Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-AOC D NO 35 14 13 1 RP PETA GAVARA KANCHARAPALEM VISAKHAPATNAM 530008 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530008 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹31.8 L+₹46,760 (1.49%)Rejected-Finance D NO 65 6 500 2 MULAGADA COLONY HIMACHALNAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹33.3 L+₹2.0 L (6.28%)Rejected-Finance MIG 330 MADHAVADHARA VUDA COLONY VISAKHAPATNAM 530 018 | VISAKHAPATANAM | ANDHRA PRADESH | 530018 | L3 | Rejected-Finance Being not L1 | |
| 4 | Rejected-Technical 7 32 1 PRASANTHI NAGAR GOPALAPATNAM VISAKHAPATNAM 530 027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | - | Rejected-Technical Being not enlisted in appropriate category |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
23 Jun 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIR / MAINT OF CENTRAL / PACKAGE TYPE AC PLANTS INCLUDING CERTAIN MISC WORKS AT INHS KALYANI UNDER AGE E/M NO-I OF GE (U-I) ,VISAKHAPATNAM
2021_MES_446189_1
8318/E8
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
Garrison Engineer Utility-I Visakhapatnam
CLASS D
10 documents required · 10 mandatory
₹500
Garrison Engineer Utility-I
₹96,000
Yes
8 Sept 2021
27 May 2021
29 Jun 2021
27 May 2021
23 Jun 2021
11 Jun 2021
60 days
Amount
M & L for de-scaling the shells and tube condenser by circulating the RA111 organic compound at the appropriate ratio depend upon the scale deposits till removal of all the scale inside the copper tubes and removal of the both end covers, brushing with nylon brush, removal of all scale and degreasing with caustic soda, flushing out thoroughly, re-fixing the end covers with new gasket packing, nut and bolts and connecting the inlet and out let water connection checking of water leaks, all specified and directed.
M&L for servicing the Air handling units 8000cfm capacity (central AC 130 TR), with and including dismantling units, sheet metal parts, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve; greasing of blower motor, checking of electrical connection, cleaning of air filters,greasing of blower motor,replacement of un serviceable bearings, water drain lines, renewal of rusted sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the unit all as specified and as directed by Engineer-in-Charge.
M&L for servicing the Air handling units 12000cfm capacity (central AC), with and including dismantling units, sheet metal parts, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve; greasing of blower motor, checking of electrical connection, cleaning of air filters,greasing of blower motor,replacement of un serviceable bearings, water drain lines, renewal of rusted sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the unit all as specified and as directed by Engineer-in-Charge.
M&L for servicing the Air handling units of 5200cfm capacity (centra AC), with and including dismantling units, sheet metal parts, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve; greasing of blower motor, checking of electrical connection, cleaning of air filters, water drain lines, renewal of rusted sheet metal screws,greasing of blower motor,replacement of un serviceable bearings, applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the unit all as specified and as directed by Engineer-in-Charge.
Repair and servicing to Reciprocating Compressor of Capacity 11 TR unit labour only for overhauling and servicing of AC compressor by strip opening of both end covers, cylinder head, cylinders connecting rod crank shaft, oil pump, side covers of bush bearing/ bush bearings etc complete. Inspecting the parts for serviceability and replacement only unserviceable worn out parts in the compressor, cleaning the System with Nitrogen gas for leak detection after flushing out the system vacuumization and charging only refrigerant gas, replacement of compressor oil and testing the unit on no load and full load condition all as directed by Engg-in-Charge.
Repair and servicing to Reciprocating Compressor of Capacity 8.5 TR unit labour only for overhauling and servicing of AC compressor by strip opening of both end covers, cylinder head, cylinders connecting rod crank shaft, oil pump, side covers of bush bearing/ bush bearings etc complete. Inspecting the parts for serviceability and replacement only unserviceable worn out parts in the compressor, cleaning the System with Nitrogen gas for leak detection after flushing out the system vacuumization and charging only refrigerant gas, replacement of compressor oil and testing the unit on no load and full load condition all as directed by Engg-in-Charge.
Repair and servicing to Reciprocating Compressor of Capacity 5.5 TR unit labour only for overhauling and servicing of AC compressor by strip opening of both end covers, cylinder head, cylinders connecting rod crank shaft, oil pump, side covers of bush bearing/ bush bearings etc complete. Inspecting the parts for serviceability and replacement only unserviceable worn out parts in the compressor, cleaning the System with Nitrogen gas for leak detection after flushing out the system vacuumization and charging only refrigerant gas, replacement of compressor oil and testing the unit on no load and full load condition all as directed by Engg-in-Charge.
M&L for complete servicing the condensing unit of 5.5 TR (Package Air conditioning unit ductable type), with and including dismantling the condensing units sheet metal body, blowing out the dust, spraying the organic based scale removing agent of Vaniklin at the appropriate ratio to the condenser fan area, till removal of complete scales & dust, flushing through for proper air flow across the coil, checking of all electrical connections, greasing of motor bearing, renewal of all corroded sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion, reassembling the sheet metal parts, and testing the unit all as specified and as directed by Engineer-in-Charge. Make: Carrier
M&L for servicing the Air handling units of 11 TR capacity (Package AC), with and including dismantling units, sheet metal parts, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion value; greasing of blower motor, checking of electrical connection, cleaning of air filters, water drain lines, renewal of rusted sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the unit all as specified and as directed by Engineer-in-Charge.
All as per Item No.09 herein before but Air handling units of 7000 cfm capacity (Central AC).
All as per Item No.09 herein before but Air handling units of 4500 cfm capacity (Central AC).
All as per Item No.09 herein before but for AHU of 5.5 TR package type AC.
M&L for complete leak testing the in door and out door units, complete refrigerant pipe with Nitrogen gas, locating the leaks, rectify the leak by brazing/ welding and pressure testing the complete system for the 5.5 TR capacity of air cooled package AC system all as specified and as directed by Engineer-in-Charge:
All as per item No.13 here-in-before but 11 TR capacity
M&L for complete leak testing the in door and out door units, complete refrigerant pipe with Nitrogen gas, locating the leaks, rectify the leak by brazing / welding and pressure testing the complete system for the 99 TR capacity of air cooled package AC system all as specified and as directed by Engineer-in-Charge:
M&L for complete leak testing the in door and out door units, complete refrigerant pipe with Nitrogen gas, locating the leaks, rectify the leak by brazing/ welding and pressure testing the complete system for the 120 TR capacity of air cooled package AC system all as specified and as directed by Engineer-in-Charge:
S&F PCB Board for 11 TR package type AC unit complete all as per instructins of OEM and as directed by Engr in charge complete
S&F condenser unit for 11 TR unit AC plant as per directed by Engr in charge complete
S&F out door unit fan blade for 11 TR unit complete
S&F out door unit fan blade for 5.5 TR unit complete
S&F out door unit fan blade for 8.5 TR unit complete
Supply and fix in repair " V "belts for AHU 120 TR SPA1120 . Make : Fenner
Supply and fix in repair " V "belts for AHU 120 TR SPA800 . Make : Fenner
Supply and fix in repair " V "belts for AHU 120 TR SPA1150 . Make : Fenner
Supply and fix in repair " V "belts for AHU 120 TR SPA1437 . Make : Fenner
Supply and fix in repair " V "belts for AHU 99 TR PIX A 76 . Make : Fenner
Supply and replace damaged/ defective/ unserviceable MS ERW pipe 150mm dia bore, heavy grade laid in trenches or on ground/ vertically with welded joints including removing the rusted, broken old MS pipe including painting with two coats of synthetic enamel paint over a coat of zinc chrome primer. Make:- TATA/ JINDAL
Supply and replace damaged /defective /unserviceable MS ERW pipe 100mm dia bore, medium grade laid in trenches or on ground/ vertically with welded joints including removing the rusted, broken old MS pipe including painting with two coats of synthetic enamel paint over a coat of zinc chrome primer. Make:- TATA/ JINDAL
S&F butterfly valve 150mm dia with necessary rubber gasket, bolts, nuts and washer including taking out existing valve all as directed Make: Zoloto / L&T/ Audco
S&F butterfly valve 150mm dia with necessary rubber gasket, bolts, nuts and washer including taking out existing valve all as directed Make: Zoloto / L&T/ Audco
S&F pressure gauge for condensor water pressure and chilled water pressure of 4 inch and with range of 0- 100 kg/cm2 including fixing accessory to existing pipe line complete all as directed.
Temprature gauge for condensor water line and chiller water line measuring with range of 20 to 50 degree celcius including fixing accessories to existing pipe line complete all as directed.
M&L for taking down air curtain 4/ 6 feet of any make and carryout complete servicing & necessary repair to grills, replacing defective bearings/ bushes greasing the motor and refixing in its original position & testing all as directed by Engineer-in-Charge.
M&L for taking down the defective unserviceable solenoid valve coil and supply & fixing of new solenoid valve coil suitable for 7/8” size valve, 220/230V 50 Hz all as directed by Engineer-in-Charge. Make: Danfoss/ Indfoss.
Servicing to compressor of mortuary cabinet of 2 TR capacity and takingout the compressor draining out old oil clean flushing and fill with cappila D oil and reassembling complete system including brazing wiring etc and testing the system as directed by Engineer-in-Charge.
M&L for complete checking of leaks, rectifying the leaks, pressure testing as per the standard practice and flushing out the system with Nitrogen gas for mortuary units all as directed by Engineer-in-Charge.
M&L for vacuumizing and de-hydrating the system, supply & charging of R-407 C gas, testing & commissioning the system, tuning the system to obtain and maintain the temp of –15°C all as directed by Engineer-in-Charge.
Taking down the defective sealed motor of air cooled condenser and supply & fixing of new sealed motor suitable for -2°C Mortuary Cooler condensing unit and testing all as directed by Engineer-in-Charge.
Taking down the defective sealed motor of air cooled condenser and supply & fixing of new sealed motor suitable for -15°C Mortuary Cooler condensing unit and testing all as direct by Engineer-in-Charge.
Taking down the defective sealed motor of evaporator and supply & fixing of new sealed motor suitable for -15°C evaporator fan and testing & commissioning all as direct by Engineer-in-Charge.
Taking down the defective sealed motor of evaporator and supply & fixing of new sealed motor suitable for -2°C evaporator fan and testing & commissioning all as direct by Engineer-in-Charge.
Taking down the damaged condenser fan blade of condensing unit of -2°C Mortuary Cooler and supply & fixing and testing of new suitable fan blade all as directed by Engineer-in-Charge.
Taking down the damaged condenser fan blade of condensing unit of -15°C Mortuary Cooler and supply & fixing and testing of new suitable fan blade all as directed by Engineer-in-Charge.
Taking down the damaged Evaporator fan blade of Evaporator unit of -15°C/ -2°C Mortuary Cooler and supply & fixing and testing of new suitable fan blade all as directed by Engineer-in-Charge.
Taking down the defective Auto defrost timer of -15 C Mortry unit and Supply & fix new auto defrost timer and testing the function all as dircted by Engineer- in Charge
S&F in replacement, HEPA filter of size 600x600x150mm (99% down to 3 microns) to match existing filters of capacity 1X120 TR. chiller all as directed. Make: Spectrum/ Carry air or equivalent.
S&F in replacement, HEPA filter of size 600x600x150mm (99% down to 3 microns) to match existing filters of capacity 1X99 TR. chiller all as directed. Make: Spectrum/ Carry air or equivalent.
S&F in replacement, Prefilter, box type of size 500x500x48mm (90% down to 10 microns) to match existing filters all as directed. Make: Spectrum/ Carry air or equivalent.
S&F in replacement, bag type fine filter of size 500x600x300mm (99% down to 5 microns) to match existing filters all as directed. Make: Spectrum/ Carry air or equivalent.
S&F in replacement, Prefilter, box type of size 500x500x30mm (99% down to 5 microns) to match existing filters all as directed. Make: Spectrum/ Carry air or equivalent.
M&L for complete servicing of FRP cooling tower by removal of complete scales, dirt etc. using chemicals, cleaning the sump, louvers, PVC fills, fan assembly, renewal of spray nozzles, renewal of nuts and bolts, and complete painting of the cooling tower as per the standard practice for 2 x 99 TR plant capacity cooling tower all as specified and directed.
S&F in replacement power contactor suitable for –15°C sealed compressor all as directed by Engineer-in-Charge.
M&L for repairing the –15°C Cold storage room insulated door, by replacing door beading, repair to door lock etc. all as required at site and as directed by Engineer-in-Charge.
M&L for complete servicing of FRP cooling tower by removal of complete scales, dirt etc. using chemicals, cleaning the sump, louvers, PVC fills, fan assembly, renewal of spray nozzles, renewal of nuts and bolts, and complete painting of the cooling tower as per the standard practice for 3 x 65 TR plant capacity (120 TR) cooling tower all as specified and directed.
Supply and charge refrigerant gas R134A including leak testing the system, arresting the leaks with necessary materials like gasket/ ‘O’ rings/ washers all as directed by Engineer-in-Charge. Make: Mafron/ Freon/ Floron
Supply and charge refrigerant gas R-22 including leak testing the system, arresting the leaks with necessary materials like gasket/ ‘O’ rings/ washers all as directed by Engineer-in-Charge. Make: Mafron/ Freon/ Floron
Supply and charge refrigerant gas R404A including leak testing the system, arresting the leaks with necessary materials like gasket/ ‘O’ rings/ washers all as directed by Engineer-in-Charge. Make: Mafron/ Freon/ Floron
M&L for dismantling defective induction motor of any make 415 V of any duty or any class of insulation from the bed duly coupled with pump, transporting to work shop, removing burnt out winding from statar, rotor and rewinding with suitable gauge super enameled copper wire of approved make and replacing driven end and non driven end bearings, insulation materials, varnishing, heating reassembling, testing and commissioning for the following capacities complete all as directed. Note :- Motor removed for rewinding shall be overhauled completely and the quoted rate shall be deemed to be inclusive for the same.
a) 10 HP Motor
b) 2 to 3 HP Motor
Supply and fixing ON LOAD changerover front operated 4 Pole 630 Amps complete all as specified and directed. Make: L&T/Legrand / Havells
Supply and fixing ML-2 Contactor 3 pole operating voltage 230 V, 50 Hz complete all as specified and directed. Make: L&T /Legrand
Supply and fixing ML-3 Contactor 3 pole, operating voltage 230 V, 50 Hz complete all as specified and directed. Make: L&T / Legrand
Supply and Replace Off Load Changeover including sheet metal enclosur with side handle 630 Amps 4 pole 240 V complete all as specified and directed. Make L&T/ Havells
Supply and Replace Off Load Changeover including sheet metal encloser with side handle 400 Amps 4 pole 240 V complete all as specified and directed. Make L&T/ Havells
Supply and Replace MCCB 4pole 35 KA 400 AMPS Adjustable type complete all as specified and directed. Make : Legrand / L&T/ Havells
Supply and Replace MCCB 4pole 25 KA 250 AMPS Adjustable type complete all as specified and directed. Make : Legrand / L&T/ Havells
Removing the worn out duct insulation carefully , cleaning / preparing the surfaces and M&L for duct insulation (25mm thick) with resin bonded fibre glass wool roll of density 24 kg/Cum, with factory laminated aluminium vapour barrier, thickness of insulation as specified and including the following :- (a) M&L for cleaning the duct surface (to be insulated ) by scrapping carefully with wire brush etc. to make the surface completely free of millscale, dirt, dust, grease and other foreign materials, taking special care so that all duct joints are sealed against any leakage. (b) M&L for applying rubber based adhesive CPRX compound. (c) M&L for sealing of all longitudinal joints and circular overlaps with and including Aluminium foil tape 50 mm wide, to make the insulation leakproof. (d) M & L for securing the insulation with and including mechanically fastened nylon/ steel straps of size 12 mm/50 mm at maximum intervals of 1.2 mtr.
Supply only compressor oil.as per OEM's recommendations.
M & L for taking out damaged PVC fills of FRP cooling towers and supply and fix new pvc fills of size 600x300x150mm sutiable for mihir make cooling towers complete all as specified and directed by Engr-in -charge
Supply and replacement compressor suitable for 5.5 TR capacity package type AC unit including sealing of the compressor with brazing complete all as specified and directed. Make :Emersion portland Serial No :AWH600LH-025-A4
Supply Fabrication Installation testing and balancing of sheet metal ducts as per site requirment to suit each machine mouth connection with 22 gauge Galvanised sheet steel Ducting including providing angle iron supports flanges hangers nuts & bolts Gaskets etc and making good of all damages / disturbed portion complete all as specified and directed. Note: The ducts shall be fabricated in site for perfect mouth connection to each machine. Make : SAIL / TATA / JINDAL
S & F Mother board for 65x3TR screw chiller plant complete as specified
S&F SEMPS board for 65x3 TR screw chiller plant complete as specified
S&F Contactor for 65x3 TR screw chiller plant complete as specified. Make : Seimens 3TF47
S&F Sensor unit for 65x3 TR screw chiller plant complete as specified .
S&F Mother board for 33x3 TR semi hermetic sealed reciprocating unit complete as specified
S&F SEMPS board for 33x3 TR semi hermetic sealed reciprocating unit complete as specified
S&F Sensor unit for 33x3 TR semi hermetic sealed reciprocating unit complete as specified .
Repair and servicing to screw type compressor strip opening complete spare parts of capacity of 65 TR . Inspecting the parts for serviceability and replacement only unserviceable worn out parts in the compressor, complete assembling cleaning the system with Nitrongen gas for leak detection after flushing out the system vacuumization and charging only refrigerant gas including replacement of compressor oil of make as recommended by OEM and testing the unit on no load and full load condition including checking al the parameters etc complete all as directed. . Note : (i) Compressor oil including other minor spares which are not covered here in after shall be included in quoted rate.
(ii) Spares required shall be measured and paid as Supply only as mentioned here-in-after. (iii) Periodical monitoring / Inspecting the complete AC Plant and carrying out preventive / periodical maintenance to ensure smooth functioning of AC plant. The periodical inspection for preventive maintenance shall be carried out by the authorised technician / service engineer of OEM. (iv) If any breakdown occurs for monitoring the operational condition of AC plant during the contract period shall be attended whenever required which is included in the rate quoted.
(v) The contractor shall ensure preventive maitenance including breakdowns if any during the contract period shall be attended only by the authorised technician / service engineer of OEM. Contractor shall submit MOU with the OEM within 15 days of Accepance of tender and shall be got aprooved by GE. Inspection report duly mentioning the date of inspection, signature of service engineer and Engineer-in-charge shall be submitted for claiming payment.
Supply only following spare parts for 65TR CARRIER Model No. 30 HXY 065 :
(a) External Oil filter
(b) Drive Cores
(c') LP Transducer
(d) HP transducer
(e) Temprature sensor
(f) Sensor cable
(g) Solinoid coil
(h) HP Switch
(j) Pulse valve coil (10W)
(k) Pulse valve coil (20W)
Repair and servicing to semi hermetic sealed reciprocating type compressor of make : CARRIER MODEL NO: 30HRC-105(C) 3x33 TR inclusive taking down and dismantling the complete compressor unit and including replacement of defective spare viz cylinder , piston heads, connecting rod, crank shafts, oil pump, bearings , valves, packing kit , o’ rings , reeds, etc. and Reassembling the same including cleaning and flushing out the system , the N2 gas for leakage proof and vaccuming and charging with R-22 gas and replacement of compressor oil of make as recommended by OEM and testing the unit on no load and full load condition including checking al the parameters etc complete all as directed. Note : (i) Compressor oil including other minor spares which are not covered here in after shall be included in quoted rate.
(ii) Spares required shall be measured and paid as Supply only as mentioned here-in-after. (iii) Periodical monitoring / Inspecting the complete AC Plant and carrying out preventive / periodical maintenance to ensure smooth functioning of AC plant. The periodical inspection for preventive maintenance shall be carried out by the authorised technician / service engineer of OEM. (iv) If any breakdown occurs for monitoring the operational condition of AC plant during the contract period shall be attended whenever required which is included in the rate quoted.
(v) The contractor shall ensure preventive maitenance including breakdowns if any during the contract period shall be attended only by the authorised technician / service engineer of OEM. Contractor shall submit MOU with the OEM within 15 days of Accepance of tender and shall be got aprooved by GE. Inspection report duly mentioning the date of inspection, signature of service engineer and Engineer-in-charge shall be submitted for claiming payment.
Supply only following spare parts for 33 TR CARRIER Model No. 30HRC-105(C):
(a) Supply only valve plates with reeds
(b) supply only connecting rod
© supply only piston with rings
(d) supply only bush Bearing set
('e) supply only oil pump with accessories
(f) supply only Crank shaft
(g) supply only Packing complete
(h) supply only Suction filter
(j) supply only Oil filter
Supply and fixing of 3 TR tower AC indoor unit with suitable operation for the 240 V 50 Hz 3 /Ph complete copper for the evoprator coil and complete copper blower motor fully foam insulated of size 12 mm thick insulated inside the body and blower parts and smootyh operation blower complete 5 star rating energy efficient and as directed by Engr - in- charge. Make ; Bluestar/Daikin/ OG
Supply and fixing of 3 TR tower AC outdoor unit with scroll compressure and copper condensor coil with blue fins with non corrosion fins for the condensor with high pressured condensor and copper wounded outdoor fan motor in fully aluminium blade with R-22 gas and covered with powder coated GI sheet complete and as directed by Engr - in- charge. Make: Bluestar/Daikin/ OG
Supply and fixing of copper pipe with main cord wire and drain pipe suitable for opertion for 3 TR Tower AC of suitable size complete all as directed.
M&L for taking out unserviceable foundation frames, motor mounting brackets, structural supports and ladder from existing cooling tower and supply & fix complete set of new MS components comprising of structural support, nuts & bolts, ladder foundation frames, motor mounting brackets etc, suitable for 175 TR FRP cooling towers including motor/Main header pipe and water distrubution system like branch, tail piece and flange, installation, testing and commissioning on completion all as specified and directed
M&L for taking out unserviceable cooling tower fan motor from esisting FRP cooling towers and supply & fix new cooling tower fan motor of capacity 7.5 HP, 720 RPM, 3 phase, 415V, 50 Hz, Vertically flange mounted extended threaded shaft squirrel cage induction motor with IP-55 protection and motor protection cover all as specified and directed
M&L for taking out damaged PVC fills of FRP cooling towers and supply and fix new PVC fills of size 600 x 300 x 150 mm suitable for 175 TR FRP cooling tower make cooling towers all as specified and directed
M&L for taking out unserviceable fan deck, basin, casing panels, motor cover and inspection door from existing cooling towers and supply & fix complete set of new FRP components such as fan deck, basin casing panels, motor cover, fan blade assembly etc. suitable for 175 TR FRP cooling tower cooling towers installation, testing and comissioning on completion all as specified and directed.
M&L for fixing of foundation frames, motor mounting backets, structutural supports and ladder from existing cooling tower and supply & fix complete set of new MS components comprising of structural support, nuts & bolts, ladder foundation frames motor mounting brackets etc, suitable for CM-9 model of 'Mihir, make cooling towers including motor/main heades pipe and water distribution system like branch, tail piece and flanges, installation, testing and comissioning on completion all as specified and directed.
ANAND ENTERPRISES AND ENGINEERS
M/s.DSRK CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .