Tender Value
₹11.5 L
EMD Value
₹11,549
Closing Date
16 Jun 2026, 3:30 pm
Executive Engineer R and B Division Anantapuramu
Opp Medical College Sai Nagar Anantapuramu
Annual Maintenance of State Highways in the Jurisdiction of (R&B) Section, Kanekal in Anantapuramu District for the year 2026-27
942064
NIT No.20/TO/2026-27, Dated 25.05.2026
OPEN - NCB
Civil Works
ANANTHAPUR
7 documents required · 7 mandatory
₹409
₹11,549
2 Jun 2026
2 Jun 2026
2 Jun 2026
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. .
Providing B.T. patch work for pot holes using 40 to 45mm HBG metal with required quantity of 10 to 12mm size HBG key chips and 42 Kgs of 80/100 grade bitumen per one cum of work for filling the pot holes including removal of loose material in the pot holes trimming the edges to provide form vertical faces cleaning applying tack coat filling the pot holes compacting and finishing including cost and conveyance of materials, T&P charges and all labour charges for all operations etc., complete for finished item of work as directed by the Engineer-in-charge in the following reaches.
Providing B.T. patch work for pot holes using 9.5mm to 11.20 mm HBG machine crushed metal with required quantity HBG key chips 5 to 7mm and 80/100 grade bitumen at 72 Kgs / 1 cum of work for filling the pot holes including removal of loose material in the pot holes, trimming the edges to provide form vertical faces, cleaning, applying tack coat, filling the pot holes compacting with power Road roller of 8 to 10 T and finishing including cost and conveyance of materials T&P charges and all labour charges etc., complete.
Clearing juliflora(prosafis)Jungle including up rooting and removing of juliflora stumps for use as directed during execution by the departmental officers etc.complete for finished item of work.
Stripping the excess soil from the shoulders surface to achieve the approved level for sectioning the beam /Shoulders as per MORT&H Specification No.3003
Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., complete for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Forming Shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, (1 Km from the work soil) depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 TonnesSmooth wheeler Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)
Forming Shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision)
Providing Vibrated Cement Concrete (1:3:6) using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200 (5th Revision) and as directed by the Engineer-in-Charge for Body walls.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ(20).xls
TENDER_DOCUMENT • 2.27 MB
DTS-(20).doc
TENDER_DOCUMENT • 0.59 MB
NIT 20 SH KANEKAL SECTION.xlsm
TENDER_DOCUMENT • 0.18 MB
Download all tender documents and submit your bid