Making arrangements for festivals at SV Temple Bangalore Karnataka State for the year 2026 27
980116
127/EE-XIV/TTD/2026-27
OPEN - NCB
Annual maintenance works
TIRUPATHI
5 documents required · 5 mandatory
₹310
₹9,000
24 Aug 2026
24 Aug 2026
24 Aug 2026
Hire charges for erection and removal of flat/sloped roof M.S pipes pendals using 40mm MS pipes for verticals. horizontals and roof supports etc., fixing with, special type gripper MS clamps ( Nandu clamps), extra horizontal bracings should be provided from at 2.40 m to roof level and jointing with special type gripper MS clamps ( Nandu clamps)for horizontal bracings and column roofing including earth work excavation in all soils (Except rock requiring blasting) to a depth of 0.40m to 0.60m. The vertical posts are to be fixed strongly ithout any shaking. The roof shall be covered with G.I sheet/Aluminium sheet/Galvalume sheet and firmly fixed to the purlins etc., complete as directed during execution .The rate including conveyance and hire charges of all materials such as MS pips, Clamps, G.I sheet/Aluminium sheet/Galvalume sheet etc. and labour charges for fixing and removal etc., complete . The rate is for below mentioned Calendar days * The relevant conditions of the foot note mentioned at the end of these items applies. For 3 days
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days .* The relevant conditions of the foot note mentioned at the end of these items/chapter applies. -do- For 1 day
Hire charges for erection and removal of temporary Dias at a height of 60 cms to 120 cms (2' 0" to 4' 0") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made with out undulation. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Hire charges for supply, erection and removal of digital design flex boards with frame work made with of 25mm x 25mm MS square pipe (light weight)with required back support to erect boards at specified places as directed by the department. The cost inclusive of materials, labour for printing, erection and removal square pipe (light weight) after completion of the function.
Hire charges for erection and removal of side curtains with white / colour design cloth and required frame work including using necessary bolts, nuts, etc., complete. The rate is including conveyance of all materials and labour charges for fixing and removal etc., complete .The Side curtains should be neat and with good appearance in all days , if spoiled in any manner and the same should be replaced immediately. The rate is for below mentioned calendar days .The rate is for below mentioned calendar days. The relevant conditions of the foot note mentioned at the end of these items/chapter applies. For 3 days
Hire charges for erection and removal of barricading with MS pipes at required places with MS pipes of 40mm diameter using 2.45 m long verticals and 3 to 6 metres horizontals. The barricading provided such that it shall be 2m above ground level and 0.45 m pipe embedded in the ground with necessary earth work excavation in all soils up to 0.45m to 0.60 m depth (except rock requiring chiselling). The Horizontals shall be in 3 rows one at 0.50 metres from bottom and balance two rows at 0.70 metres intervals leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading unloading erection, removal etc., including conveyance charges to site (both ways ) and removing the same after completion of the festival and taking away the material etc.,duly refilling the pits and levelling the surface etc.,complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to avoid exposure of sharp edges. The rate quoted is including conveyance of all materials and labour charges for fixing etc.,complete
Hire charges for providing Plastic/Aluminium/Stainless steel water drums of storing capacity not less than 200 Ltrs including loading and unloading. *The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete . *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
Labour required for attending various miscellanious works as and arise during the execution of the work
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc., including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution. For 1 day
Hire charges for providing Rain proof shelters of different spans with clear height of 16' at the ends and suitable height at centre with central unsupported span of ranging 60' to 80'. The shelter shall be provided with adequate MS girders, MS trusses, MS purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc. The entire roof shall be covered suitably with GI sheet/Aluminium sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drained. (This rate is applicable when structure is provided using roof trusses.).*Necessary rain water collection facility and drainage arrangement shall be made. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . (The rate for pendals will be paid as per area of pendals measured on covering plan area). * The relevant conditions of the foot note mentioned at the end of these items applies. For 3 days
Hire charges for erection and removal of MS pipes Pendals with MS pipes 40 mm dia for veridical, horizontals bracings and roofing. The pendals are firmly fixed with bracings and with necessary frame work/rope etc., and the roof covered with thick white ceiling cloth along with all round frills (jallars) including anchoring to the ropes to the ground with suitable anchoring and necessary watch and ward against theft and fire accidents and incidental charges etc. complete as directed during execution. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.(The rate for pendals will be paid as per area of pendals measured on covering plan area). Note:- If, there is any deviation in the usage of good quality of cloth effecting pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer-in-Charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies. -do- 2 days
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc., including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution . -do- For 2 days
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days .* The relevant conditions of the foot note mentioned at the end of these items/chapter applies. -do- For 2 days
"Hire charges for erection and removal of side curtains with white / colour design cloth and required frame work including using necessary bolts, nuts, etc., complete. The rate is including conveyance of all materials and labour charges for fixing and removal etc., complete .The Side curtains should be neat and with good appearance in all days , if spoiled in any manner and the same should be replaced immediately. The rate is for below mentioned calendar days .The rate is for below mentioned calendar days. The relevant conditions of the foot note mentioned at the end of these items/chapter applies. -do- For 2 days
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT -127.doc
TENDER_DOCUMENT • 0.70 MB
BOQ-127.xlsx
TENDER_DOCUMENT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].