Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical responsive |
| 2 | Accepted-Technical HARDAHA BALUWA VARANASI CHANDAULE | Accepted-Technical responsive |
Tender Value
₹13.8 L
EMD Value
₹27,600
Closing Date
14 Jul 2026, 4:00 pmClosed
EE RED
2nd floor vikas bhawan spn
Ward No. 16, 232 m CC construction from Mamu shop in Mo. Tareen Tikli to Om Babu house via Rajesh Gupta house
2026_REDUP_1161059_5
322 Date 02.06.2026
Open Tender
Consultancy
Fixed-rate
120 days
shahjahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹27,600
21 Jul 2026
17 Jun 2026
14 Jul 2026
17 Jun 2026
14 Jul 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of old BOE Soling and Stacking of Dismantled Bricks at Site Required for Proper Completion of Work as per new item si No-1 | 696 | Cum | - | - |
| 2 | Excavation in foundation in ordinary soil loame, clay or sand] inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. As per SI. No. 251. | 40.37 | Cum | - | - |
| 3 | Concrete with the 4 cm guage B/Ballast,Fine Local sand of 1.25 F.M and cement in proportion of 12:6 :1 in foundation and under floor including supply of all material and T&P etc. as P.W.D S.I. No 273 | 89.78 | Cum | 3,705 | ₹3,32,634.9 |
| 4 | M-150) First class Brick work in 1:4 cement and coarse Sand morter in foundation for one brickwork inculding supply of all materials Labour T & P etc. for proper completion of work based on S I No.305 | 37.36 | Cum | 5,580 | ₹2,08,468.8 |
| 5 | 12mm Thick Plaster with Cement and fine Sand Mortar in proportion 1:4 cement and fine Sand as P.W.D. SI. 584 | 104.4 | Sqm | 217 | ₹22,654.8 |
| 6 | C.C. work with 1:2:4 Cement, C/Sand and 20mm S/Grit in holdfasts including all required for proper completion of work as per SI No 279(i). | 73.66 | Cum | 8,303 | ₹6,11,598.98 |
| 7 | R.C.C. Work with 1:2:4 Cement and C/Sand and 20mm Stone Grit as per P.W.D SI No 283. | 1.73 | Cum | 8,900 | ₹15,397 |
| 8 | M.S. Iron Work in plan work such as reinforced Concreate as P.W.D SI. No 504 | 1.36 | Qtl | 8,754 | ₹11,905.44 |
| 9 | supply of laying polythene seet | 696 | Sqm | 20 | ₹13,920 |
| 10 | Making construction Joint | 278.4 | Sqm | 38.5 | ₹10,718.4 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
322t1.pdf
Tender Documents • 1.33 MB
BOQ_2176207.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .