Loading…
Loading…
Tender Value
₹10.4 L
EMD Value
₹13,100
Closing Date
29 Sept 2026, 4:30 pm2d left
Public Works Department
PRAVEEN R HULJI
Annual maintenance of the Sampagaon-Bailahongal Via Chivatgundi-Bailawada, Bailawada Varti from km. 0.00 to 10.00 km, 10.145 to 14.69 and km. 14.90 to 15.53 in Bailahongal Taluk for the year 2026-27(Reserved for ST Category only).
PWD/2026-27/RD/WORK_INDENT42044
PWD/2026-27/RD/WORK_INDENT42044
Reserved
Roads
Electronic Documents, First(One Cover)
PWD Division Office Belagavi
9 documents required · 9 mandatory
₹500
₹13,100
12 Sept 2026
12 Sept 2026
28 Sept 2026
Name of the Road : ANNUAL IMPROVEMENTS TO Sampgaon - Bailhongal via Chivatagundi - Bailwad, Bailwad Varti from km 0.00 to 16.13 in Bailhongal taluka of Belagavi Dist Road ID:BAI233 Road Length:15.920 Km
Road Category: MDR ID NO.BAI 223 Sub Division : Bailhongal Division : Belagavi Circle : Belagavi
Start - Lattitude:15.7956 Longitude:74.7617 End - Lattitude:15.8081 Longitude74.8254
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
Sampagaon village Limits Nagnur village Limits Bailwad Village
Non Feasible Length More than 5 Year Developed Length NFL
NO WORKS DONE UNDER ANY HEAD IN LAST FIVE YEARS
5.50 m 3.75 m Overlap Length PRAMC Work in DLP
More than 5 Years Non Feasible Length More than 5 Years NFL More than 5 Years Overlap Length PRAMC Work in DLP
Legends Desciption Silent Features 1). Completed Works and under DLP 4) On going works
Completed Works & Under DLP Lane Width Details Total Length (in Km) HEAD OF ACCOUNT From To Provisions (RC,Wd,ST, Ren) L (in Km) HEAD OF ACCOUNT From To Provisions L (in Km)
Annual Maintenance Less than 5 years Single Lane 0 TO 5.6 5.60 PRAMC 15.53 16.130 - 0.600 SCP - - - -
Annual Maintenance More than 5 years Single Lane 6.51 TO 9 2.49 Total Length (in Km) 0.600 Total Length (in Km) 0.000
Work Under progress Single Lane 9 TO 14.69 5.69
Single Lane 14.9 TO 16.13 1.23 2).Maintenance for 2026-27 5) Eligible for Renewal
Major Bridges Intermediate lane 5.6 TO 6.51 0.91 HEAD OF ACCOUNT From To Provisions L (in Km) HEAD OF ACCOUNT From To Provisions L (in Km)
Minor Bridges Major Bridges - - 3054 0.000 7.800 Maint 7.800 APPENDIX-E Renewal - - - -
CD Minor Bridges - - 7.800 10.000 Maint 2.200 Total Length (in Km) 0.000
Village/ City Name Railway Crossing - - 10.000 10.145 Maint 0.145
Railway Crossing Overlap Length 14.69 TO 14.9 0.21 11.000 14.690 Maint 3.690
Non Feasible Length Total Length (in Km) 15.92 14.90 15.53 Maint 0.630
Total Length (in Km) 15.320
Village/City Limit Other Department Works 3) Proposed works under Annual Works 2022-23 2026-27 Maintenance Abstract
Name of Village/ City From To L (in Km) Under From To L (in Km) HEAD OF ACCOUNT From To Provisions L (in Km) Description Length(km)
SAMPGAON village 0.00 1.10 1.10 PRAMC 15.53 16.13 0.60 Appendix-E - - - - DLP 0.600
NAGNOOR village 5.40 6.85 1.45 KSHIP 0.00 Total Length (in Km) - More than 5 years Developed length 12.27 Assistant Executive Engineer, Executive Engineer,
Bailwad village 14.30 14.69 0.39 SHDP 0.00 Total Maintenance length 12.27 P.W. Department, P.W. Department,
- Total Length (in Km) 0.60 Non Feasible length 3.05 Sub - Division, Bailhongal. Division, Belagavi
Total Length (in Km) 2.940 Total Length of the Road 15.92
PUBLIC WORKS DEPARTMENT
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, BELAGAVI DIVISION, BELAGAVI
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT, SUB-DIVISION, BAILHONGAL.
: Head of Account :
3054-04-337-1-10-200 MDR Maintenance for the year 2025-26
: Name of Work : NAME OF WORK:
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು"
ESTIMATED COST : Rs 12.32 Lakhs.
HalagaTigadiTarihal road from Km 8.80 to19.15 SH31 to Gaddikoravinakoppa road from Km 0.00 to 6.20 Sampagoan MK Hubli via Pattihala KS from Km 0.00 to 0.39 and From Km 5.42 to 11.32 Approach road to SH-31 from Kallurfrom Km 0.00 to 0.65 Road Joining SH 138 to SH 31 Via Lakkundi Nagnanur From Km. 0.00 to Km. 7.00 Navalagatti p kendra to Hiremale P Kendra from Km 0.00 to 5.50 Pattihala K S to Neginhala from Km 0.00 to 5.00 Sampagoan Bailhongal via Chivatagundi from Km 0.00 to 4.00,from Km 6.00 to 15.53 & from Km 14.90 to 14.93 Deshnoor-Mattikoppa from Km 0.00 to 2.38 from Km 3.09 to 5.50Hanabaratti to Ramalingappanakolla from Km 0.00 to 5.00 Madhanabhavi-somanatti from Km 0.00 to 5.00 Hanumanatti-Hiremale via Bairanatti, Hannikeri from Km 0.00 to 7.00 Nesaragi Somanatti from Km 0.175 to 0.450, From Km 5.75 to 6.90 and From Km 7.05 to 8.50 Vannur-SH-31 via Sunakumpi from Km 0.00 to 11.00 of Bailhongal Taluka
PARAGRAPH 130(A) OF THE KARNATAKA PUBLIC WORKS
DEPARTMENTAL CODE.
E S T I M A T E.
Division. : Executive Engineer, PW Dept. Belagavi Division, Belagavi
Sub-Division . : AEE, PWD Sub-Dn. Bailhongal.
Fund Head. : 3054-04-337-1-10-200 MDR Maintenance for the year 2025-26
Service Head. :
Departmental Head. :
Estimate framed in the office of the Assistant Executive Engineer, P.W.D. Sub-Division, Bailhongal and probable expenses that will be incurred for the work of 2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು" For the Year 2025-26 Under HoA 3054-04-337-1-10-200 MDR Maintenance
Estimated Cost. : Rs.12.32 Lakhs
Administratively sanctioned under : No.____________Date ___________
Technically sanctioned under : No.____________Date ___________
Estimate Prepared by : Shri. Shashank Giregol, AE
Estimate Checked by : Shri.Anil M, AEE
(Call or Authority) :
" Separate Sheet Enclosed "
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು"
P.W.D. CODE PARA-133
C E R T I F I C A T E
This to certify that, Anil M, Assistant Executive Engineer, have personally visited the spot and prepared the estimate using sanctioned scheduled of rates provided for the most economical and safe way of executing work.
Assistant Executive Engineer
Public Works Dept.,
Sub division, Bailhongal.
C E R T I F I C A T E
(As required vide G.O.No.PWD.SL.CMS.96 Dtd: 27-6-1991)
Certified that, sufficient care has been taken while preparing the estimate in respect of the above mentioned work to see that all necessary items which are technically required for the work in sufficient quantity are included while preparing the estimate, and specification of items included are completed and correct.
Assistant Executive Engineer
Public Works Dept.,
Sub division, Bailhongal.
C E R T I F I C A T E
Certified that, the work proposed in this estimate has not been taken up under any other head / programme by any agency. The said work has not been included / proposed / over lapped in any other proposed or approved programme.
Assistant Executive Engineer
Public Works Dept.,
Sub division, Bailhongal.
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು"
ಬೈಲಹೊಂಗಲ ಉಪವಿಭಾಗದ 2026-27 ನೇ ಸಾಲಿನ 2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು" ಕಾಮಗಾರಿಯು 2026-27 ನೇ ಸಾಲಿನ ಲೆಕ್ಕ ಶೀರ್ಷಿಕೆ : 3054-04-337-1-10-200 ಜಿಲ್ಲಾ ಮುಖ್ಯ ರಸ್ತೆ ನಿರ್ವಹಣೆ ಅನುದಾನದಡಿ ರೂ. 12.32 ಲಕ್ಷಗಳಿಗೆ ಕಾರ್ಯಕ್ರಮ ಪಟ್ಟಿಯಲ್ಲಿ ಅನುಮೋದನೆಗೊಂಡಿರುತ್ತದೆ. ಸದರಿ ರಸ್ತೆಯ ಭಾಗಗಳಿಗೆ ನಿರ್ವಹಣೆಗಾಗಿ ಈ ಕೆಳಕಂಡ ಅಂಶಗಳನ್ನು ಅಳವಡಿಸಿ ಅಂದಾಜು ಪತ್ರಿಕೆಯನ್ನು ತಯಾರಿಸಲಾಗಿದೆ. NFL ಸರಪಣಿಗಳಲ್ಲಿ ಡಾಂಬರಿನಿಂದ ತಗ್ಗು ಗುಂಡಿಗಳನ್ನು ತುಂಬಲು ಬಾರದಿರುವದರಿಂದ ಅಂದಾಜು ಪತ್ರಿಕೆಯಲ್ಲಿ ಡಾಂಬರ ಪಾಟಹೊಲ್ ಐಟಂನ್ನು ಪರಿಗಣಿಸುವದಿಲ್ಲ ಮತ್ತು NFL ಸರಪಣಿಗಳಲ್ಲಿ ಆಯ್ದಭಾಗಗಳಲ್ಲಿ ಮುರಂನಿಂದ ಗುಂಡಿ ತುಂಬಲಾಗುವುದು. ಜಂಗಲ್ ಕಟ್ಟಿಂಗನ್ನು 2 ಬಾರಿ ಪರಿಗಣಿಸಲಾಗಿದ್ದು(Pre Mansoon and Post mansoon) ಮತ್ತು ಡಾಂಬರಿನಿಂದ 3% ವರೆಗೆ ತಗ್ಗು ಗುಂಡಿ ತುಂಬಲಾಗುವುದು.
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
ಸದರಿ ಅಂದಾಜು ಪಟ್ಟಿಯನ್ನು 2023-24 ನೇ ಸಾಲಿನ (2026-27 ಕ್ಕೆ ಮುಂದುವರೆದ) ಲೋಕೋಪಯೋಗಿ ಇಲಾಖೆ, ಏಕರೂಪ ದರಪಟ್ಟಿಯಂತೆ ದರಗಳನ್ನು ಅಳವಡಿಸಿ ರೂ. 12.32 ಲಕ್ಷಗಳಿಗೆ ತಯಾರಿಸಿ ತಾಂತ್ರಿಕ ಮಂಜೂರಾತಿಗಾಗಿ ಸಲ್ಲಿಸಲಾಗಿದೆ.
Assistant Executive Engineer, Executive Engineer,
PWD, Sub Division Bailhongal PWD, Division Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು"
Recaptulation sheet
Sl. No. Description Amount
1 For Annual Maintenance Rs. 1,043,034.02 1043031.64
4 Add for Misc & Rounding off Rs. 1,219.85 1222.66
Grand Total Rs. 1232000.00
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Divn Bailhongal Public Works Dept., Divn Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು"
ESTIMATE (ABSTRACT)
Sl. No. Description of Item Unit Qty. Rate Amount
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. 100 m2 603.85 393.00 237313.05
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. m 9105.00 6.00 54630.00
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . m2 910.50 39.00 35509.50
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . m2 505.40 97.00 49023.32
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 284.53 388.00 110398.13
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. m2 853.59 635.00 542032.03
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . m2 45.00 27.00 1215.00
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. No 5.00 2047.00 10235.00
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Km 13.00 206.00 2678.00
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು"
Km to Km Length
SL No Description of work Unit No Measurement Qty
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,.
Net Qty in 100 m2 603.85
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908.
Net Qty 9105.00
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, .
m2 Total Qty 910.50
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. .
m2 Total Qty 505.40
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification.
m2 Total Qty 284.53
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification.
m2 Total Qty 853.59
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, .
White washing to CDs
Total Qty 45.00
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,.
Repairs & vent clearance to CDs
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint.
Total Qty 13.00
Assistant Executive Engineer, Executive Engineer,
PWD, Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
2026-27 ನೇ ಸಾಲಿನ ಬೈಲಹೊಂಗಲ ತಾಲೂಕಿನ ಸಂಪಗಾಂವ-ಬೈಲಹೊಂಗಲ ವ್ಹಾಯಾ ಚಿವಟಗುಂಡಿ-ಬೈಲವಾಡ, ಬೈಲವಾಡ ವರ್ತಿ ಕಿ.ಮೀ. 0.00 ರಿಂದ ರಿಂದ 10.00 ಕಿ.ಮೀ, 10.145 ರಿಂದ 14.69 ವರೆಗೆ ಹಾಗೂ ಕಿ.ಮೀ. 14.90 ರಿಂದ 15.53 ರವರೆಗೆ ವಾರ್ಷಿಕ ನಿರ್ವಹಣೆ ಮಾಡುವುದು"
S No Description of work SR Vol Page No Item No Basic Rate Area Wtage 0% Add 18% for GST Finished Rate Unit
1 Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. a In area of light jungle,. Vol-III 9 2.5 a 393.00 0.00 0.00 393.00 100 m2
2 Maintenance of Drains The maintenance of drains include erosion, repair,clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Vol-III 147 16.19 6.00 0.00 0.00 6.00 m
3 Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, . Vol-III 91 10.3 39.00 0.00 0.00 39.00 m2
4 Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. . Vol-III 91 10.2 97.00 0.00 0.00 97.00 m2
5 Patching of Shallow Potholes using SDBC Gr II 25 mm thick Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The Cost is inclusive of removing the failed materials & cleaning on the road surface, preparation of potholes to the required standards sizes before patching them and application of tack coat at 0.20 kg/m2 over the asphalt surface including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (i) 388.00 0.00 0.00 388.00 m2
6 Patching of Deep Potholes 75mm thick by restoring the Granular Base course using material confirming to WBM Grade -II with B type Screenings standards wherever necessary by manual means including trimming the pothole to the required shape and size, cleaning the pothole, applying Prime Coat (SS1) at 0.70 kg per m2 over the WBM surface and covering the surface with SDBC 25mm thick including lead, loading unloading, rolling and finishing etc., complete as per specification. Vol-III 93 10.15 (ii) 635.00 0.00 0.00 635.00 m2
7 White washing of parapet walls of CD work and tree truncksWhite washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1916, . Vol-III 148 16.26 27.00 0.00 0.00 27.00 m2
8 Maintenance of Culverts Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1909,. Vol-III 147 16.20 (i) 2047.00 0.00 0.00 2047.00 No
9 Maintenance of 200 m & km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 m & km stone and 5th km stone as per drawing and technical specification.Painting two coats with synthetic enamel paint. Vol-III 148 16.24 (i) 206.00 0.00 0.00 206.00 Km
Assistant Executive Engineer, Executive Engineer,
Public Works Dept., Sub-Dn. Bailhongal Public Works Dept., Dn. Belagavi
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
40 Barchart SAMPGOAN BAILHONGAL VIA CVTGUNDI.xlsx
Others - 40 Barchart SAMPGOAN BAILHONGAL VIA CVTGUNDI.xlsx • 0.04 MB
Formats and govt GOs.zip
Others - Formats and govt GOs.zip • 20.38 MB
42044 BID DOC ST KW-1.doc
Tender Document • 1.61 MB
MDR Approved programme 2026-27.pdf
Others - MDR Approved programme 2026-27.pdf • 8.49 MB
Sampagav Bailhongal Via Nagnur Chivatagundi Bailwad Photos.pdf
Others - Sampagav Bailhongal Via Nagnur Chivatagundi Bailwad Photos.pdf • 8.40 MB
MDR Pkg 11 Sampagav Bailhingal via Nagnur.xlsx
Others - MDR Pkg 11 Sampagav Bailhingal via Nagnur.xlsx • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .