| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC | ₹4.2 L | 1 | Accepted-AOC executed agreement |
| 2 | 2₹4.2 LRejected-Finance | ₹4.2 L | 2 | Rejected-Finance second least |
| Sl No | Description | Qty | Unit | SUDHAKARAN.T.P L1 | SHYJU.K.V L2 |
|---|---|---|---|---|---|
| 1.00Retarring | |||||
| 1.00 | 3.1:Preparation of Foundation for Embankment <br> Scarifying Existing Granular Surface to a Depth of 50 mm by Manual Means<br> Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. | 70 | sqm | 46.67 ₹3,266.90 | 47.62 ₹3,333.40 |
| 1.00 | OD370308/2025-2026:Granular Sub-base with Well Graded Material (Table 400.1)<br>(A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (ii) For Grading II Material (Modified data of MoRD 4.1.A.2 using departmental GSB material) | 5.25 | cum | 231.12 ₹1,213.38 | 235.84 ₹1,238.16 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 10.5 | cum | 3,434.51 ₹36,062.36 | 3,504.6 ₹36,798.30 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 70 | sqm | 78.61 ₹5,502.70 | 80.21 ₹5,614.70 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 70 | sqm | 18.38 ₹1,286.60 | 18.76 ₹1,313.20 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 280 | sqm | 15.34 ₹4,295.20 | 15.65 ₹4,382 |
| 1.01 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 45.2 | sqm | 391.28 ₹17,685.86 | 399.27 ₹18,047 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 350 | sqm | 286.03 ₹1.0 L | 291.87 ₹1.0 L |
| 1.01 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 4.2 | cum | 64.65 ₹271.53 | 65.97 ₹277.07 |
Tender Value
₹4.2 L
EMD Value
₹10,588
Closing Date
5 Nov 2025, 3:00 pmClosed
Aneesh. K
Assistant engineer, LSGD Engineering wing, Payyannur municipality
634/26 - Pro no. 634/26 AYURVEDHA HOSPITAL BALANCE PORTION ROAD RETARRING
2025_LSGD_815801_9
AE/LSGD/ETNDR-06/2025-26
Open Tender
Civil Works - Roads
180 days
Payyannur municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹935
Yes
₹10,588
Yes
4 Jun 2026
28 Oct 2025
7 Nov 2025
28 Oct 2025
5 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
viewsbd.pdf
Tender Documents • 1.72 MB
viewnit.pdf
Additional Documents • 0.03 MB
BOQ_1366051.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid