Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.5 LAdmitted-Finance PO BINNAGURI DIST JALPAIGURI PIN 735203 W B | JALPAIGURI | WEST BENGAL | 735203 | ₹83.5 L | L1 | Admitted-Finance |
| 2 | L2₹90.5 L+₹7.1 L (8.48%)Admitted-Finance 244 22 ONKAR NAGAR B TRI NAGAR TRI NAGAR NEW DELHI 110035 NORTH WEST DELHI DELHI 110035 INDIA | NORTH WEST DELHI | DELHI | 110035 | ₹90.5 L+₹7.1 L (8.48%) | L2 | Admitted-Finance |
| 3 | L3₹91.7 L+₹8.2 L (9.81%)Admitted-Finance | ₹91.7 L+₹8.2 L (9.81%) | L3 | Admitted-Finance |
| 4 | L4₹92.8 L+₹9.3 L (11.2%)Admitted-Finance BHAGWATI BHAWAN PO HASIMARA DIST JALPAIGURI PIN 735215 | ALIPURDUAR | WEST BENGAL | 735215 | ₹92.8 L+₹9.3 L (11.2%) | L4 | Admitted-Finance |
| 5 | L5₹93.2 L+₹9.7 L (11.7%)Admitted-Finance | ₹93.2 L+₹9.7 L (11.7%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.N. GHOSH AND CO. L5 | HARBHAJDAS AGARWAL L8 | L. B. SHARMA L1 | M/S JAGDISH PRASAD AGARWALA L4 | MS SHRI B.C. DAS L3 | NIRMAL SALES CORPORATION L2 | R.MANJIT& CO L7 | M/s. RAMPHAL GARG L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | PART-I : (B/R WORKS)
Taking down chowkats with shutters (without taking off shutter from the frames) not exceeding 1.50 Sqm each complete all as specified and directed. | 20 | EACH | 100 ₹2,000 | 250 ₹5,000 | 80 ₹1,600 Lowest | 100 ₹2,000 | 200 ₹4,000 | 105 ₹2,100 | 400 ₹8,000 | 150 ₹3,000 |
| 2.00 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillar etc complete all as specified and directed. | 6.7 | CUM | 500 ₹3,350 | 850 ₹5,695 | 450 ₹3,015 | 500 ₹3,350 | 500 ₹3,350 | 510 ₹3,417 | 450 ₹3,015 | 330 ₹2,211 Lowest |
| 3.00 | Demolition and breaking up including removing salt glazed stoneware pipe 150 mm bore (internal) with concrete bedding and haunching complete including necessary earth work as required complete all as specified and as directed. | 50 | RM | 70 ₹3,500 | 300 ₹15,000 | 110 ₹5,500 | 20 ₹1,000 Lowest | 50 ₹2,500 | 42 ₹2,100 | 82 ₹4,100 | 30 ₹1,500 |
| 4.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 1,320 | SQM | 20 ₹26,400 Lowest | 70 ₹92,400 | 45 ₹59,400 | 25 ₹33,000 | 50 ₹66,000 | 33 ₹43,560 | 65 ₹85,800 | 23 ₹30,360 |
| 5.00 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 49.4 | CUM | 500 ₹24,700 | 650 ₹32,110 | 625 ₹30,875 | 400 ₹19,760 | 400 ₹19,760 | 960 ₹47,424 | 480 ₹23,712 | 350 ₹17,290 Lowest |
| 6.00 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description & in any position not specifically provided for, complete all as specified and as directed. | 5 | CUM | 1,000 ₹5,000 | 1,100 ₹5,500 | 950 ₹4,750 | 600 ₹3,000 | 500 ₹2,500 | 1,320 ₹6,600 | 480 ₹2,400 Lowest | 600 ₹3,000 |
| 7.00 | Taking down cement plaster of any description on brick or stone or concrete surface of wall & celing etc including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 2,500 | SQM | 20 ₹50,000 Lowest | 60 ₹1,50,000 | 35 ₹87,500 | 25 ₹62,500 | 40 ₹1,00,000 | 24 ₹60,000 | 45 ₹1,12,500 | 20 ₹50,000 Lowest |
| 8.00 | Taking down eaves gutters and rainwater pipes CI/PVC/AC soil pipe including all fittings, heads, shoes, bends, swan-necks, etc. (measured overall as fixed along the centre line over fittings and accessories) complete all as specified and as directed. | 60 | RM | 5 ₹300 Lowest | 20 ₹1,200 | 12 ₹720 | 10 ₹600 | 20 ₹1,200 | 33 ₹1,980 | 180 ₹10,800 | 20 ₹1,200 |
| 9.00 | Dismantling water tanks and removing to store of capacity exc 500 & n . Exc 1000 ltrs, complete all as specified and as directed. | 12 | EACH | 200 ₹2,400 | 600 ₹7,200 | 150 ₹1,800 | 100 ₹1,200 Lowest | 400 ₹4,800 | 402 ₹4,824 | 350 ₹4,200 | 250 ₹3,000 |
| 10.00 | S&F of rotational moulded PVC water storage tank 1000 litres capacity conforming to IS-12701(1989) cylindrical vertical type multi-layered (not less than three layers) with closed top including inlet, outlet and wash out holes of approved make hoisted and fixed in position all as specified in SSR Part-I, 2009 etc., complete all as specified and as directed. | 12 | EACH | 8,500 ₹1,02,000 | 13,500 ₹1,62,000 | 9,800 ₹1,17,600 | 8,500 ₹1,02,000 | 12,000 ₹1,44,000 | 6,810 ₹81,720 Lowest | 10,250 ₹1,23,000 | 8,000 ₹96,000 |
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
20 Aug 2026, 6:00 pmClosed
CWE BINNAGURI
HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232
SPL REPAIR OF BLDG NO 4J01 12 X JCOs MD ACCN UNDER GE S BINNAGURI
2026_MES_777477_2
8384/E8
Open Tender
Civil Works
Item Rate
270 days
GE SOUTH BINNAGURI
AS PER NIT
8 documents required · 8 mandatory
₹1,000
GE SOUTH BINNAGURI
₹1.9 L
Yes
7 Sept 2026
6 Aug 2026
22 Aug 2026
6 Aug 2026
20 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-I : (B/R WORKS)
Taking down chowkats with shutters (without taking off shutter from the frames) not exceeding 1.50 Sqm each complete all as specified and directed. | 20 | EACH | 1 | ₹20 |
| 2 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillar etc complete all as specified and directed. | 6.7 | CUM | 1 | ₹6.7 |
| 3 | Demolition and breaking up including removing salt glazed stoneware pipe 150 mm bore (internal) with concrete bedding and haunching complete including necessary earth work as required complete all as specified and as directed. | 50 | RM | 1 | ₹50 |
| 4 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed. | 1,320 | SQM | 1 | ₹1,320 |
| 5 | Demolition of unreinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and as directed. | 49.4 | CUM | 1 | ₹49.4 |
| 6 | Demolition of reinforced cement concrete (reinforcement cut as required to facilitate demolition) of any description & in any position not specifically provided for, complete all as specified and as directed. | 5 | CUM | 1 | ₹5 |
| 7 | Taking down cement plaster of any description on brick or stone or concrete surface of wall & celing etc including raking out joints, hacking for key, scrubbing down with water etc complete all as specified and directed. | 2,500 | SQM | 1 | ₹2,500 |
| 8 | Taking down eaves gutters and rainwater pipes CI/PVC/AC soil pipe including all fittings, heads, shoes, bends, swan-necks, etc. (measured overall as fixed along the centre line over fittings and accessories) complete all as specified and as directed. | 60 | RM | 1 | ₹60 |
| 9 | Dismantling water tanks and removing to store of capacity exc 500 & n . Exc 1000 ltrs, complete all as specified and as directed. | 12 | EACH | 1 | ₹12 |
| 10 | S&F of rotational moulded PVC water storage tank 1000 litres capacity conforming to IS-12701(1989) cylindrical vertical type multi-layered (not less than three layers) with closed top including inlet, outlet and wash out holes of approved make hoisted and fixed in position all as specified in SSR Part-I, 2009 etc., complete all as specified and as directed. | 12 | EACH | 1 | ₹12 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
8384TENDERDOCUMENTS.pdf
Tender Documents • 1.47 MB
BOQ_877266.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .