Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC LINE JEEVANGARH AMBARI DISTT DEHRADUN | ₹1.7 Cr Quoted ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹49,328.95 (0.35%)Rejected-Finance | ₹1.4 Cr+₹49,328.95 (0.35%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | HILL VALLEY CONSTRUCTION L2 | M/S KUNWAR SINGH NEGI L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation of soil, stone, boulders | 830.57 | M3 | 400 ₹3,32,228 | 350 ₹2,90,699.5 Lowest |
| 2.00 | Random Rubble Stone Masonry in 1:6 | 244.64 | M3 | 4,800 ₹11,74,272 Lowest | 4,800 ₹11,74,272 Lowest |
| 3.00 | RCC M-20 | 743.91 | M3 | 8,080 ₹60,10,792.8 Lowest | 8,081.8 ₹60,12,131.84 |
| 4.00 | Supplying, Fitting and placing HYSD/TMT reinforcement in foundation | 70.08 | Ton | 65,500 ₹45,90,240 Lowest | 65,875.3 ₹46,16,541.02 |
| 5.00 | Hand Packed stone filling | 32.5 | M3 | 1,030 ₹33,475 | 1,025 ₹33,312.5 Lowest |
| 6.00 | Dewatering from foundation & abutments and wing wall (with pump capacity 4000 ltr per Hr.) | 240 | Hrs | 247 ₹59,280 | 230 ₹55,200 Lowest |
| 7.00 | Plastering with cement mortar (1:4) 15 mm thik | 280 | M2 | 223 ₹62,440 Lowest | 223.5 ₹62,580 |
| 8.00 | Sighnboard & Photography | 1 | Nos | 2,000 ₹2,000 Lowest | 2,000 ₹2,000 Lowest |
| 9.00 | Excavation of soil, stone, boulders for trenches Dug pounds RR dry wall | 590.63 | Cub | 400 ₹2,36,252 | 350 ₹2,06,720.5 Lowest |
| 10.00 | RR Dry for wall, Dug pound | 319.68 | Cub | 3,007 ₹9,61,277.76 | 3,000 ₹9,59,040 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
10 Jun 2026, 1:00 pmClosed
SE MI Pauri
Near Shivalik Hotel Pauri, Pauri Garhwal
On Stream Treatment Plan of Hyunil River Part-03
2026_MI_95744_2
85/SE-MI/Pauri
Open Tender
Civil Works - Others
Item Wise
Yamkeshwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
EE MI Pauri
₹3.4 L
26 Jul 2026
22 May 2026
10 Jun 2026
22 May 2026
10 Jun 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of soil, stone, boulders | 830.57 | M3 | 400.8 | ₹3,32,892.46 |
| 2 | Random Rubble Stone Masonry in 1:6 | 1 | M3 | 4,807.6 | ₹4,802.79 |
| 3 | RCC M-20 | 1 | M3 | 8,081.8 | ₹8,073.72 |
| 4 | Supplying, Fitting and placing HYSD/TMT reinforcement in foundation | 1 | Ton | 65,875.3 | ₹65,809.42 |
| 5 | Hand Packed stone filling | - | M3 | 1,039 | - |
| 6 | Dewatering from foundation & abutments and wing wall (with pump capacity 4000 ltr per Hr.) | - | Hrs | 247.1 | - |
| 7 | Plastering with cement mortar (1:4) 15 mm thik | - | M2 | 223.5 | - |
| 8 | Sighnboard & Photography | - | Nos | 2,000 | - |
| 9 | Excavation of soil, stone, boulders for trenches Dug pounds RR dry wall | 1 | Cub | 400.8 | ₹400.4 |
| 10 | RR Dry for wall, Dug pound | - | Cub | 3,007.9 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_113184.xls
BOQ • 0.31 MB
Hyunilgad03.pdf
Tender Documents • 1.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .