Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.4 LAdmitted-Finance | -37.00% | ₹20.4 L | L1 | Admitted-Finance |
| 2 | L2₹21.9 L+₹1.5 L (7.43%)Admitted-Finance | -32.32% | ₹21.9 L+₹1.5 L (7.43%) | L2 | Admitted-Finance |
| 3 | L3₹23.7 L+₹3.2 L (15.9%)Admitted-Finance F1 B BLOCK HOMETECH MADHURA APARTMENT F1 B BLOCK F1 B BLOCK HOMETECH MADHURA APARTMENT LAKE VIEW GARDEN PERUMAL KOIL STREET NORTH KORATTUR CHENNAI THIRUVALLUR TAMIL NADU 600076 PERUMAL KOIL STREET | CHENNAI | TAMIL NADU | 600076 | -27.00% | ₹23.7 L+₹3.2 L (15.9%) | L3 | Admitted-Finance |
| 4 | L4₹24.9 L+₹4.5 L (22.2%)Admitted-Finance | -23.00% | ₹24.9 L+₹4.5 L (22.2%) | L4 | Admitted-Finance |
| 5 | L5₹25.9 L+₹5.5 L (27.0%)Admitted-Finance KACHCHH GUJARAT 370201 INDIA UDYAM GJ 13 0011285 | KACHCHH | GUJARAT | 370201 | -20.00% | ₹25.9 L+₹5.5 L (27.0%) | L5 | Admitted-Finance |
Tender Value
₹32.4 L
EMD Value
₹76,500
Closing Date
14 May 2026, 3:00 pmClosed
Executive Engineer (MW)
Office of the Executive Engineer, New Mangalore Port Authority, Panambur, Mangalore
Witnessing and Certifying the pre and post hydrographic survey work as a third party agency for the Maintenance Dredging at NMP for the year 2026-27, 2027-28 and 2028-29 (3 Years)
2026_NMPT_903496_1
CIVIL/CE(C)/EE(C)/117/2025-26
Open Tender
Civil Works
Percentage
1095 days
New Mangalore Port Authority, Panambur, Mangalore
As per tender document
6 documents required · 6 mandatory
₹560
Yes
As per tender condition
₹76,500
Yes
18 Jun 2026
24 Mar 2026
15 May 2026
24 Mar 2026
14 May 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ perticulars | |||||
| 1.01 | Providing Third party inspection service during swath bathymetric survey including supervising calibration of equipments, data processing, chart preparation and its certification for each season during Pre- dredge survey period (30days survey, chart preparation & certifying+2 days mob and demob) and during Post- dredge survey period (30+2days) Cost including Travel, accommodation and food expenses etc., Pre & Post Dredge survey for the year 2026-27 | - | Days | - | - |
| 1.02 | Providing Third party inspection service during swath bathymetric survey including supervising calibration of equipments, data processing, chart preparation and its certification for each season during Pre- dredge survey period (30days survey, chart preparation & certifying+2 days mob and demob) and during Post- dredge survey period (30+2days) Cost including Travel, accommodation and food expenses etc., Pre & Post Dredge survey for the year 2027-28 | - | Days | - | - |
| 1.03 | Providing Third party inspection service during swath bathymetric survey including supervising calibration of equipment's, data processing, chart preparation and its certification for each season during Pre- dredge survey period (30days survey, chart preparation & certifying+2 days mob and demob) and during Post- dredge survey period (30+2days) Cost including Travel, accommodation and food expenses etc., Pre & Post Dredge survey for the year 2028-29 | - | Days | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
HydrographicSurveyTD.pdf
Tender Documents • 2.12 MB
BOQ_949670.xls
BOQ • 0.38 MB
Replytoprebidqueries_corrigendum.pdf
PDF • 0.91 MB
ExtensionOfDueDate_28042026.pdf
PDF • 0.19 MB
EXtensionOfBidDueDate13_04_2026.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .