Loading…
Loading…
Tender Value
₹1.0 Cr
EMD Value
₹2.0 L
Closing Date
16 Feb 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
BUILDINGS
14 conditions · 3 needing a document upload
For works costing more than Rs.50 lakhs - The tenderer must have minimum average annual contractual turnover of V/N or 'V' which ever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
E4-Any RCC/PSC work
22 conditions · 3 needing a document upload
Submission of Annexure-V under Document Verification Certificate- As per Advance Correction Slips to GCC - 2022, the tenderers shall submit copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder in form of Annexure V. Non-submission of the above Certificate(s) by the bidder shall result in summarily rejection of his/their bid.
Submission of Annexure-V(A) under Document Verification Certificate : In case of other than Company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm/Joint Venture (JV) /Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc., as the case may be. Non-submission of the above Certificate (s) by the bidder shall result in summarily rejection of his/their bid.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Copies of the following documents are to be uploaded: (i) Details such as Name of the tenderer/ Contractor, Validity of DSC, Complete address with pin code, Contact Number (ii) Copy of PAN Card (iii) Copy of GSTIN card
A copy of NEFT form duly filled in the details as necessary to be uploaded. (The Tenderer/ Contractor not having NEFT form may down load the empty NEFT form available in document site)
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family( HUF) / Limited Liability Partnership (LLP)etc. The tenderer(s) shall enclose the attested copies of the requisite documents(including Power of Attorney, if opted) for constitution of their concern as per clause 14 of GCC Part I and as per a) Clause 17 of GCC Part I, for JV b) Clause 18 of GCC Part I, for Partnership firm
All the instructions furnished in the Technical compliance/ Commercial Compliance/ Check-list/ Undertakings are only indicative and not exhaustive; The Tenderer shall read the GCC/Tender documents for complete details.
The tenderer shall thoroughly go through the entire tender documents and strictly adhere to the instructions and directions given therein.
If the Tenderer(s) deliberately give(s) wrong information/ or create incorrect documents in his/their offer or create circumstances for the acceptance of his/their offer, the Railway reserves the right to reject such offer at any stage.
All terms and conditions in the tender documents are binding on the Tenderers
Railway reserves the right to accept or reject any or all the tenders and to award the work in whole or in part without assigning any reason.
Unreleased Bid Security, if any, held with the Railway Administration, shall not be adjusted towards the Bid Security to be remitted.
Bid Security shall be deposited either in cash through e-payment gateway or e-BG or submitted as Bank Guarantee bond from a scheduled bank of India or as mentioned in tender documents subject to exemptions provided under para5(1) (a) of Part-1 (ITT) of GCC.
In case of submission of Bid Security in the form of Bank Guarantee, the Original Bank Guarantee (other than e-BG) should be delivered in person to the Official nominated as indicated in the Tender document within 5 working days before the closing date of submission of bids.
ADEN /Metro/ MAS's jurisdiction -Reconstruction of 2.25lakhs lit capacity RCC OHT in lieu of dismantling dilapidated Steel tanks in PWQ colony.
MAS04OF26020RM
MAS04OF26020RM
Open
Works - General
8 Months
Chennai, Tamil Nadu
₹0
₹2.0 L
16 Feb 2026
23 Jan 2026
83 items across 2 schedules · ₹1,02,94,100.87 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| CARRIAGE OF MATERIALS | — | — | — | — | |
| By Mechanical Transport including loading,unloading and stacking | — | — | — | — | |
| Steel | — | — | — | — | |
| 1 | 5km | Tonne | 15 | 193.03 | 2,895.45 |
| 2 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. | cum | 50 | 411.3 | 20,565 |
| EARTH WORK | — | — | — | — | |
| Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | — | — | — | — | |
| 3 | All kinds of soil | cum | 525.9 | 205.45 | 1,08,046.16 |
| Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete (Measurements to be taken of the face area timbered): | — | — | — | — | |
| 4 | Depth exceeding 3 m but not exceeding 4.5 m | Sqm | 452.39 | 91.6 | 41,438.92 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | cum | 616.89 | 368.65 | 2,27,416.5 |
| Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. | — | — | — | — | |
| 6 | All kinds of soil | cum | 508.94 | 104.5 | 53,184.23 |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | cum | 16.96 | 2,161.2 | 36,653.95 |
| Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | — | — | — | — | |
| 8 | All kinds of soil | Sqm | 1000 | 28.15 | 28,150 |
| Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | — | — | — | — | |
| 9 | Beyond 30 cm girth upto and including 60 cm girth | Each | 50 | 439.25 | 21,962.5 |
| 10 | Beyond 60 cm girth upto and including 120 cm girth | Each | 15 | 1,957.15 | 29,357.25 |
| CONCRETE WORK | — | — | — | — | |
| CEMENT CONCRETE (CAST IN SITU) | — | — | — | — | |
| Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | — | — | — | — | |
| 11 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources) | cum | 11.31 | 6,670.25 | 75,440.53 |
| DAMP-PROOF COURSE | — | — | — | — | |
| 12 | Extra for providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification. | Per bag of cement of 50kg | 49.76 | 57.15 | 2,843.78 |
| REINFORCED CEMENT CONCRETE | — | — | — | — | |
| CAST IN SITU | — | — | — | — | |
| Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | — | — | — | — | |
| 13 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 52.45 | 7,945.65 | 4,16,749.34 |
| Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | — | — | — | — | |
| 14 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone- III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | cum | 86.18 | 10,185.05 | 8,77,747.61 |
| FORM WORK | — | — | — | — | |
| Centering and shuttering including strutting, propping etc. and removal of form for | — | — | — | — | |
| 15 | Arches, domes, vaults up to 6 m span | Sqm | 359.49 | 1,826.25 | 6,56,518.61 |
| 16 | Extra for arches, domes, vaults exceeding 6 m span | Sqm | 359.49 | 575.25 | 2,06,796.62 |
| PRE-CAST RCC | — | — | — | — | |
| 17 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in shelves, including setting in cement mortar 1:3 (1cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but , excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | cum | 5.67 | 18,644.6 | 1,05,714.88 |
| STEEL REINFORCEMENT | — | — | — | — | |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | — | — | — | — | |
| 18 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 14314.67 | 89.65 | 12,83,310.17 |
| Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | — | — | — | — | |
| 19 | Thermo-Mechanically Treated bars of grade Fe-500D or more. | Kg | 25370.75 | 89.65 | 22,74,487.74 |
| STEEL WORK | — | — | — | — | |
| Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | — | — | — | — | |
| 20 | In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | Kg | 3000 | 142.3 | 4,26,900 |
| FINISHING | — | — | — | — | |
| CEMENT PLASTER IN TWO COATS | — | — | — | — | |
| 21 | 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster 1:3 (1 cement : 3 coarse sand) finished rough with sponge. | Sqm | 562.45 | 461.85 | 2,59,767.53 |
| PEBBLE DASH PLASTER | — | — | — | — | |
| 22 | Extra for plastering exterior walls of height more than 10 m from ground level for every additional height of 3 m or part thereof. | Sqm | 1589.01 | 72.8 | 1,15,679.93 |
| Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : | — | — | — | — | |
| 23 | Water thinnable cement primer | Sqm | 562.45 | 64.45 | 36,249.9 |
| EXTERIOR FINISHING | — | — | — | — | |
| Finishing walls with water proofing cement paint of required shade : | — | — | — | — | |
| 24 | New work (Two or more coats applied @ 3.84 kg/10 sqm) | Sqm | 562.45 | 97.6 | 54,895.12 |
| DISMANTLING AND DEMOLISHING | — | — | — | — | |
| 25 | Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge. | Kg | 120000 | 3.2 | 3,84,000 |
| 26 | Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres. | kg per metre height | 2500000 | 0.7 | 17,50,000 |
| WATER SUPPLY | — | — | — | — | |
| PP-R PIPES | — | — | — | — | |
| Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes confirming to IS:15801 UV stabilized & anti - microbial fusion welded, having thermal stability for hot & cold water supply, including all PP - R plain & brass threaded polypropylene random fittings, including trenching, refilling & testing of joints complete as per direction of Engineer-in-Charge. -External work | — | — | — | — | |
| 27 | PN - 10 Pipe, 160 mm OD (SDR-11) | Metre | 45 | 4,535.1 | 2,04,079.5 |
| C.I. SLUICE VALVES/ FIRE HYDRANTS & FIXTURES | — | — | — | — | |
| Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : | — | — | — | — | |
| 100 mm diameter | — | — | — | — | |
| 28 | Class II | Each | 2 | 4,500.25 | 9,000.5 |
| 150 mm diameter | — | — | — | — | |
| 29 | Class II | Each | 2 | 6,661.8 | 13,323.6 |
| AIR VALVE & WATER METER (BULK TYPE) | — | — | — | — | |
| Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329 : | — | — | — | — | |
| 30 | 100 mm dia Ductile Iron Class K-7 pipes | Metre | 60 | 1,121.1 | 67,266 |
| WATER PROOFING | — | — | — | — | |
| Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage. | — | — | — | — | |
| 31 | For vertical surface two coats @ 0.70 kg per sqm | Sqm | 144.93 | 406.25 | 58,877.81 |
| 32 | For horizontal surface one coat @1.10 kg per sqm. | Sqm | 56.96 | 311.5 | 17,743.04 |
| 33 | Providing and applying of swellable type water stop tape, 19mm x 25mm thick in linear meter (expansive nature) for construction joints treatment of RCC structure such as raft slab, retaining walls, water storage tank and at the junctions of raft slab with the retaining walls etc.. After cleaning the surface, one coat of required primer for swellable water stop tape shall be applied throughout the length of the joint @3.78 litre per 240 running meter. Over the primed surface swellable type water stop tape shall be placed. The work shall be carried out all complete as per specification and the direction of the Engineer-In-Charge. The product performance shall carry guarantee for 10 years against any leakage. | Metre | 117.15 | 495.4 | 58,036.11 |
| CONSERVATION OF HERITAGE BUILDINGS | — | — | — | — | |
| 34 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. ( 2 ) The payment will be made once only for execution of all items for such works. | Sqm | 481 | 285 | 1,37,085 |
| Schedule total | ₹1,00,62,183.28 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NEFTForm.pdf
ProcedureforLCModeofPayment.pdf
MOVEMENTOFVEHICLESNEARRAILWAYTRACK.pdf
GCCApril2022_compressed.pdf
IRGCCACS1to10_compressed.pdf
SNWmasterlistason09012026.pdf
eTenderformApril2022.pdf
FORMATIONBUILDINGBRIDGEPWAYWORKSJULY2024.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .