| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.0 L+₹40,844 (5.38%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹8.0 L+₹44,504 (5.86%)Rejected-AOC CHELAMATTOM VALLAM KARAYIL HOUSE | KANNUR | KERALA | 670511 | L3 | Rejected-AOC Rejected | |
| 4 | L4₹8.2 L+₹57,499 (7.57%)Rejected-AOC | L4 | Rejected-AOC Rejected | |
| 5 | L5₹8.3 L+₹66,552 (8.76%)Rejected-AOC | L5 | Rejected-AOC Rejected |
Tender Value
₹9.5 L
EMD Value
₹23,750
Closing Date
2 Sept 2019, 2:00 pmClosed
Assistant Executive Engineer (Agri),
Office of the Assistant Executive Engineer (Agri), Kottayam
Kottayam Zillapanchayath 2019-20 - Construction of bund and protection of side wall at State Seed Farm Kozha. Project No. 426/19-20
2019_AGRI_294789_1
AE(3)655/2019/S
Open Tender
Miscellaneous Works
Item Rate
180 days
Kozha
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,240
online
₹23,750
9 Jan 2020
22 Aug 2019
4 Sept 2019
22 Aug 2019
2 Sept 2019
22 Aug 2019
22 Aug 2019 - 2 Sept 2019
Amount
Construction of bund and side protection
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
od1742/2019_2020 : odified Data7.1.1<br> Random rubble masonry with hard stone(excluding bond stone) in foundation and plinth with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:<br>Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
od1735/2019_2020 : Modified data 51.2.2<br>Supplying and filling at site with good quality earth suitable for filling brought from out side, levelling the top at site and banking in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m.
GEORGE JOHN
GEORGE JOSEPH
SABU SEBASTIAN
SAJU.V.S
C J Joy
Bidder Name
GEORGE JOSEPH
C J Joy
SAJU.V.S
SABU SEBASTIAN
GEORGE JOHN
ANOOPKUMAR P R
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_402049.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .