Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹13,833.51 (2.85%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.0 L+₹17,249.19 (3.55%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹5.8 L+₹95,980.65 (19.8%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹5.9 L+₹1.1 L (22.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹17,480
Closing Date
6 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please refer BOQ
2026_RDPR_306665_27
e-NIT No. 364 REW Rajouri of 2025 Dated 30-03-2026
Open Tender
Civil Works
Percentage
90 days
Rajouri
Please refer NIT
2 documents required · 2 mandatory
₹500
Yes
Rural Development and Panchayati Raj
₹17,480
Yes
25 May 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
6 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil :: | |||||
| 2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | |||||
| 3 | P/L OF WBM OF REQuired size 63 to 43mm and screening rolling with power road roller 8-10 tonne capacity all upto complete job | 1 | cum | - | - |
| 4filling of available earth of excavated earth in each layer not exceeding 20cm in depth upto complete job | |||||
| 5 | p/l of hume pipe culvert 0.90m dia including carriage and cost of pipes upto complete job | - | rmt | 1 | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone ) With 20% B Stone | - | cum | 1 | - |
| 8 | R R Stone masnory laid dry | 1 | cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work | 1 | sqm | - | - |
| 10 | Carriage of Sand & Agg. By an Avg lead of 24 Km by MT | 1 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_996362.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .