Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | -43.12% | ₹4.9 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | -41.50% | ₹5.0 L | L2 | Admitted-Finance |
| 3 | L3₹5.0 LAdmitted-Finance | -41.10% | ₹5.0 L | L3 | Admitted-Finance |
| 4 | L4₹5.8 LAdmitted-Finance | -31.88% | ₹5.8 L | L4 | Admitted-Finance |
| 5 | L5₹5.9 LAdmitted-Finance | -30.60% | ₹5.9 L | L5 | Admitted-Finance |
Tender Value
₹8.7 L
EMD Value
₹17,480
Closing Date
6 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
Please refer BOQ
2026_RDPR_306665_27
e-NIT No. 364 REW Rajouri of 2025 Dated 30-03-2026
Open Tender
Civil Works
90 days
Rajouri
Please refer NIT
2 documents required · 2 mandatory
₹500
Yes
Rural Development and Panchayati Raj
₹17,480
Yes
25 May 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
6 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil :: | |||||
| 2Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | |||||
| 3 | P/L OF WBM OF REQuired size 63 to 43mm and screening rolling with power road roller 8-10 tonne capacity all upto complete job | 1 | cum | - | - |
| 4filling of available earth of excavated earth in each layer not exceeding 20cm in depth upto complete job | |||||
| 5 | p/l of hume pipe culvert 0.90m dia including carriage and cost of pipes upto complete job | - | rmt | 1 | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1 | cum | - | - |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone ) With 20% B Stone | - | cum | 1 | - |
| 8 | R R Stone masnory laid dry | 1 | cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work | 1 | sqm | - | - |
| 10 | Carriage of Sand & Agg. By an Avg lead of 24 Km by MT | 1 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_996362.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid