SUPERINTENDING ENGINEER
SE OFFICE EDC PITHORAGARH
Construction of 5.95 KM 11 KV 0.06 Km LT line AND 1x25 KVA LT SUB STATION and Protection wall for 11 KV pole structure for Electrification of Lorhi Temple in Didihat Section under Electricity Distribution Division Dharchula
2023_UPCL3_53822_1
25/EDC(P)/2022-23
Open Tender
Electrical Works
Item Rate
120 days
DIDIHAT
PLEASE REFER UPLOADED TENDER DOCUMENTS
2 documents required · 2 mandatory
₹2,360
EE EDD UPCL PITHORAGARH
₹75,000
29 Sept 2023
11 Jan 2023
28 Jan 2023
11 Jan 2023
27 Jan 2023
11 Jan 2023
Amount
Labour Work/Erection Part
Cartage of following materials from store centre to construction site with loading & unloading at both points approx distance 65 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.0 mtr. SP-21 (BPHD)
Other material
T/F 11/0.4 25 KVA
Head load cartage of following material from road to site approx distance 8 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.0 mtr. SP-21 (BPHD)
Other material
T/F 11/0.4 25 KVA
Exavation of foundation pit for erection of double pole support as per RESSPO specification of the following types of poles in boulder mixed soil, grouting of support in CC 1:4:8 block incuding cost of ballast,cement and sand, back filling of soil and boulders in pit and ramming filling of accessories of the pole, leveling and erection of pole
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.0 mtr. SP-21 (BPHD)
erection of pole support as per RESSPO specification of the following types of poles in boulder mixed soil, grouting of support in CC 1:4:8 block incuding cost of ballast,cement and sand, back filling of soil and boulders in pit and ramming filling of accessories of the pole, leveling and erection of pole
SP-21 Single Pole
SP-23 Double Pole
SP-23 Single Pole
Grouting of following pole in size 0.45x0.45x1/6 of the support in CC ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling.
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.0 mtr. SP-21 (BPHD)
Muffing of poles with CC1;3;6 block and 45 Cm hight from ground level including cost of ballast, cement & sand
Fabriction of MS Channel, angle iron after cutting in requeired sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESSPO
Exavation of earth for stay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work..(252X0.432)
Fixing, tightening and nozzling of stay with pole and stay rod for 11 KV
Fixing, tightening and nozzling of stay with pole and stay rod for LT line
Grouting of stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling.
Erection & earthing of support with MS Earth rod of 2.5 Mtr long incuding exavation of pit and digging of MS rod proper depth and connecting the earth electrode with the GI wire as per instruction manual
Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the weasel covered conductor with ACSR weasel earth wire complete including fixing of all accessories in 2 Nos conductor in parallel with binding and jupering as per profile and sagging chart
Laying, sagging & binding of AB cable LT line complete
3 Phase AB cable
Earthing of distribution T/F incuding digging of pit of size 2.5 mtr depth and make hole of size 150mm. Placing of earthing electrode(to be supplied by contractor as per drawing No A) as drawing B, connecting the same with GI strip(to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum length 6 mm, treatment of soil with highly conductive subustance as per IS 30343 complete in all respect, result of earthing resistance to be recorded in MB before and after instalation of earthing. the earth resistance after earthing should be less then 1 Ohm.
Mounting/fixing of TPMO on doble pole structure including making of connection complete work.
Mounting/fixing of fuse set on doble pole structure including making of connection complete work.
Mounting & fixing of LA set(3 No) on double pole structure including making all connection vy GI strip size 35x6 mm to earth point(incuding cost of GI strip)
T-off connection complete
Installation/Mounting 25 KVAT/F on D/P structure and fixing of channel and making all connections of HT and LT and its complete commissioning.
Route clearance by cutting of tree branches/ proning, loping and chopping of trees for 11 KV line
Construction of 14 No protection wall for 11 KV Structure
Excavation in all type of soil including ramming and dressing of surface 14x5.45
Base concreting in 1:6:12 cc 14x1.8
R&R Stone Massonary in 1:6 course fine sand & cement 14x14.99
Top concreting in 1:2:4 cc 14x0.45
HP Stone Filling 14x3.4
M/s Shahi Electricals
MEHTA CONSTRUCTION AND SUPPLIERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .