAKKAD
Annual Plan-DP 2025-26 MUDAPALLUR HIGH SCHOOL MAINTENANCE IN VANDAZHI GP
2025_LSGD_783888_25
04/AEE/2025-26 Dt 08.08.2025
Open Tender
Civil Works - Others
Item Rate
180 days
PALAKKAD
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,339
Yes
18 Nov 2025
12 Aug 2025
22 Aug 2025
12 Aug 2025
20 Aug 2025
12 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1290845.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .