| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.7 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹9.7 L+₹99,797.79 (11.5%)Rejected-AOC | 2 | Rejected-AOC 2 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
22 Nov 2022, 4:00 pmClosed
EE
RCD BLY
Reconstruction of VRB of BAROR CANAL AT KM 5.822
2022_UPIDC_743150_25
12/EE/RCD/2022-23
Open Tender
Civil Works - Bridges
Item Rate
90 days
BAHEDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹22,000
6 Jan 2023
17 Nov 2022
22 Nov 2022
17 Nov 2022
22 Nov 2022
17 Nov 2022
Amount
Earth Work in excavation/Filling in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc.
Laying C.C. 1:2:4 Mix (M-10) cement, coarse sand & 20 mm down graded stone shighle including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering.
Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete.
Struck deep pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete.
Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone shighle including cost of all material, labour and T&P etc. complete but excluding cost of Centering, shuttering & Reinforcement.
Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone shighle including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement.
Centering & Shuttering For slab and Bed Block including all cost of material labour T&P etc. for complete work.
Supplying, laying and consolidation 150 mm thick loose to 100mm of stone ballast size 20 mm to 40 mm by road roller including cost of all material, labour and T&P etc.required for proper completion of work.
Providing and fixing in position pre-moulded joint filler in expansion
Supplying and laying tarfelt sheet below aproach slab as paper bearing including cost of all material labour and T&P required for proper completion of work.
Finishing of walls with water proofing cement paint of aprooved make such as super snocem, durrocem,Robiacem,guttucem,supreem quality of required shade on uncoated wall surface (For Two coat) over one coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials.
Reinforcement in slab, Bed Block laying,cutting,bending,binding and placing in position including all cost of material,labour,T&P etc. for complete work.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.
Supplying & Fixing 100 MM dia pipe for drain spout including cost of all material, labour and T&P etc. required for proper completion of work.
Earth Work in excavation/Filling in ordinary soil including initial lead & lift i/c all labour and T&P etc.
Dismantling Brickwork or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60 m as per direction of Engineer in Charge
Laying of 15cm thick 40mm gauge Dismantled Brick ballast as filter material as per direction of Engineer in Charge.
Printing chainage at VRB
Printing lettering including material chainage at VRB
Wheel guard (RCC1:1.5:3)
MANGLI RAM CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .