Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC | ₹3.2 Cr | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹3.4 CrRejected-AOC | ₹3.4 Cr | L2 | Rejected-AOC REJECT |
| 3 | L3₹3.4 CrRejected-AOC NA VILLAGE SUDKAIN KALAN DISTT JIND 125116 | SUDKAIN KALAN | JIND | HARYANA | 125116 | ₹3.4 Cr | L3 | Rejected-AOC REJECT |
| 4 | L4₹3.5 CrRejected-AOC ASADUNA TODRAN TEHSIL BAHADURGARH DISTRICT JHAJJAR 124505 HARYANA | BAHADURGARH | JHAJJAR | HARYANA | 124505 | ₹3.5 Cr | L4 | Rejected-AOC REJECT |
| 5 | L5₹35.5 LRejected-AOC FARIDABAD FARIDABAD HARYANA | ₹35.5 L | L5 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | Radhey Shyam Contractor L8 | Jitender Contractor L4 | Raghbir Singh Contractor L6 | Surender Kumar Contractor L5 | Kuldeep Construction Company L7 | The Mehak Kaliraman Co-op LandC Society LTd, L2 | JOGINDER SINGH CONTRACTOR L3 | M/s. Amrit Lal Nagpal L1 | M/s Jaswinder Singh Contractor L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | S/o and C/o stone boulders of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rate for the year 2025-2026 for Ambala, Panchkula, Kaithal and Kurukshetra. | 1,247.4 | Cum | 1,410 ₹17.6 L | 1,425 ₹17.8 L | 1,884 ₹23.5 L | 1,500 ₹18.7 L | 1,519 ₹18.9 L | 1,100 ₹13.7 L | 1,516 ₹18.9 L | 1,555 ₹19.4 L | 1,377 ₹17.2 L |
Tender Value
₹4.1 Cr
EMD Value
₹8.1 L
Closing Date
7 Mar 2026, 5:00 pmClosed
KRISHAN KUMAR
W.S. Divn. Ambala
Constructing 335 mtr long RCC retaining wall left side of River Markanda in Kala Amb to protect the abadi of Rambagh colony from river Markanda
2026_HRY_505673_1
202692334A67 15FC 4CEF BAA3 C4032FF7B269144IRR
Open Tender
Civil Works
120 days
KALA AMB KALA AMB KALA AMB
as per CBD
2 documents required · 2 mandatory
₹15,000
₹8.1 L
Yes
WS DIVISION AMBALA
26 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
27 Feb 2026 - 1 Mar 2026
5 Mar 2026
S/o and C/o stone boulders of requisite size from approved quarry to site of work as per PWD specification No. 3.31 read with 23.8 and 23.9 loading, unloading and stacking as per recommended committee rate for the year 2025-2026 for Ambala, Panchkula, Kaithal and Kurukshetra.
Percentage BoQ
BoQ_Ver3.0
Contact No: 0171-4023613
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[15.1.1.2]Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORTandH specifications Ordinary soil 1.2. Manual Means Depth 3 m to 6 m [Through Rate]
[27.10.1.2]RCC Grade M25 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate]
[27.15]Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing and MoRTandH Specifications 2706 & 2200. [Through Rate]
[27.5]Plain/Re-inforced cement concrete in sub-structure complete as per drawing and MoRTandH specifications 1500,1700 and 2200. PCC Grade M15 (with concrete Mixer) Height up to 5m [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_584396.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid